Introduction
The Northern California Power Agency (NCPA), a California Joint Action Agency, was established
in 1968 by a consortium of locally owned electric utilities to make joint investments in energy
resources that would ensure an affordable, reliable, and clean supply of electricity for
customers in its member communities. NCPA members include municipalities, a rural electric
cooperative, and other publicly owned entities for which the not-for-profit agency provides
such services as the purchase, aggregation, scheduling, and management of electrical energy.
Overview
The purpose of this Request for Proposal (RFP) is to solicit qualified vendors to provide a
modern Supervisory Control and Data Acquisition (SCADA) replacement solution for the
organization’s Headquarters and Disaster Recovery Control Centers. The selected solution must
support secure, reliable, and scalable operations within the energy sector, comply with
applicable regulatory requirements, and integrate seamlessly with existing enterprise systems.
Non-Disclosure Agreement
In order to receive additional details of the existing architecture needed to prepare your
proposal, respond to this notification expressing your interest. Respondents will be sent a
nondisclosure agreement (NDA), an example of which is found in Attachment A.
Address your response to:
• SCADA RFP
• Reference RFP# IS-07-2026
• Email: SCADA.RFP@ncpa.com
• Phone: (916) 781-3636
Include:
• The legal company name and any acronym goes by
• Whether it is a sole proprietorship, partnership or corporation
• Company address
• Name & title of the singer who will be signing the NDA
• Email address of the signer
Respondents will receive the NDA filled out with the proposing company’s information.
Sign and return it, NCPA will countersign and return a fully executed copy, along with
the detail sheets needed to complete your proposal.
Execution of this NDA does not obligate NCPA to disclose any confidential information
to a third-party vendor. NCPA reserves the right, at its sole discretion, to withhold such
information for any reason.
Submittals
Please submit proposals to NCPA Headquarters no later than 5:00 PM Pacific Daylight Time
on 9/18/2026. NCPA will accept proposals via email or sent as a hard copy. The proposal,
along with any questions about this RFP, should be addressed to:
SCADA RFP
651 Commerce Drive, Roseville CA 95678
SCADA.RFP@ncpa.com
Tentative Schedule
RFP Issued
Deadline for Questions
Proposal Due
Review Responses
Respondent Interviews/Demos as needed
Selection of Respondents
Contract Preparations
Agency approval of contracts
Work commences
7/31/2026
08/28/2026
09/18/2026
9/30/2026
10/01/2026
10/31/2026
November 2026
December 2026
January 2027
RFP – NCPA SCADA Control Center Replacement
Page 2
1. Existing Environment
For an existing environment summary and breakdown an additional NDA will need to be
signed. Please contact SCADA.RFP@ncpa.com to initiate that process.
2. High Level Requirements
Vendors must complete attachment IS-SCADA-REPLACEMENT-RFP-MATRIX_07-2026.xlsx
SCADA requirements matrix and send along with the submittal.
2.1. Qualifications & Experience of Company
Give a brief company description including:
• Identify years in business.
• Number of employees in the office location which is intended to provide services.
• Relevant experience
2.2. Contract Exceptions – The Company selected will be expected to execute NCPA’s
standard Agreement, a sample of which is attached for reference in Appendix A. The
proposal shall state all exceptions taken to the terms and conditions of the Agreement,
if any.
Note: Make sure to review the insurance requirements in detail. You will be asked to
provide proof of insurance and copies of all waivers and endorsements if selected.
2.3. Proposal for Scope of Work – Vendors are responsible for responding to how they will
perform services outlined in the scope of work below.
2.4. References - Vendor will provide at least two references for similar services.
2.5. Pricing - Proposal must include itemized pricing for services listed in the Scope of Work.
To control the schedule and final costs, NCPA reserves the right to adjust the proposed
deliverables and Scope of Work negotiations with the selected respondent.
2.6. Timeline
Project is expected to begin after January 2027 and is expected to be completed by
April 2028
RFP – NCPA SCADA Control Center Replacement
Page 3
Detailed Scope of Work
The following scope of work will be conducted at NCPA’s physical Headquarters and Disaster
Recovery Center (DRC) location:
Headquarters
651 Commerce Drive
Roseville, CA 95678
Disaster Recovery Center (DRC)
5034 Sunrise Blvd
Fair Oaks, CA 95628
The scope of work for this project includes the following key components to be successful:
• Vendor must understand the current architecture and environment and prepare a plan
for how to best transition from the old Control Center SCADA solution to the new.
• The proposed SCADA solution must continue to work within the existing network
architecture and security requirements. This includes being able to operate within a
virtualized hypervisor system, communicate through network segmentations using
firewalls, traditional IT networks, and maintain existing NERC CIP compliance for the
Control Centers.
• Vendor must propose a solution that provides both fault tolerance for both local server
failures as well as the capability to automatically resume operations at the Agency’s
Disaster Recovery Center (DRC).
• Development and testing environments also must be included in the proposal, which
should include methods for testing changes and updates prior to being rolled into
production. Screen development, database changes, updates, and security patches
must be considered.
• Proposed solutions must include methods for preserving existing SCADA elements such
as migrating or recreating where needed existing set points, logic, screens, alarms and
security roles.
• Vendor will be responsible for leading the project through the proposed phases and
provide technical expertise in their solutions including design, testing, migration, and
post-production roll out. NCPA will provide subject matter experts related to the
Agency’s Operations, SCADA engineering, IT systems administration, and cybersecurity
as part of this process.
• Proposals must also include support for solutions to interface with existing 3rd party
integrations that are used within the Agency. This includes historical data trending,
database archiving, and API calls between custom applications.
RFP – NCPA SCADA Control Center Replacement
Page 4
3. Technical Requirements
Vendors must complete attachment IS-SCADA-REPLACEMENT-RFP-MATRIX_07-2026.xlsx
SCADA requirements matrix and send along with the submittal.
3.1. Asset Support
The proposed solution must be able to seamlessly integrate with a variety of different
electric sector assets for control and monitoring capabilities. These include but not
limited to:
• Combustion Turbine Power Plants
• Hydro Electric Power Plants
• Geothermal Power Plants
• Renewable Energy solutions such as:
• Solar
• Wind
• Battery
• Metering
• CAISO Remote Intelligence Gateways (RIGs)
• Control Center to Control Center communications
• Electric Vehicle Charging Stations
• Building maintenance assets such as HVAC, Power Systems, UPS and other
environmentals.
• Vendor solution must support working within a virtualized environment
3.2. Network Design
• Systems must be able to operate within the following:
• Standard TCP/IP network environments
• Comply with NERC CIP networking standards including NERC-005 Electronic
Security Perimeters
• Comply with ISA-99 Industrial Automation Control System networks
• Vendors must provide documentation for all related service ports used for their
solutions, this includes but not limited TCP, UDP and ICMP protocols.
3.3. Industrial Protocol Support
The proposed SCADA solution must natively support common ICS/OT protocols, including:
• DNP3 (serial and TCP/IP)
• Modbus (RTU and TCP)
• ICCP/TASE.2
• OPC (Both UA and DA)
• Include secure authentication where applicable.
• Ability to operate as both a client and server
• Must handle high volume telemetry without degradation.
• Must support configurable scan rates down to sub second intervals.