| Location: | California |
|---|---|
| Posted: | Nov 6, 2025 |
| Due: | Dec 9, 2025 |
| Agency: | Los Angeles County Sanitation Districts |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | JO-P-0526 |
| Publication URL: | To access bid details, please log in. |
Dollar Range: Approx. $800,000 to $1,200,000
Contact
Mathew Watson, Ext. 1620
Email: mathewwatson@lacsd.org
Advertise: 11/05/2025
Walk-Through: N/A
Bid: 12/09/2025 @ 2:00 P.M.
Award: 1/14/2026
Working Days: 150
Obtain and download electronic Bid Documents, Plan Holders List, and Project Bid Results on Quest Construction Data Network (QuestCDN) .
The project will rehabilitate approximately 4,161 feet of existing corroded 18- and 24-inch diameter reinforced concrete pipe (RCP) and cracked vitrified clay pipe (VCP) on the Joint Outfall H Unit 8L Trunk Sewer and the Joint Outfall H Unit 8L Relief Trunk Sewer with cured-in-place pipe liner and14 manholes with a protective coating system and all appurtenant work.

With GovernmentContracts, you can:
...and 10 manholes with a protective coating system and all appurtenant work....
Los Angeles County Sanitation Districts
Bid Due: 8/04/2026
...blasting, and coating system application. This filter shall remain operational during the execution..., ...
City of Shasta Lake
Bid Due: 8/13/2026
...and 10 manholes with a protective coating system and all appurtenant work....
Los Angeles County Sanitation Districts
Bid Due: 8/04/2026
...services by applying an insecticidal latex coating to the inside of maintenance holes ...
City of Los Angeles
Bid Due: 9/18/2026