| Location: | Louisiana |
|---|---|
| Posted: | Sep 25, 2026 |
| Due: | Oct 22, 2026 |
| Agency: | City of Shreveport |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
| Engineering Firm: | Volkert, Inc. |
|---|---|
| Engineer's Name: | Clinton C. Patrick, P.E. |
| Engineer's License No.: | LA 40919 |
| Date: | September 3, 2026 |
| 09/03/2026 |
Montana Street Bridge Improvements 100% FINAL SUBMITTAL
SEALS AND CERTIFICATIONS
ENGINEER'S CERTIFICATION:
I hereby certify that the General Requirements, Sections from Division 5, and the Special Provisions of
these Supplemental Specifications were prepared by me or under my direct supervision and that I am a duly
Licensed Professional Engineer under the laws of the State of Louisiana.
Engineering Firm: Volkert, Inc.
Engineer's Name: Clinton C. Patrick, P.E.
Engineer's License No.: LA 40919
Date: September 3, 2026
09/03/2026
Page 1
MONTANA STREET BRIDGE IMPROVEMENTS 100% FINAL SUBMITTAL
TABLE OF CONTENTS
PART 1: GENERAL PROVISIONS SERIES
SECTION 100 Definitions and Abbreviations .............................................................. 100
SECTION 101 Bidding Requirements .......................................................................... 101
SECTION 102 Award and Execution of Contract ......................................................... 102
SECTION 103 Scope of Work ...................................................................................... 103
SECTION 104 Control of Work .................................................................................... 104
SECTION 105 Changes in Work ................................................................................... 105
SECTION 106 Control of Materials .............................................................................. 106
SECTION 107 Governmental Regulations ................................................................... 107
SECTION 108 Contractor's Responsibilities ................................................................ 108
SECTION 109 Utilities .................................................................................................. 109
SECTION 110 Prosecution and Progress of Work ....................................................... 110
SECTION 111 Measurement and Payment ................................................................. 111
PART 2 - MATERIALS
SECTION 200 Aggregates ............................................................................................ 200
SECTION 201 Concrete, Mortar and Related Materials ............................................. 201
SECTION 202 Masonry Materials................................................................................ 202
SECTION 203 Soil and Grasses .................................................................................... 203
SECTION 204 Bituminous Materials ........................................................................... 204
SECTION 205 Timber and Preservative Treatment .................................................... 205
SECTION 206 Piles ....................................................................................................... 206
SECTION 207 Miscellaneous Metal ltems ................................................................... 207
SECTION 208 Storm Drain Pipe ................................................................................... 208
SECTION 209 Water and Sewer - Piping and Appurtenance ...................................... 209
SECTION 210 Paint and Protective Coatings .............................................................. 210
SECTION 211 Geotextile Fabric and Geocomposite Systems ..................................... 211
SECTION 212 Erosion Control Matting and Hardware ............................................... 212
SECTION 213 Traffic Signal Materials ......................................................................... 213
SECTION 214 NOT USED ............................................................................................. 214
SECTION 215 Signs and Pavement Markings .............................................................. 215
TOC-1
MONTANA STREET BRIDGE IMPROVEMENTS 100% FINAL SUBMITTAL
PART 3 - EARTHWORK SERIES
SECTION 301 Clearing and Grubbing .......................................................................... 301
SECTION 302 Removal of Structures and Obstructions ............................................. 302
SECTION 303 Roadway Excavation ............................................................................. 303
SECTION 304 Fill Construction .................................................................................... 304
SECTION 305 Borrow Excavation ................................................................................ 305
SECTION 306 Muck Excavation ................................................................................... 306
SECTION 307 Channel Excavation .............................................................................. 307
SECTION 308 Structural Excavation and Backfill ........................................................ 308
SECTION 309 Rip-rap Construction............................................................................. 309
SECTION 310 Temporary Erosion Control .................................................................. 310
PART 4 - ROADWAY SUBGRADE PREPARATION AND BASE COAT
SECTION 401 Subgrade Preparation ........................................................................... 400
SECTION 402 Soil Cement Base .................................................................................. 201
SECTION 403 Aggregate Base ..................................................................................... 202
SECTION 404 Base Reinforcement ............................................................................. 203
SECTION 405 Pavement Undersealing ....................................................................... 204
PART 5 - AGGREGATE SURFACE COURSE
SECTION 501 Aggregate Surface Course .................................................................... 501
SECTION 502 Tack Coat .............................................................................................. 502
SECTION 503 Prime Coat ............................................................................................ 503
SECTION 504 Asphaltic Surface Treatment ................................................................ 504
SECTION 505 Asphaltic Concrete Friction Course ...................................................... 505
SECTION 506 Slurry Seal Coat Surfacing ..................................................................... 506
SECTION 507 Asphaltic Concrete Pavement .............................................................. 507
SECTION 508 Cold Planing Asphaltic Pavement ......................................................... 508
SECTION 509 Portland Cement Concrete Pavement .................................................. 509
TOC-2
MONTANA STREET BRIDGE IMPROVEMENTS 100% FINAL SUBMITTAL
PART 6 - CONCRETE CONSTRUCTION SERIES
SECTION 601 Concrete Structures .............................................................................. 601
SECTION 602 Pneumatic Placed Concrete .................................................................. 602
SECTION 603 Precast Concrete .................................................................................. 603
SECTION 604 Prestressed Concrete ............................................................................ 604
SECTION 605 Concrete Curbs, Walks, Gutters, Driveways ......................................... 605
SECTION 606 Concrete Reinforcement ...................................................................... 606
SECTION 607 Drilled Shaft Foundations ..................................................................... 607
SECTION 608 Ditch Paving and Concrete Revetment ................................................. 608
SECTION 609 Raising, Void Filling and Undersealing
Pavements Using Polyurethane ............................................................ 609
PART 7 - MASONRY CONSTRUCTION (NOT USED)
SECTION 701 Concrete Masonry Unit Construction ................................................... 701
SECTION 702 Brick Masonry ....................................................................................... 702
SECTION 703 Mechanically Stabilized Earth Wall with Masonry Unit ....................... 703
PART 8 - METAL FABRICATION AND CONSTRUCTION
SECTION 801 Structural Steel ..................................................................................... 801
SECTION 802 Metal Railings ....................................................................................... 802
SECTION 803 Chain Link Fence ................................................................................... 803
PART 9 - PILE DRIVING AND TIMBER CONSTRUCTION
SECTION 901 Pile Driving ............................................................................................ 901
SECTION 902 Timber Construction ............................................................................. 902
PART 10 - PIPELINE CONSTRUCTION
SECTION 1001 Storm Drain Pipe Installation .............................................................. 1001
SECTION 1002 Excavation and Backfill ....................................................................... 1002
SECTION 1003 Abandonment of Existing Water Main and
Sanitary Sewer Facilities ..................................................................... 1003
SECTION 1004 Trench Safety Systems ........................................................................ 1004
SECTION 1005 Trench Dewatering ............................................................................. 1005
SECTION 1006 Boring, Tunneling and Pipe Jacking Operations ................................. 1006
TOC-3
MONTANA STREET BRIDGE IMPROVEMENTS 100% FINAL SUBMITTAL
PART 11 - PAINTING SERIES
SECTION 1101 Coating ................................................................................................ 1101
PART 12 - MISCELLANEOUS CONSTRUCTION
SECTION 1201 Landscaping and Seeding ................................................................... 1201
SECTION 1202 Mobilization ........................................................................................ 1202
SECTION 1203 Erosion Control Systems ..................................................................... 1203
SECTION 1299 Elevated Sleeve Pile Repair System ........................................................1299
PART 13 - TRAFFIC
SECTION 1301 Traffic Signs and Devices .................................................................... 1301
SECTION 1302 Traffic Control Components ............................................................... 1302
SECTION 1303 Plastic Pavement Markings................................................................. 1303
SECTION 1304 Painted Traffic Striping ....................................................................... 1304
SECTION 1305 Raised Pavement Markers .................................................................. 1305
SECTION 1306 Temporary Signs, Barricades, Barriers & Pavement Markings ........... 1306
SECTION 1307 Street Lighting .................................................................................... 1307
PART 14 - NOT USED
PART 15 - BYPASS PUMPING (NOT USED)
SECTION 1510 Bypass Pumping .................................................................................. 1501
PARTS 16 THRU 19 - NOT USED
TOC-4
MONTANA STREET BRIDGE IMPROVEMENTS 100% FINAL SUBMITTAL
PART 20 - SEWER (NOT USED) SERIES
SECTION 2000 Gravity Sewer Mains ........................................................................... 2000
SECTION 2100 Sewer Force Mains ............................................................................. 2100
SECTION 2200 Sanitary Sewer Manholes ................................................................... 2200
SECTION 2210 Manhole Rehabilitation ...................................................................... 2210
SECTION 2220 Monolithic Manhole Lining Systems................................................... 2220
SECTION 2300 Sanitary Sewer Testing of Pipes and Manholes .................................. 2300
SECTION 2400 Manhole Inflow Preventers ................................................................ 2400
SECTION 2650 Sewer Line and Service Lateral Cleaning ............................................ 2650
SECTION 2652 Television Inspection .......................................................................... 2652
SECTION 2654 Removal of Protruding Taps and Obstructions by Other Means ....... 2654
SECTION 2656 Point Repairs ....................................................................................... 2656
SECTION 2680 Condition Assessment Sewer Line Cleaning and CCTV Inspection ..... 2680
SECTION 2700 Pipe Bursting ....................................................................................... 2700
SECTION 2764 Service Lateral Connection Liner ........................................................ 2764
SECTION 2765 Cured-in-Place Short Liners ................................................................ 2765
SECTION 2769 Cured-in-Place Pipe Lining .................................................................. 2769
SECTION 2800 Package Submersible Lift Station ....................................................... 2800
SECTION 2810 Wetwell Lining System........................................................................ 2810
SECTION 2900 Sewer Line Cleaning ............................................................................ 2900
PART 30 - WATER (NOT USED)
SECTION 3000 Water Mains ....................................................................................... 3000
SECTION 3100 Testing, Flushing and Sterilization of Water Mains ............................ 3100
SECTION 3200 Water Service Lines and Meter Boxes ................................................ 3200
SECTION 3300 Fire Hydrants ...................................................................................... 3300
SECTION 3400 Waterworks Valves ............................................................................. 3400
SECTION 3500 Wet Connections and Appurtenances ................................................ 3500
TOC-5
MONTANA STREET BRIDGE IMPROVEMENTS 100% FINAL SUBMITTAL
PART 40 - GENERAL REQUIREMENTS SERIES
SECTION 4010 Summary of Work ............................................................................... 4010
SECTION 4014 Construction Sequence ....................................................................... 4014
SECTION 4025 Measurement and Payment ............................................................... 4025
SECTION 4026 Pay Estimates ...................................................................................... 4026
SECTION 4035 Change Order Procedures .................................................................. 4035
SECTION 4038 Requests for Information ................................................................... 4038
SECTION 4045 Cutting, Coring and Patching .............................................................. 4045
SECTION 4050 Survey Controls ................................................................................... 4050
SECTION 4110 Storm Water Permitting Procedures .................................................. 4110
SECTION 4200 Project Meetings ................................................................................. 4200
SECTION 4300 Submittals ........................................................................................... 4300
SECTION 4310 Construction Scheduling ..................................................................... 4310
SECTION 4322 Photographic Documentation ............................................................ 4322
SECTION 4370 Schedule of Values .............................................................................. 4370
SECTION 4400 Quality Control ................................................................................... 4400
SECTION 4410 Testing Laboratory Services ................................................................ 4410
SECTION 4465 Testing and Startup............................................................................. 4465
SECTION 4480 Tightness Testing of Concrete Structures ........................................... 4480
SECTION 4500 Temporary Facilities ........................................................................... 4500
SECTION 4560 Restoration of Property ...................................................................... 4560
SECTION 4562 Dust Control ........................................................................................ 4562
SECTION 4580 Project Identification Signs ................................................................. 4580
SECTION 4600 Delivery Storage and Handling ........................................................... 4600
SECTION 4612 Seismic Design Requirements ............................................................. 4612
SECTION 4614 Wind Design Criteria ........................................................................... 4614
SECTION 4630 Substitutions and Product Options ..................................................... 4630
SECTION 4700 Contract Closeout ............................................................................... 4700
SECTION 4710 Cleaning .............................................................................................. 4710
SECTION 4720 As-Built Drawings ................................................................................ 4720
SECTION 4730 Operation and Maintenance Data and Training ................................. 4730
SECTION 4740 Warranties and Bonds ........................................................................ 4740
TOC-6
Montana Street Bridge Improvements 100% FINAL SUBMITTAL
PART I GENERAL PROVISIONS
SECTION 100
DEFINITIONS AND ABBREVIATIONS
100.1 TERMS. Unless otherwise stated, the words "direct," "required," "permitted," "ordered,"
"instructed," "designated," "considered," "necessary," "prescribed," "approved," "acceptable," "satisfactory,"
or words of like import, refer to actions, expressions and prerogatives of the Engineer.
100.2 DEFINITIONS.
Addenda. Written or graphic instruments issued prior to the opening of Bids which clarify
correct, or change the Bidding Documents.
Advertisement. A public announcement inviting bids containing the location and description
of the work, time and place of opening bids.
Asbestos. Any material that contains more than one percent asbestos or is friable or is releasing
asbestos fibers into the air above current action levels established by the Unites States
Occupational Safety and Health Administration.
As-Built Drawings. Annotated Drawings, which have been revised to reflect any changes
during construction including unforeseen site conditions.
Bid. The offer of a responsible and responsive Bidder that was submitted to the Department on
the Bid Forms, in accordance with the Bidding Documents. The bid shall be binding after
expiration of the 48 hour waiting period.
Bidder. The individual or entity who submits a Bid directly to City.
Bidding Documents. The Invitation For Bid (IFB), Special Conditions for Streets/Drainage and
Water/Sewer, the Bid Forms with any supplements, Standard Specifications for Infrastructure
Improvements, Standard Plans, Drawings, Technical Specifications, and the proposed Contract
Documents (including all Addenda).
Bid Forms. Louisiana Uniform Public Works Bid Forms and Bid Bond Form as developed by
the Office of Facility Planning and Control.
Change Order. Any contract modification that includes an alteration, deviation, addition, or
omission to the Contract, which authorizes an adjustment in the Contract Amount, Contract
Time, or an addition, deletion, or revision of the Work.
City. The City of Shreveport, Louisiana for whom the work is being performed.
City Engineer. The Department Head of the Department of Engineering and Environmental
Services.
Claim. A demand or assertion by City or Contractor seeking an adjustment of Contract
Amount or Contract Time, or both, or other relief with respect to the terms of the Contract.
Closed Specification. A product specified to the exclusion of all other products of apparent
equal quality and utility
100-1

With GovernmentContracts, you can:
Follow Extension BCO Telecommunication Services for JRB New Orleans Louisiana Active Contract Opportunity
DEPT OF DEFENSE
Bid Due: 9/24/2027
Bid Number Description Date Issued Bid Open Date/Time JPP-BidEvent#172 SEVEN OAKS/ US HWY
State Government of Louisiana
Bid Due: 11/19/2026
Bid Number Description Date Issued Bid Open Date/Time JPP-BidEvent#190 Estelle Playground Baseball Field
State Government of Louisiana
Bid Due: 11/19/2026
Date: Tuesday, November 17, 2026 Time: 2:00 PM Description: Runway 13/31 Safety Area
City of Baton Rouge
Bid Due: 11/17/2026