ADDENDUM NO. 1
Date:
Project Name:
Bid No.:
May 21, 2026
Pool Deck Renovation at Crescenta Valley High School
019-25/26
TO: PROSPECTIVE BIDDERS
This Addendum supersedes, supplements and has precedence over all portions of the
bidding documents with which it differs. Acknowledgement of this Addendum is
required in the Bid Form in the space provided. Failure to acknowledge and respond to
any addenda issued by the District may, in the District’s sole discretion, render the
Bidder to be deemed non-responsive or incomplete.
Project Duration
The Contractor shall achieve Substantial Completion of the Project within six (6)
consecutive calendar weeks from the date identified in the Notice to Proceed (NTP),
unless otherwise extended in writing by the District.
Liquidated Damages
Failure to complete the Work within the Contract Time, including any approved
extensions, shall result in the assessment of Liquidated Damages in the amount of One
Thousand Five Hundred Dollars ($1,500.00) per calendar day for each day completion
extends beyond the required completion date.
Contractor Licensing Requirements
Bidders shall meet the following minimum licensing requirements at the time of bid
submission and throughout the duration of the Project:
● Hold a valid California contractor’s license in one of the following classifications:
○ Class A – General Engineering Contractor
○ Class B – General Building Contractor
○ Class C-53 – Swimming Pool Contractor
○ Class C-8 – Concrete Contractor
● Contractors bidding under a Class A or Class B license shall engage a
subcontractor holding a valid C-53 or C-8 license for all swimming pool-related
and concrete-related scope of work.
● Contractor shall be an approved and certified ARDEX installer, or shall utilize an
authorized, approved, and certified ARDEX subcontractor for the installation.
● Bid Due Date and Time is May 27, 2026 at 1 PM.
ADDENDUM NO. 1 019-25/26
1 | Page