| Location: | South Carolina |
|---|---|
| Posted: | Nov 13, 2025 |
| Due: | Dec 9, 2025 |
| Agency: | State of South Carolina - State Fiscal Accountability Authority(SFAA) |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | H59-N332-PD |
| Publication URL: | To access bid details, please log in. |
Base Bid work includes a two-ply modified bitumen roof system for approximately 212 squares. Base Bid work also includes preparing, priming, and two coats of exterior marine grade paint to the roof scuttle, gravity vents, and all structural steel including building two raised expansion joints to separate the two ends from the main roof area.

With GovernmentContracts, you can:
...Delivery Method: Design-Bid-Build Construction Cost Range: $1,750,000 to $2,250,000 Agency Project... in a ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 6/30/2026
...29303 Project Delivery Method: Design-Bid-Build Construction Cost Range: $425,000.00 - $525,000.00... Description: Roof ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 6/10/2026
...Location: 1000 Blossom Street, Columbia, Sc 29208 Project Delivery Method: Design-Bid-Build Construction...@mailbox.sc.edu Telephone: ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 6/09/2026
...: Printed: 5 Electronic: 1 ANTICIPATED PROJECT DELIVERY METHOD: Design-Bid-Build CM-R N/A AGENCY...: ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 6/08/2026