| Location: | Colorado |
|---|---|
| Posted: | Apr 3, 2026 |
| Due: | Apr 29, 2026 |
| Agency: | Town of Superior |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
| 100% CD | ||
|---|---|---|
| Job #: 2025.082 | ||
| MARCH 27, 2026 |
PROJECT MANUAL
Superior South Pool
Superior, Colorado
100% CD
Job #: 2025.082
MARCH 27, 2026
SECTION003100
AVAILABLEPROJECTINFORMATION
PART1 GENERAL
1.01 EXISTINGCONDITIONS
A. Certaininformationrelatingtoexistingsurfaceandsubsurfaceconditionsandstructuresisavailableto
ContractorbutwillnotbepartofContractDocuments,asfollows:
B. GeotechnicalReport: GeotechnicalInvestigation,SuperiorSouthSwimmingPoolReplacement,3300
HuronPeakAvenue,Superior,Colorado 80027;preparedbyCTL/Thompson;ProjectNo.DN52801-125,
datedFebruary4,2026.
1. AcopyisincludedimmediatelyfollowingthisSection.
2. GeneralInformation:
a. Thisreportidentifiespropertiesofbelowgradeconditionsandoffersrecommendationsforthe
designoffoundationsandotherconstructionelements,preparedprimarilyforuseofArchitectand
otherdesignteamconsultants.
b. RecommendationscontainedinthisdocumentshallnotbeconstruedasrequirementsofContract
Documents.
c. Interpretation: Reportisprovidedonlyforinformationandconvenience. OwnerandArchitect
disclaimresponsibilityforaccuracy,truelocationandextentofsubsurfaceconditionsthathave
beenevaluatedandreportedbyothers. OwnerandArchitectfurtherdisclaimresponsibilityfor
interpretationofreportdatabyContractor;includingbutnotlimitedtoprojectingsoilbearing
values,rockprofiles,soilstability,orpresence,level,andextentofundergroundwaterorother
potentiallydeleterioussubstances.
d. ApplicableRequirements: Specificandvariablerecommendationscontainedinthisdocument
aresubjecttoacceptancebyOwnerforincorporationinContractDocumentspreparedby
Architectandotherdesignteamconsultants. ComplywithrequirementsspecifiedinContract
Documentsforearthwork,pavingsystems,andotherapplicableworkscopeitems.
PART2 PRODUCTS-NOTUSED
PART3 EXECUTION-NOTUSED
ENDOFSECTION
2025.082 003100-1 3/27/2026
Superior,COSouthPool AVAILABLEPROJECTINFORMATION 100%ConstructionDocuments
This page intentionally left blank
GEOTECHNICAL INVESTIGATION
SUPERIOR SOUTH SWIMMING POOL REPLACEMENT
3300 HURON PEAK AVENUE
SUPERIOR, COLORADO 80027
Prepared For:
BARKER RINKER SEACAT ARCHITECTURE
990 South Broadway, Suite 222
Denver, Colorado 80209
Attention: Ms. Mary Schambach
Project No. DN52801-125
February 4, 2026
CTL|Thompson, Inc.
Denver, Fort Collins, Colorado Springs, Glenwood Springs, Pueblo, Summit County - Colorado
Cheyenne, Wyoming and Bozeman, Montana
TABLE OF CONTENTS
SCOPE ............................................................................................................................ 1
SUMMARY OF CONCLUSIONS ..................................................................................... 1
SITE CONDITIONS ......................................................................................................... 2
PROPOSED CONSTRUCTION ...................................................................................... 3
INVESTIGATION............................................................................................................. 4
SUBSURFACE CONDITIONS ........................................................................................ 5
Fill ......................................................................................................................... 5
Natural Clay and Bedrock ..................................................................................... 6
Groundwater ......................................................................................................... 6
Seismicity ............................................................................................................. 6
SITE DEVELOPMENT .................................................................................................... 7
Existing Fill ........................................................................................................... 7
Expansive Soils .................................................................................................... 8
Soft Soils .............................................................................................................. 8
Excavation ............................................................................................................ 9
Fill Placement ....................................................................................................... 9
FOUNDATIONS ............................................................................................................ 10
Spread Footings ................................................................................................. 11
SWIMMING POOL AND POOL DECK .......................................................................... 11
Swimming Pool ................................................................................................... 12
Pool Deck ........................................................................................................... 12
Exterior Flatwork ................................................................................................. 13
BELOW-GRADE CONSTRUCTION .............................................................................. 13
CONCRETE .................................................................................................................. 13
CORROSIVITY ............................................................................................................. 14
SURFACE DRAINAGE ................................................................................................. 16
CONSTRUCTION OBSERVATIONS ............................................................................ 16
GEOTECHNICAL RISK ................................................................................................. 17
LIMITATIONS ................................................................................................................ 17
FIG. 1 - LOCATION OF EXPLORATORY BORINGS
FIG. 2 - SWIMMING POOL PERIMETER DRAIN DETAIL
APPENDIX A - SUMMARY LOGS OF EXPLORATORY BORINGS
APPENDIX B - LABORATORY TEST RESULTS
TABLE B-1 - SUMMARY OF LABORATORY TESTING
BARKER RINKER SEACAT ARCHITECTURE
SUPERIOR SOUTH SWIMMING POOL REPLACEMENT
CTL|T PROJECT NO. DN52801-125 R1

With GovernmentContracts, you can:
...Project ID: 26-009 (DT2401) Title: Construction of Sun Mountain Boulevard Addenda: 0 Release ...
City of pueblo
Bid Due: 10/21/2026
...Project ID: 26-038 (PL2201); CDOT M086-089 (25192) Title: Construction of Wildhorse Trail... (Westside ...
City of pueblo
Bid Due: 9/30/2026
...General Civil Construction and Pipeline Maintenance Services Solicitation Document Docusign Envelope... CIVIL CONSTRUCTION ...
City of Thornton
Bid Due: 10/14/2026
...General Civil Construction and Pipeline Maintenance Services Solicitation Document Docusign Envelope... CIVIL CONSTRUCTION ...
City of Thornton
Bid Due: 10/14/2026