26-13 Wor982210D (Worth)

Location: Iowa
Posted: Oct 16, 2026
Due: Nov 12, 2026
Agency: State Government of Iowa
Type of Government: State & Local
Category:
  • R - Professional, Administrative and Management Support Services
Solicitation No: 26-13 Wor982210D (Worth)
Publication URL: To access bid details, please log in.
Bid Information
Bid Number

26-13 Wor982210D (Worth)

Solicitation

26-13 Wor982210D (Worth)

Solicitation Type

Request for Bids

County

Worth
Description
Description

This project is for the construction of the East and West wetland systems as shown in the plans, which will be awarded together to the lowest bidder. In general, the work includes constructing a wetland that will treat the water from an existing ditch using a solar panel powered pump. The project includes, but is not limited to, selective clearing, excavation and grading, along with tile and outlet structures, pump installation, tile installation, riprap placement, and seeding. This project includes around 7,500 cubic yards of earthwork, 700 linear feet of pipe installation, 129 tons of riprap, installation of 2 modified SW-512 intake concrete structures, 3 modified SW-513 outlet concrete structures, 2 modified SW-401 and 402 lift stations concrete structures, 3 solar pump systems and 2.5 acres of seeding. The estimated construction cost range for this project is $225,000 to $325,000.

Completion Dates:
Construction        September 1, 2027
Seeding                 December 15, 2027 (must follow seeding dates stipulated in the Specifications)
Agency Information
Number

009

Name

Agriculture and Land Stewardship

Address 1

502 E 9TH ST

Address 2

City/State/Zip

Des Moines, IA 50319
Contact Information
Contact Name

Tracy Blocker

Contact Title

Contract Manager


Contact Phone Number

(515) 344-6279

Contact Phone Extension

Contact Other Number

Contact Fax Number
Valid Dates
From

10/16/2026 4:09:00 PM

Until

11/12/2026 3:00:00 PM
Documents/Attachments

10/15/2026 5:00:52 PM

10/15/2026 4:59:11 PM

10/15/2026 4:58:43 PM

10/15/2026 4:58:10 PM

10/15/2026 4:57:25 PM

10/15/2026 4:55:54 PM

10/15/2026 4:55:38 PM

10/15/2026 4:55:18 PM

Attachment Preview

I hereby certify that this engineering document was prepared by me or under my direct supervision and that I am a duly licensed Professional Engineer under the laws of the State of Iowa. (Signature)_____________________________ (Date)_________________ Printed or typed name: Brandon C. Short, PE My renewal date is: December 31, 2026 License Number is: 29449 Pages or sheets covered by this seal: Full Document

SUPPLEMENTAL MEASUREMENT PAYMENT / ITEMS OF
WORK AND CONSTRUCTION DETAILS
FOR
D. PETERSBURG WETLAND SITE
IDALS PROJECT NO. WOR982210D
WORTH COUNTY, IOWA
BMI PROJECT NO. 25X.135549
I hereby certify that this engineering document was prepared by me or
under my direct supervision and that I am a duly licensed Professional
Engineer under the laws of the State of Iowa.
(Signature)_____________________________ (Date)_________________
Printed or typed name: Brandon C. Short, PE
My renewal date is: December 31, 2026
License Number is: 29449
Pages or sheets covered by this seal: Full Document
Iowa Department of Agriculture
CERTIFICATION
25X.135549
April 23, 2026 (C) Bolton & Menk, Inc. 2025, All Rights Reserved PAGE-1

CONSTRUCTION SPECIFICATIONS
FOR
WOR982210D Nutrient Reduction Wetland
Worth County, Iowa
List of Specifications
Specification Number Title Page
001 SITE PREPARATION 3
005 POLLUTION CONTROL 5
006 SEEDING AND MULCHING FOR 7
PROTECTIVE COVER
008 MOBILIZATION AND DEMOBILIZATION 11
STANDARD DETAIL FOR SIGN INSTALLATION 13
009 SUBSURFACE DRAIN INVESTIGATION, 14
REMOVAL, AND REPAIR
011 REMOVAL OF WATER 18
021 EXCAVATION 20
023 EARTHFILL 23
026 TOPSOIL 27
031 CONCRETE 29
045 PLASTIC (PE, PVC) PIPE 36
046 TILE DRAINS FOR LAND DRAINAGE 40
051 CORRUGATED METAL PIPE CONDUITS 44
061 LOOSE ROCK RIPRAP 48
095 GEOTEXTILE 50
These specifications are part of the construction plans. The work shall be performed in accordance
with the drawings and specifications unless otherwise approved, in writing, by the engineer. For items
of work requiring engineer inspection, it is the responsibility of the contractor to keep the engineer
informed of the progress of work so that timely inspections may be performed. Work installed without
engineer inspection will not be certified as meeting NRCS standards. For references to SUDAS, see
https://www.iowasudas.org/manuals/specifications-manual/

Natural Resources Conservation Service
Construction Specification
000 IA-1 Site Preparation
1. SCOPE
Site preparation work shall consist of clearing, grubbing, stripping, refuse removal, bank sloping and
structure removal on the site as necessary to rid the site of all undesirable materials on or near the
surface and prepare the site for the structure. All woody growth within the construction area shall be
cleared and all stumps and roots one inch in diameter or larger shall be grubbed from the site. In addition,
all areas within 25 feet of the footprint of the structure shall be cleared and grubbed except as directed by
NRCS. The work shall also consist of the removal and disposal of structures (including fences) that must
be removed to perform other items of work.
For wetland restoration, enhancement, or creation projects, the wetland area shall be disturbed as little as
possible and existing naturally vegetated spillway areas shall not be disturbed.
2. FOUNDATION PREPARATION
The construction areas shall be stripped a minimum of 6 inches to remove all unsuitable materials such
as organic matter, grasses, weeds, sod, debris, and stones larger than 6 inches in diameter.
In an earth embankment foundation area, all channel banks and sharp breaks shall be sloped to no
steeper than 1.5 horizontal to 1 vertical.
The foundation area shall be thoroughly scarified before placement of fill material. The surface shall have
moisture added or shall be compacted if necessary so that the first layer of fill material can be compacted
and bonded to the foundation.
3. STRIPPED MATERIAL DISPOSAL
Suitable soil material shall be stockpiled for use as topsoil. The other stripped materials shall be buried,
removed from the site, or disposed of as directed by the owner or NRCS. Whenever possible, material
shall not be disposed of in the pool area created by the structure.
Stockpiled materials around a construction site should be placed so as not to hinder subsequent
construction operations.
4. DISPOSAL OF REFUSE MATERIALS
Waste materials from clearing and structure removal shall be burned or buried at locations approved by
the owner. Buried materials shall be covered with a minimum of 2 feet of earthfill. Whenever possible,
material shall not be disposed of in any pool area created by the structure.
All refuse shall be disposed of in a manner which complies with all local and state regulations.
5. SALVAGE
Items to be salvaged shall be as shown on the drawings. Structures and fencing materials that are
designated to be salvaged shall be carefully removed and neatly placed in the specified storage areas.
6. SPECIFIC SITE REQUIREMENTS
A. Measurement and Payment
Compensation for any work item described in the contract documents but not listed in the bid
schedule will be included in the payment for the item of work to which it is made subsidiary. Such
items and bid items to which they are made subsidiary are identified in Items of Work and
Construction Details section of this specification.
NRCS, IA SPECIFICATION - Page 1 of 2 July 2013

1. Bid Item No. 1 - "Site Stripping and Preparation"
2. Bid Item No. 2 - "Crop Damages"

For items of work which lump sum prices are established in the contract, the quantity of work will not
be measured for payment. Payment for each item will be made at the contract lump sum price and
will constitute full compensation for completion of the work.
For items of work for which specific unit prices are established in the contract, the payment will be
made based on the approved quantity measured by the engineer or weight tickets. Payment will
constitute full compensation of the work completed as defined by each work item.
B. Items of Work and Construction Details
1. Bid Item No. 1 - "Site Stripping and Preparation"
This item will consist of work to remove and dispose of existing material to remove vegetation on
areas to be excavated or filled. Total depth of vegetative stripping and topsoil stripping shall equal
a combined depth of 12". The topsoil replacement quantity shall be paid separately.
This item will also include any tree and brush removal along with any fences. These shall be
considered incidental to site stripping.
This item will be paid out as a lump sum.
2. Bid Item No. 2 - "Crop Damages"
This item consists of crop damage that results from construction activities. It is recommended
contractor remove corn residue rather than knock it down.
Payment for crop damage will be made to the nearest 0.1 acre as measured by the Engineer or
their representative. The unit rate for crop damage will be determined by the Division near the
completion of construction and added to the contract with a Change Order. Payment will be made
to contractor who will pay landowner.
NRCS, IA SPECIFICATION - Page 2 of 2 July 2013

Natural Resources Conservation Service
Construction Specification
000 000 IA CS-005 Pollution Control 2011
1. SCOPE
The work shall consist of installing measures or performing work to control erosion and minimize the
production of sediment and other pollutants to water and air during construction operations.
2. MATERIALS
All materials furnished shall meet the requirements shown on the drawings or in the specifications.
3. EROSION AND SEDIMENT CONTROL MEASURES AND WORKS
The measures and works shall include, but are not limited to, the following:
Staging of Earthwork Activities: The excavation and moving of soil materials shall be scheduled so that
areas unprotected from erosion will be minimized. These areas will be unprotected for the shortest time
feasible.
Seeding: Structures and disturbed areas shall be seeded as soon as possible after construction is
completed.
Temporary seedings may be used as an alternative to other stabilization measures as approved by
NRCS.
Mulching: Construction areas that have been disturbed but have no construction activity scheduled for
21 days or more shall have erosion protection measures applied by the 14th day. This erosion protection
may be mulching or other approved temporary measures. Construction areas shall not be left open during
a winter shutdown period and shall be protected by mulching.
All seeding and mulching shall be completed in accordance with the seeding plan and Iowa Construction
Specification IA-6, Seeding and Mulching for Protective Cover.
The following works may be temporary. If they are installed as a temporary measure, they shall be
removed and the area restored to its original state when they are no longer needed or when permanent
measures are installed.
Diversions: Diversions may be required to divert clean runoff water away from work areas and to collect
runoff from work areas for treatment and safe disposition.
Stream Crossings: Culverts or bridges may be required where construction equipment must cross
streams.
Sediment Basins: Sediment basins may be required to settle and filter out sediment from eroding areas
to protect properties and streams below the construction site.
Sediment Filters: Straw bale filters, geotextile sediment fences, or other equivalent methods may be
used to trap sediment from areas of limited runoff. Sediment filters shall be properly anchored to prevent
erosion under them.
Waterways: Waterways may be required for the safe removal of runoff from fields, diversions, and other
structures or measures.
4. CHEMICAL POLLUTION
The Contractor shall provide watertight tanks or barrels or construct a sump sealed with plastic sheets to
be used to dispose of chemical pollutants, such as drained lubricating or transmission oils, greases,
soaps, concrete mixer wash water, asphalt, etc., produced as a by-product of the construction work.
At the completion of the construction work, sumps shall be removed and the area restored without
causing pollution.
NRCS, IA SPECIFICATION - Page 1 of 2 February 2011

Sanitary facilities such as chemical toilets or septic tanks shall not be placed adjacent to live streams,
wells, or springs. They shall be located at a distance sufficient to prevent contamination of any water
sources. At the completion of construction work, facilities shall be disposed of without causing pollution.
5. AIR POLLUTION
The burning of brush or trash or disposal of other materials shall adhere to local and state regulations.
Fire prevention measures shall be taken to prevent the start or the spreading of wild fires, which result
from project work. Fire breaks or guards shall be constructed at locations shown on the drawings.
All public access or haul roads used by the contractor during construction of the project shall be sprinkled
or otherwise treated to fully suppress dust. All dust control methods shall insure safe operations at all
times. If chemical dust suppressants are used, the material shall be a commercially available product
specifically designed for dust suppression and the application shall follow manufacturer's requirements
and recommendations. A copy of the product data sheet and manufacturer's recommended application
procedures shall be provided to the Engineer five working days before use.
6. MAINTENANCE, REMOVAL, AND RESTORATION
All pollution control measures and works shall be adequately maintained in a functional condition as long
as needed during the construction operation. All temporary measures shall be removed and the site
restored to as near original conditions as practical.
7. SPECIFIC SITE REQUIREMENTS
A. Measurement and Payment
Compensation for any work item described in the contract documents but not listed in the bid
schedule will be included in the payment for the item of work to which it is made subsidiary. Such
items and bid items to which they are made subsidiary are identified in Items of Work and
Construction Details section of this specification.
For items of work which lump sum prices are established in the contract, the quantity of work will not
be measured for payment. Payment for each item will be made at the contract lump sum price and
will constitute full compensation for completion of the work.
For items of work for which specific unit prices are established in the contract, the payment will be
made based on the approved quantity measured by the engineer or weight tickets. Payment will
constitute full compensation of the work completed as defined by each work item.
B. Items of Work and Construction Details
1. Subsidiary Item - Pollution Control
This item shall consist of applying and performing all construction activities in a manner that will
minimize water pollution, air pollution and soil erosion.
No separate payment will be made for Pollution Control. Compensation for this item will be other
items as appropriate.
NRCS, IA SPECIFICATION - Page 2 of 2 February 2011

Natural Resources Conservation Service
Construction Specification
000 IA-6 Seeding and Mulching for Protective Cover
1. SCOPE
The work shall consist of seeding, mulching, and fertilizing all disturbed areas and other areas as
indicated on the drawings or otherwise designated.
2. SEEDBED PREPARATION AND APPLICATION
The entire area to be seeded shall be reasonably smooth and all washes and gullies shall be filled to
conform to the desired cross-section before actual seedbed preparation is begun. At this stage of the
operation, the required fertilizer and lime shall be applied uniformly and incorporated into the top 3 inches
of the soil with suitable tillage equipment. The seedbed preparation operation shall be suspended when
the soil is too wet or too dry. The seedbed shall be loosened to a depth of at least three inches.
On side slopes steeper than 2-1/2 horizontal to1 vertical, the 3 inch minimum depth of seedbed
preparation is not required, but the soil shall be worked enough to insure sufficient loose soil to provide
adequate seed cover.
Unless otherwise specified, the seeding operation shall be performed immediately after preparation of
the seedbed. The seed shall be drilled or broadcast by equipment that will insure uniform distribution of
the seed.
3. MATERIALS
The seeding, fertilizing, and mulching requirements are as specified on Form IA-CPA-4.
Straw from cereal grains or hay will be used as mulching material. It shall be relatively free of weeds.
4. MULCH APPLICATION
The required mulching shall be performed as soon as possible after seeding unless otherwise specified.
The mulch shall be applied uniformly over the area. The type and rate shall be as specified. When
mulching is required, all areas seeded during any one day shall be mulched within 24 hours. The mulch
may be spread by any means that results in a uniform cover.
The mulch shall be anchored. Anchoring of the mulch may be performed by a mulch anchoring tool or
regular farm disk weighted and set nearly straight, by installation of mulch netting, or by other methods
approved by NRCS.
5. SPECIFIC SITE REQUIREMENTS
A. Measurement and Payment
Compensation for any work item described in the contract documents but not listed in the bid
schedule will be included in the payment for the item of work to which it is made subsidiary. Such
items and bid items to which they are made subsidiary are identified in Items of Work and
Construction Details section of this specification.
For items of work which lump sum prices are established in the contract, the quantity of work will not
be measured for payment. Payment for each item will be made at the contract lump sum price and
will constitute full compensation for completion of the work.
NRCS, IA SPECIFICATION - Page 1 of 4 February 2011

1. Bid Item No. 3 - "Structure and Channel Seeding"
2. Bid Item No. 4 - "Buffer Seeding"

For items of work for which specific unit prices are established in the contract, the payment will be
made based on the approved quantity measured by the engineer or weight tickets. Payment will
constitute full compensation of the work completed as defined by each work item.
B. Items of Work and Construction Details
1. Bid Item No. 3 - "Structure and Channel Seeding"
This item will consist of seeding the dike except the upstream side slope below the weir elevation,
auxiliary spillway, the tile outlet channel side slopes and any other disturbed areas noted on the
plans or as determined by engineer.
All seed must be clean and weed free. Seeding rates are expressed in bulk pounds per acre.
Seed quality shall not drop below 70% Pure Live Seed (PLS) where PLS = (percent germination
plus percent dormant seed) times percent purity.
Seeding rates are as follows:
Smooth Brome grass 25 pounds/acre
Seed shall be applied with a drill and placed at 14 to 12 inch deep.
Fertilizer shall be applied on the entire seeding area at the following rate:
Nitrogen (N) 30 pound/acre
Phosphorus (P O ) 30 pounds/acre
2 5
Potassium (K O) 40 pounds/acre
2
Straw mulch shall be applied at a rate of 2 tons per acre on all areas receiving structure and
channel seeding.
Seeding shall be completed during the following seeding periods:
Spring March 1 to May 15
Summer August 1 to September 15
Fall November 15 to Freeze-up
If construction is completed during any other time of the year, the seeding shall be performed at
the next seeding period.
If seeding is completed during the spring seeding period, a companion crop of oats shall be
seeded at a rate of 1-1/2 bushels per acre.
Measurement will be based on the areas successfully seeded to the nearest 0.1 acre.
2. Bid Item No. 4 - "Buffer Seeding"
This item will consist of seeding the areas designated on the plans as buffer seeding and include
borrow areas, disturbed areas not seeded as part of structural seeding, and other areas within the
easement. Buffer seeding is not required in area below normal pool elevation established by the
weir elevation.
NRCS, IA SPECIFICATION - Page 2 of 4 February 2011

Some areas of the site may have existing CRP vegetation or steep slopes with existing
vegetation. Local NRCS personnel will determine if these areas will be included as part of the
buffer seeding areas for this project or will be left as is. This may affect the bid quantity and
Contractor will verify with Engineer the number of acres that will require buffer seeding.
All seed must be clean and weed free. Seeding rates are expressed in pounds of pure live seed
per acre. All seed must be yellow-tagged Iowa ecotype unless approved otherwise by IDALS-
DSCWQ.
Seeding mixture shall include a minimum of 5 native grasses and 10 native forbs. The mixture
shall provide a minimum of 30 grass seeds per square foot and 10 forbs seeds per square foot.
Number of seeds will be based on Iowa Conservation Practice 327 "Native Species for Wildlife".
Contractor's proposed seed mix shall be submitted to Engineer and local NRCS office for
approval at least 2 weeks before seed is to be applied.
Seeding shall be completed during the following seeding periods:
Spring April 1 to June 30
Fall November 15 to Freeze-up
The seed bed shall be properly prepared prior to seeding:
(a) Any weed control measures shall be completed prior to seeding. If spraying is used,
then a span of two weeks shall be allowed between spraying and seeding.
(b) If the land was in soybeans, no additional tillage is required. If the land was in corn
or other vegetation, areas to be seeded shall be disked to thoroughly loosen and
pulverize the soil to a depth of 3 inches. This may require multiple passes of
equipment. If the land was used for pasture and has a smooth surface, the
preparation in non-disturbed areas to be seeded shall include mowing any vegetation
taller than 12 inches and applying an appropriate herbicide at the labeled rates to
emergent growth 2 to 4 weeks after mowing. After the vegetation has died, the area
shall be disked thoroughly loosen and pulverize the soil depth of 3 inches. If
emergent growth occurs prior to seeding, the areas shall receive a second
application of herbicide. Seeding shall not occur until the existing vegetation has
died (about 1 week).
(c) If deeper disking is used at the site, a lighter disk or spring harrow shall be used to
remove deep furrows.
(d) After disking operations and prior to seed application, the seedbed shall be firmed
with a cultipacker or similar piece of equipment.
(e) No lime or fertilizer is to be applied.
Sow seed with contour using a grassland or rangeland drill set for the specified seeding rates.
The drill shall be equipped with double coulter furrow openers. The drill shall be subject to
acceptance by Engineer. Overlap each successive seeding pass to ensure complete coverage.
Plant seed not more than 1/4 inch deep; some seed may be seen on the surface after seeding.
Broadcasting by centrifugal-type or hydroseeder broadcasters, or by hand shall be allowed in
areas not accessible to drills or other equipment. Once broadcast, the seed must be covered
with soil to a depth no greater than 1/4 inch by means of hand rakes or other approved methods.
NRCS, IA SPECIFICATION - Page 3 of 4 February 2011

Upon completion of the seeding operation, cultipack the seedbed to provide a positive seed-soil
contact. If the drill seeder is equipped with an approved cultipacker or press wheels, separate
operations shall not be necessary. The type of cultipacker/seeder to be used shall be subject to
acceptance by Engineer.
No mulch shall be required.
Measurement will be based on the area successfully seeded and measured to the nearest 0.1
acre.
3. Subsidiary Item - Weed Control
Weed control may be needed in portions of this site depending upon the start date of the contract,
the initiation of grading, and the seeding dates.
Weed control will be added to the contract with a change order to be negotiated between
Contractor and Division based on conditions observed and the type of weed control used and will
be paid only once. If delays require additional weed control, this will be paid for at Contractor's
own expense.
Weed control may include placement of a cover crop such as oats or rye, spraying with
appropriate chemicals, or disking. If thistles are present, only spraying is allowed for weed
control and shall include appropriate chemicals designed to control thistles.
NRCS, IA SPECIFICATION - Page 4 of 4 February 2011

This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

Bid Information Type Request for Proposal - Online Status Issued Number NA (Microsoft

City of West Des Moines

Bid Due: 11/23/2026

Project Name and Project Number Filing Date Bid or Quote Opening Date 2nd

City of Cedar Rapids

Bid Due: 11/18/2026

Bid Number Bid Title Bid Type Organization Bid Issue Date Bid Close Date

City of Cedar Rapids

Bid Due: 11/18/2026

Bid Number Bid Title Bid Type Organization Bid Issue Date Bid Close Date

City of Cedar Rapids

Bid Due: 11/18/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.