| Terminal 1 Lobby Expansion and Restroom Addition, RDU Project No. 321030 |
|---|
Raleigh-Durham
International Airport
Terminal 1 Lobby Expansion and Restroom Addition,
RDU Project No. 321030
Request for Proposals
Design-Build Bridging Services
February 23, 2026
This Request for Proposals and any addenda thereto are available only on-line at
https://www.rdu.com/do-business-with-rdu/business-opportunities/
Table of Contents
1. NOTIFICATION TO POTENTIAL RESPONDENTS .......................................................... 1
2. GENERAL PROJECT INFORMATION ................................................................................ 2
3. SMALL BUSINESS REQUIREMENTS ............................................................................... 3
4. SOLICITATION SCHEDULE ................................................................................................ 3
5. SUBMITTAL REQUIREMENTS - STATEMENT OF QUALIFICATIONS ....................... 3
6. SUBMITTAL REQUIREMENTS - SEALED FIXED FEE PROPOSAL ............................. 6
7. SELECTION PROCESS AND CRITERIA............................................................................ 6
8. OBJECTIVITY ....................................................................................................................... 7
9. GENERAL INFORMATION ................................................................................................. 7
10. QUESTIONS AND INQUIRIES ........................................................................................ 8
Attachments:
Attachment 1 - Respondent Profile Questionnaire
Attachment 2 - Client Reference Form
Attachment 3 - Fixed Fee Proposal Form
Attachment 4 - Form of Design-Build Bridging Agreement between Owner and Design-Builder
Exhibit A - Form of GMP Amendment
Exhibit B - General Conditions, AIA Document A201-2017 (as modified)
Exhibit C - Special Conditions
Exhibit D - Insurance and Bonds
Exhibit E - Design Fee and Construction Fee
Exhibit F - Small Business Program Requirements
Attachment 5 - 35% Design Criteria Submission
Attachment 5.1 - 35% Design Criteria Outline Specifications
Attachment 5.2 - 35% Design Criteria Drawings
Terminal 1 Lobby Expansion & Restroom Addition RFP - Page 1 of 9
1. NOTIFICATION TO POTENTIAL RESPONDENTS
The Raleigh-Durham Airport Authority (the "Authority") invites responses to this Request for
Proposals ("RFP") from firms or multiple firms comprising a team ("Respondents") whose
combination of experience and personnel demonstrate the competence and qualifications to
provide timely and effective Design-Build Bridging services to the Authority in connection with
the following Project at the Raleigh-Durham International Airport ("RDU"):
Terminal 1 Ticketing Expansion and Restroom Addition, RDU Project No. 321030
In accordance with N.C. Gen. Stat. 143-128.1B(c), the Authority has retained Andre Johnson
Architect, PLLC as its design criteria design professional (the "Design Criteria Professional") for
the Project, and the Design Criteria Professional has prepared a design criteria package equal to
35% of the completed design documentation for the Project (the "Design Criteria Package"). The
Design Criteria Package and Drawings are included as Attachments 5, 5.1 and 5.2 to this RFP.
The Authority anticipates selecting one Respondent to provide Design-Build Bridging Services for
the Project, which services will include both completion of the Project design and construction of
the Project. The Authority will review and evaluate the responses received in accordance with the
procedure set forth in N.C. Gen. Stat. 143-128.1B, which includes the following general steps
(subject to adjustment if fewer than three responses are received):
1. The Authority will evaluate the qualifications of the Respondents based on the selection
criteria set forth herein, and will rank the Respondents who have provided responses,
grouping the top three without ordinal ranking.
2. From the grouping of the top three Respondents, the Authority will select the Respondent
who is the lowest responsive, responsible bidder based on the cumulative amount of fees
provided in accordance with N.C. Gen. Stat. 142-128.1B(d)(10) and taking into
consideration quality, performance, and the time specified in the proposals for the
performance of the contract.
Responses must be transmitted in accordance with this RFP in order to be received by the
Authority no later than 2:00 pm on April 14, 2026. Responses received after this time will
not be considered.
The Authority awards contracts without regard to race, religion, color, national origin, sex
(including pregnancy), sexual orientation, gender identity, age, disability, veteran status, genetic
information, or any other legally protected class characteristics. The Authority's contracts are
subject to the requirements of state and federal law and this contract will be awarded in accord
therewith.
A non-mandatory Pre-Submittal Conference and Small Business Workshop will be held at
2:00 PM on March 9, 2026, in Conference Room 100 at the Authority Offices, RDU Center,
Raleigh-Durham International Airport located at 1000 Trade Drive, Morrisville, NC 27560. The
purpose of the Pre-Submittal Conference is to provide information regarding the Project and the
scope of Design-Build Bridging sought, to provide an opportunity for oral inquiries, and to provide
an overview of the selection process. Immediately following, a site visit to Terminal 1 will also
Terminal 1 Lobby Expansion & Restroom Addition RFP - Page 1 of 9
be provided, however, the number of participants from each firm may be restricted due to
TSA security requirements.
The form of the Design-Build Bridging Agreement between Owner and Design-Builder that will
constitute the contractual relationship between the Authority and the selected Respondent is
included herewith as Attachment 4 (the "Form Agreement"). The Form Agreement is the
Authority's standard form, and the final contract documents will be substantially similar thereto.
The Authority will not entertain any material changes to the Form Agreement (including exhibits
and attachments), but reserves the right to modify, amend, or supplement the Form Agreement
prior to execution as needed to carry out the Authority's intent for the Project.
2. GENERAL PROJECT INFORMATION
Project Site: The Project is located within Terminal 1 at the Raleigh-Durham International Airport.
Project Scope: On the ground/entry floor of Terminal 1, the Authority wishes to expand the
existing Ticketing Lobby area to maximize ticketing service, within reasonable feasibility and
within the allowable space. The area of work includes approximately 1,000 SF of additional
queuing space, and approximately 600 SF for ticketing. An existing walk-in cooler will be
removed, and a new walk-in cooler will be installed in a new location. The scope of work related
to the walk-in cooler will first be confirmed with the expectations of the Concessions
stakeholder(s). Additionally, the existing loading dock will be modified and relocated, as its
existing location will be incorporated into interior square footage. New finishes proposed for the
interior space will be consistent with others found throughout the Terminal 1 ticketing areas.
Building systems will be modified and/or extended to include the new square footage.
On the exterior, new building enclosure (exterior walls, footings, slab, and roof structure) will be
provided for the expanded interior square footage. The existing loading dock will be shifted
towards the southwest (towards the existing driveway servicing the loading dock). New exterior
walkways will tie into an existing ramp. At least one new exit door from the ticketing area will be
added; another pair of exit doors connected to an existing elevator lobby and serving as a point of
entry for deliveries will be relocated.
The Project will also involve renovating a portion of the existing Terminal 1 hold room area to be
converted into Men's and Women's Restrooms, as well as a closet for custodial staff and storage.
The female restroom will have six water closets while the male restroom will have three water
closets and three urinals; each restroom will receive three (3) sinks. At this time a pair of drinking
fountains with a bottle filler will be added. The remaining space will remain as a passenger hold
room, and consideration will be given to modification and relocation of existing furniture and
features, like ceilings and millwork. In addition, new furniture and features will be added to
complement the existing finishes with the adjacent spaces. Material finishes will be consistent with
other Terminal 1 restrooms at RDU, though all finish and fixture selections proposed for the
restrooms will be reviewed with the Authority during the design process. Existing building systems
will be modified to support the new restrooms and modified hold rooms.
Terminal 1 Lobby Expansion & Restroom Addition RFP - Page 2 of 9
| Pre-Submittal Conference/SB Workshop | March 9, 2026 at 2:00 PM |
|---|---|
| Submit Questions | March 19, 2026 by 4:00 PM |
| Response to Questions | March 30, 2026 |
| RFP Responses Due | April 14, 2026 by 2:00 PM |
| Interviews | Late June - Early July |
| Selection | July 2026 |
For additional detail concerning the Project Scope, the Authority refers Respondents to the Design
Criteria Submission Package, Specifications, and Drawings included herewith as Attachments 5,
5.1, and 5.2.
Anticipated Project Budget: The Authority's anticipated budget for all design and construction
associated with the Project, including design services performed by the Design Criteria
Professional, is approximately $5,000,000.
Project Schedule: The Authority anticipates that the Project will be substantially complete no later
than 16 months from Notice to Proceed.
3. SMALL BUSINESS REQUIREMENTS
It is the Authority's policy that the Authority should aid, counsel, and assist, insofar as is possible
and practical, small-business concerns in order to provide access to opportunities to contract with
the Authority. The Authority has determined that it is necessary to establish and maintain a Small
Business Program (the SB Program), which is aimed at preserving free competitive enterprise and
supports placement with small business enterprises of a fair proportion of the Authority's purchases
and contracts or subcontracts for the purchase of goods and services. The requirements of the
Authority's Small Business policy are set forth in the Small Business Requirements Exhibit
included as Exhibit F to the Form Agreement. The Authority has set the following goal for SB
participation in this contract:
15% Small Business (SB).
In accordance with the Authority's SB policy, the Authority will require that the selected firm or
team either meet the SB goal or demonstrate that the firm or team has made sufficient good-faith
effort to meet the SB goal.
4. SOLICITATION SCHEDULE
Dates below are tentative and subject to change:
Pre-Submittal Conference/SB Workshop March 9, 2026 at 2:00 PM
Submit Questions March 19, 2026 by 4:00 PM
Response to Questions March 30, 2026
RFP Responses Due April 14, 2026 by 2:00 PM
Interviews Late June - Early July
Selection July 2026
5. SUBMITTAL REQUIREMENTS - STATEMENT OF QUALIFICATIONS
Each Respondent desiring to respond to this RFQ shall submit to the Authority as part of its
Response a Statement of Qualifications ("SOQ") to provide the services requested in this
solicitation. Respondents should include only the following information in the SOQ:
Terminal 1 Lobby Expansion & Restroom Addition RFP - Page 3 of 9
Section 1 - Letter of Interest (limit 5 pages). Indicate the Respondent's interest in providing the
services requested herein. Identify the proposing firm and any teaming partners, and indicate the
name, address, telephone number, and email address of the designated contact for the proposing
firm. Include an explanation of the Respondent's project team selection, including a list of the
licensed contractor and design professionals whom the Respondent is proposing to use for the
Project's design and construction.
An explanation of the Respondent's project team selection, which shall consist of a list of the
licensed contractor and design professionals whom the Respondent proposes to use for the
Project's design and construction.
Section 2 - Respondent Profile Questionnaire (limit 10 pages). Provide a completed
Respondent Profile Questionnaire (see Attachment 1).
Section 3 - Project Experience. List up to five projects of similar size, scope, and complexity
performed by the Respondent in the capacity of a design-builder. For each of the projects listed,
provide at least the following information:
* Specific details on the extent of design services provided (e.g., full design or design-build
bridging).
* The Guaranteed Maximum Price given for the project, or if no GMP was given, the
estimated cost provided by the Respondent and the total cost of the project at completion.
* The number of days in the original schedule and the number of days taken for actual
completion of the project, with an explanation for any deviations from the original
schedule.
* Name and contact information for the project owner's representative, including mailing
address, telephone number, and email address.
For each identified project, Respondent shall also transmit the Client Reference Form
(Attachment 2) to the project owner's representative for completion. The project owner's
representative must complete the form and submit it directly to the Authority. Client Reference
Forms shall be sent to the Authority via email to cheri.baxter@rdu.com, on or before the
deadline established for receipt of the RFP responses.
Section 4 - Project Approach. Provide a concise description of the Respondent's perception of
and approach to the Program. The Respondent should focus on demonstrating its overall
knowledge of and experience with airport project design and construction as relatable to the
Project. Respondents may include commentary regarding the scope of services requested, the
Project schedule, modifications or enhancements the Authority may wish to consider, or any other
specific matters relevant to the Project.
This section should also include a brief overall description of how the Respondent would organize
and manage the Project, including how the services will be performed throughout the design, pre-
construction, and construction phases, as to at least the following items:
Terminal 1 Lobby Expansion & Restroom Addition RFP - Page 4 of 9
i.Completion of Design
ii.Value Engineering
iii. Constructability Issues
iv. Cost Model/Estimates
v. Program Tracking/Reporting
vi. Request for Information (RFI) and Shop Drawings
vii. Quality Control
viii. Schedule and Staffing Plan
ix. Closeout and Commissioning
Section 5 - SB Approach. Provide a written statement that demonstrates the Respondent
understands the SB Program requirements and describes the specific efforts Respondent intends to
take to meet or exceed the SB goal or demonstrate a good faith effort to do so. Also outline specific
efforts that the Respondent takes or will take to notify SB firms of opportunities for participation.
Section 6 - Key Personnel. Provide a description, in narrative form, of the makeup and structure
of the proposed team and provide a list of key personnel who will be assigned to the Project,
including the Project Manager. Include a team organizational chart indicating the placement and
reporting relationships of each of the identified individuals. For each identified individual, provide
the following information:
* What aspect of the Respondent's design or construction services the person will handle.
* The person's experience with the Respondent and with projects of similar size and scope
in construction/design, and the person's location. Attach the resumes of and references for
each identified person.
* Whether or not the person will be exclusively assigned to the Project through its
completion.
Note: the Design-Builder (i.e., the Respondent to whom the Authority awards the contract)
must obtain written approval from the Authority prior to changing key personnel identified
in the response to the RFP, after the contract has been awarded.
Section 7 - Certification and Acceptance of Terms (limit 5 pages). In this Section, each
Respondent shall include the following:
* A certification that each design professional who is a member of Respondent's design-build
team, including subconsultants, was selected based upon demonstrated competence and
qualifications in the manner provided by N.C. Gen. Stat. 143-64.31.
* A statement indicating acceptance of the terms and conditions of the Form Agreement
included herewith (including the exhibits thereto). The Authority will not entertain any
material changes to these documents, but reserves the right to modify, amend, or
supplement these documents prior to execution as needed to carry out the Authority's intent
for the Project. Additionally, the Authority invites commentary pertaining to suggested
revisions to the Special Conditions and Insurance Requirements included with the Form
Terminal 1 Lobby Expansion & Restroom Addition RFP - Page 5 of 9
Agreement, including exceptions, suggested revisions, or enhancements to the draft
documents, and the underlying reasoning for the revisions or enhancements.
6. SUBMITTAL REQUIREMENTS - SEALED FIXED FEE PROPOSAL
In accordance with N.C. Gen. Stat. 143-128.1B(d)(1), contemporaneously with the SOQ, each
Respondent shall submit in a separate, sealed envelope a Fee Proposal containing the
Respondent's proposed fixed fees, excluding the costs of subcontractor work, for designing and
constructing the Project in accordance with the requirements set forth herein, in the Design Criteria
Package, and in the Form Agreement.
Fee Proposals must be made in strict conformity with the provided "Fee Proposal Form"
(Attachment 3) and this RFP. All blank spaces on the Fee Proposal Form must be filled in (written
in ink or typed). Unit prices and total prices shall be stated in figures where required. The total
amount of the Fee Proposal shall be stated in the proper place on the form. The completed form
shall be without alterations or erasures.
7. SELECTION PROCESS AND CRITERIA
A. Identification of Top Qualified Respondents.
The Authority's staff will begin reviewing and evaluating SOQs upon receipt. During this process,
questions and/or requests for clarification, or provision of supplemental information may be
directed to respondents as necessary in accordance with the schedule referenced herein. The
objective of the staff evaluation will be to thoroughly evaluate the qualifications and capabilities
of each respondent with respect to each individual Program. The Authority staff may select a
limited number of respondents for further consideration and conduct interviews with these selected
respondents. During this portion of the process, the Authority will evaluate SOQs using the
following selection criteria and weighting:
* Depth and breadth of experience of the Respondent on other projects which are similar in
nature (25 points).
* Qualifications and experience of the proposed project manager (10 points).
* Qualifications and experience of other key personnel (10 points).
* Level of satisfaction with the Respondent firm and personnel as expressed by the project
owner's representative for each individual project (10 points).
* Perception of and approach to the project and individual elements thereof (25 points).
* Ability to achieve SB Program goals (10 points).
* Adherence to the Objectivity instructions included in this solicitation, responsiveness of
the respondent to the Submittal Requirements and the Qualifications Questionnaire, and
such other matters as may be relevant (10 points).
Terminal 1 Lobby Expansion & Restroom Addition RFP - Page 6 of 9
Following evaluation of the Respondents' qualifications, the Authority will rank the Respondents,
grouping the top three without ordinal ranking.1
B. Selection Among Top Qualified Respondents.
From the grouping of top Respondents identified through the process set forth above, the Authority
will select the Respondent who is the lowest responsive, responsible bidder based on the
cumulative amount of fees provided in accordance with N.C. Gen. Stat. 142-128.1B(d)(10) and
taking into consideration quality, performance, and the time specified in the proposals for the
performance of the contract.
8. OBJECTIVITY
It is inappropriate for firms submitting responses pursuant to this RFP, including their respective
agents, to lobby Authority Board members or staff during the entire selection process, from the
date the RFQ is issued through the date on which the Authority acts on the staff recommendation
regarding the selected firm. Accordingly, potential respondents interested in this RFQ are
instructed not to conduct activities of any nature that may be perceived as attempts to promote
themselves or influence the outcome of the selection process. Failure to comply with this
requirement may be grounds for disqualification.
9. GENERAL INFORMATION
The Authority reserves the right to proceed or not proceed with the Project or any elements
included therein.
The Authority shall not be responsible in any manner for any cost or expenses associated with the
preparation or submission of the Responses to this RFP or preparation for or participating in
interviews.
Upon receipt by the Authority, the Response submitted, including any and all attachments to the
Response, shall become the property of the Authority.
All Responses received become a matter of public record following the award of the contract or
the expiration or termination of this solicitation (whichever occurs first), subject to the provisions
of Chapter 132 of the North Carolina General Statutes.
A Respondent's business and trade secrets that are plainly marked as "Confidential" or "Trade
Secret" will be protected from disclosure as a public record to the extent permitted by N.C. Gen.
Stat. 132.1.2. The Authority shall not in any way be liable or responsible for the disclosure of
any Response or portions thereof if they are not plainly marked as "Confidential" or "Trade Secret"
1 In accordance with N.C. Gen. Stat. 143-128.1B(e), if fewer than three responses have been received from qualified
Respondents, the Authority will re-advertise. If as a result of such second solicitation fewer than three responses have
been received from qualified Respondents, the Authority may proceed to make its selection among the qualified
Respondents in accordance with the procedure set forth herein.
Terminal 1 Lobby Expansion & Restroom Addition RFP - Page 7 of 9
or if disclosure is required under the Public Records Act. Any submittal which contains language
purporting to render all or significant portions of the Response as "Confidential" or "Trade Secret"
may be regarded as non-responsive.
The Authority shall have the right to copy, reproduce, or otherwise dispose of each Response
received.
The Authority shall be free to use as its own, without payment of any kind or liability thereof, any
idea, scheme, technique, suggestion, layout, or plan received during the selection process.
The Authority shall become the legal owner of all documents prepared by the selected respondent
under the terms of any contract entered into related to this RFP; however, this ownership will not
extend to proprietary information or other data identified as "Confidential" or "Trade Secret" and
"Proprietary" at the time of submission that was in the selected respondent's lawful possession
prior to execution of any such contract.
10. QUESTIONS AND INQUIRIES
All questions concerning this RFP including but not limited to, the selection process, the Design
Criteria Package, the Form Agreement, or any other aspect of this solicitation must be emailed to
the attention of Cheri Baxter, Sr. Contracts Administrator at cheri.baxter@rdu.com. Please insert
"Question(s) - 321030 T1 Lobby Exp" as the subject for the email.
Neither the Authority nor the Design Criteria Professional are obligated to respond to questions
submitted verbally concerning interpretation of the Design Criteria Package. Questions must be
submitted in writing as directed herein.
The deadline for receipt of questions is March 19, 2026 at 4:00 PM. The Authority and the
Design Criteria Professional do not commit, and are not obligated, to respond to all questions
submitted in writing, but, in their sole discretion, may respond in the form of an addendum to
questions which they believe require clarification of the Design Criteria Package, the form of the
Design-Build Bridging Agreement between Owner and Design-Builder, or any other aspect of this
solicitation. The Authority reserves the right to revise the schedule in its sole discretion.
Direct questions and inquiries regarding Small Business matters including the process for
qualifying as a Small Business, current listings of certified firms, and other SB-related matters, to
the Authority's director of Small Business Programs, Ms. Thiane Carter, at thiane.carter@rdu.com.
End of Request for Proposals
Terminal 1 Lobby Expansion & Restroom Addition RFP - Page 8 of 9

With GovernmentContracts, you can:
Bid Title: EAST WILLIAMS LOWER Substation Structural & Electric Materials Category: Utility Construction
Town of Apex
Bid Due: 8/21/2026
D6D1.SBE.008 SBE Light Duty Maintenance Crew - Various Routes - Robeson D6D1.SBE.008 -
Division of Highways
Bid Due: 8/05/2026
July 24, 2026 | Advertisements Advertisement for Bids - Avent Ferry Technology Center
North Carolina State University
Bid Due: 8/18/2026
Follow Appalachian Ranger District Office and Work Center Janitorial Services Active Contract Opportunity
AGRICULTURE, DEPARTMENT OF
Bid Due: 8/20/2026