| Location: | Georgia |
|---|---|
| Posted: | Feb 20, 2025 |
| Due: | Apr 4, 2025 |
| Agency: | City of Sandy Springs |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 25-034 |
| Publication URL: | To access bid details, please log in. |
Project Description: This project includes the construction of sidewalk on Evergreen Drive from existing sidewalk at Greenwood Close to Peachtree Dunwoody Road (S2164). The western terminus of the project includes a rapid flashing beacon and crosswalk with associated pavement markings to connect sidewalk on the north and south side of Evergreen Drive. The project will install approximately 570 LF of sidewalk, reconstruction of driveway transitions, drainage system including but not limited to 9 LF of 24” RCP with one (1) drop inlet, and construction of one gravity wall, and other associated improvements.

With GovernmentContracts, you can:
...sealed bids for 2026 LRA total of 11.06 miles of 21 ft and ...
State Government of Georgia
Bid Due: 6/16/2026
..., Including Reconstruction 91327 Construction, Highway and Road 91319 Construction, Curb and Gutter, ...
State Government of Georgia
Bid Due: 7/01/2026
...Description 91223 Construction, General: Backfill Services, Digging, Ditching, Road Grading, Rock..., Including Reconstruction ...
State Government of Georgia
Bid Due: 6/24/2026
...Site: Link Description The construction of +- 0.58 miles of resurfacing of an ...
State Government of Georgia
Bid Due: 7/08/2026