BIDDING REQUIREMENTS,
CONDITIONS OF THE CONTRACT
AND SPECIFICATIONS FOR
CHARTER TOWNSHIP OF WEST BLOOMFIELD
Karner Farms Dog Park
September 24, 2026
On Behalf of:
WEST BLOOMFIELD PARKS & RECREATION
COMMISSION
4640 Walnut Lake Road
West Bloomfield, Michigan 48323
Prepared by:
4494 Elizabeth Lake Road
Waterford, Michigan 48328
tel (248) 681-7800 fax (248) 681-2660
DLZ File Number
2545-7870-00
BIDDING & CONTRACT DOCUMENTS
WEST BLOOMFIELD PARKS & RECREATION
KARNER FARMS DOG PARK
DLZ#: 2545-7870-00
TABLE OF CONTENTS
PROCUREMENT Section No.
Advertisement for Bids ....................................................................................................................... C-111
Instructions to Bidders ......................................................................................................................... C-200
Bid Form for Construction Contract ................................................................................................... C-410
Bid Bond (Damages Form) ................................................................................................................. C-435
CONTRACT DOCUMENTS
Notice of Award .................................................................................................................................. C-510
Agreement ........................................................................................................................................... C-520
Notice to Proceed ................................................................................................................................ C-550
Performance Bond ............................................................................................................................... C-610
Warranty Bond .................................................................................................................................... C-612
Payment Bond ..................................................................................................................................... C-615
Application for Payment ...................................................................................................................... C-620
Certificate of Substantial Completion ................................................................................................. C-625
Notice of Acceptability of Work ......................................................................................................... C-626
General Conditions .............................................................................................................................. C-700
Supplementary Conditions .................................................................................................................. C-800
Work Change Directive No. ................................................................................................................ C-940
Change Order No. ................................................................................................................................ C-941
Field Order No. .................................................................................................................................... C-942
Attachment A - Insurance Requirements ............................................................................................
Attachment B - Non Iran-Linked Business .........................................................................................
Submittal Requirements ......................................................................................................................
GENERAL REQUIREMENTS
Index .................................................................................................................................................... 01-00-01
General Requirements ........................................................................................................................ 01-10-00
Price and Payment Procedures ............................................................................................................ 01-20-00
Administrative Requirements .............................................................................................................. 01-30-00
Quality Requirements .......................................................................................................................... 01-40-00
Temporary Facilities and Controls ...................................................................................................... 01-50-00
Execution and Closeout requirements ................................................................................................. 01-70-00
TECHNICAL SPECIFICATIONS
MDOT ................................................................................................................................................. 00-00-99
Bumper Block ......................................................................................................................................
Gate Removal ......................................................................................................................................
Restoration ........................................................................................................................................... 20TM816-A385-04
APPENDICES
Community Development Block Grants (CDBG) Requirements ....................................................... Appendix A
Build America Buy American Requirements ...................................................................................... Appendix B
DLZ#: 2545-7870-00
9-2-2026
Index - 1
ADVERTISEMENT FOR BIDS
CHARTER TOWNSHIP OF WEST BLOOMFIELD
ON BEHALF OF
WEST BLOOMFIELD PARKS & RECREATION
KARNER FARMS DOG PARK
General Notice
Charter Township of West Bloomfield (Owner) is requesting Bids for the construction of the following
Project:
KARNER FARMS DOG PARK
Bids for the construction of the Project will be received at the WBT Clerks Office located at WBT Town
Hall, 4550 Walnut Lake Road, West Bloomfield, MI 48323 until Wednesday, October 22, 2026 at 2:00pm
local time. At that time the Bids received will be publicly opened and read. One (1) original and two (2)
copies of a proposal must be submitted.
All proposals must be submitted in a sealed envelope or package, and must include the following
information on the exterior of the package:
* Bidder's Business Name and Address
* Bid Number and Proposal Name
* Send proposals to:
Debbie Binder
West Bloomfield Township Clerk
4550 Walnut Lake Rd.
West Bloomfield, MI 48323
It is the responsibility of the Bidder to ensure that the proposal arrives on time and at the right place.
Any proposals received after the date and time will be disqualified.
All submitted proposals and information included therein or attached thereto shall become a public
record upon delivery to the Owner.
The Project includes the following Work:
The removal of the existing gravel parking lot at Karner Farms Dog Park in the Charter Township of West
Bloomfield. The proposed work at Karner Park will include removal and replacement of existing
walkways, installation of pathway, fencing and pavement markings.
ATTENTION
This is a Federally Funded project. The Contractor and Subcontractors on this project must
comply with HUD contract provisions 24 CFR part 85.36(i), the Davis-Bacon Act.
Nondiscrimination, Equal Employment Opportunity, Affirmative Action, Section 3 requirements,
Anti-Kickback Act, Federal Occupational Safety and Health Act and Department of Labor
Standards and Regulations as set forth in the Contract Bid Documents. Bids will be awarded to
the lowest responsible bidder. This municipality is an equal opportunity employer, businesses
owned by women or minorities are strongly encouraged to bid.
Bids are requested for the following Contract: Karner Farms Dog Park
EJCDC(R) C-111, Advertisement for Bids for Construction Contract.
Copyright(C) 2018 National Society of Professional Engineers, American Council of Engineering Companies,
and American Society of Civil Engineers. All rights reserved.
Page 1 of 3
Obtaining the Bidding Documents
Information and Bidding Documents for the Project can be found at the following designated website:
https://www.bidnetdirect.com/
Bidding Documents may be downloaded from the designated website. Prospective Bidders are urged to
register with the designated website as a plan holder, even if Bidding Documents are obtained from a
plan room or source other than the designated website in either electronic or paper format. The
designated website will be updated periodically with addenda, lists of registered plan holders, reports,
and other information relevant to submitting a Bid for the Project. All official notifications, addenda, and
other Bidding Documents will be offered only through the designated website. Neither Owner nor
Engineer will be responsible for Bidding Documents, including addenda, if any, obtained from sources
other than the designated website.
Printed copies of the Bidding Documents may be obtained from the Issuing Office by paying a deposit of
$100 for each set. Bidders who return full sets of the Bidding Documents in good condition within 10
days after receipt of Bids will receive a full refund. Non-Bidders, and Bidders who obtain more than one
set of the Bidding Documents, will receive a refund of $50 for documents returned in good condition
within the time limit indicated above. Make deposit checks for Bidding Documents payable to DLZ,
Michigan.
Pre-bid Correspondence
A pre-bid conference for the Project will be held on Wednesday, October 8, 2026 at 2:00 pm at WBT
Town Hall, 4550 Walnut Lake Road, West Bloomfield, MI 48323. Attendance at the pre-bid conference is
encouraged but not required.
Instructions to Bidders.
Any request(s) for clarification of this RFP shall be made in writing. For general submittal questions contact
Brian Bachler, PE at bbachler@dlz.com and Catherine Ellerson at cellerson@wbtownship.org. In the event
it becomes necessary to revise any part of the RFP, an Addendum will be posted on the BidNet website.
The Owner is not liable for any costs incurred by Bidders with regard to this RFP.
Municipalities are exempt from Michigan State Sales and Federal Excise taxes. Do not include such taxes
in the proposal figure. The Owner will furnish the successful Bidder with tax exemption certificates when
requested.
All Bidders will comply with all federal, State, and local laws, ordinances, rules, and regulations. Ignorance
on the part of the Bidder shall not in any way relieve the Bidder from responsibility for compliance with
said laws and regulations, or any of the provision of these documents.
For all further requirements regarding bid submittal, qualifications, procedures, and contract award,
refer to the Instructions to Bidders that are included in the Bidding Documents.
EJCDC(R) C-111, Advertisement for Bids for Construction Contract.
Copyright(C) 2018 National Society of Professional Engineers, American Council of Engineering Companies,
and American Society of Civil Engineers. All rights reserved.
Page 2 of 3
This Advertisement is issued by:
Owner: Charter Township of West Bloomfield
By: Amy Neary
Title: Director of Planning and Development Services
Date: September 24, 2026
EJCDC(R) C-111, Advertisement for Bids for Construction Contract.
Copyright(C) 2018 National Society of Professional Engineers, American Council of Engineering Companies,
and American Society of Civil Engineers. All rights reserved.
Page 3 of 3
INSTRUCTIONS TO BIDDERS FOR CONSTRUCTION CONTRACT
TABLE OF CONTENTS
Page
Article 1- Defined Terms ............................................................................................................................. 1
Article 2- Bidding Documents ..................................................................................................................... 1
Article 3- Qualifications of Bidders ............................................................................................................. 2
Article 4- Pre-Bid Conference ..................................................................................................................... 3
Article 5- Site and Other Areas; Existing Site Conditions; Examination of Site; Owner's Safety Program;
Other Work at the Site .................................................................................................................................. 3
Article 6- Bidder's Representations and Certifications............................................................................... 5
Article 7- Interpretations and Addenda ..................................................................................................... 5
Article 8- Bid Security ................................................................................................................................. 6
Article 9- Contract Times ............................................................................................................................ 6
Article 10- Substitute and "Or Equal" Items ............................................................................................... 6
Article 11- Subcontractors, Suppliers, and Others ..................................................................................... 7
Article 12- Preparation of Bid ..................................................................................................................... 7
Article 13- Basis of Bid ................................................................................................................................ 8
Article 14- Submittal of Bid ......................................................................................................................... 9
Article 15- Modification and Withdrawal of Bid ......................................................................................... 9
Article 16- Opening of Bids ......................................................................................................................... 9
Article 17- Bids to Remain Subject to Acceptance ................................................................................... 10
Article 18- Evaluation of Bids and Award of Contract .............................................................................. 10
Article 19- Bonds and Insurance ............................................................................................................... 11
Article 20- Signing of Agreement .............................................................................................................. 11
Article 21- Sales and Use Taxes ................................................................................................................ 11
Article 22- Contracts to Be Assigned ........................................................................................................ 12
EJCDC(R) C-200, Instructions to Bidders for Construction Contract.
Copyright(C) 2018 National Society of Professional Engineers, American Council of Engineering Companies,
and American Society of Civil Engineers. All rights reserved.
TOC Page1 of 1
ARTICLE 1-DEFINED TERMS
1.01 Terms used in these Instructions to Bidders have the meanings indicated in the General Conditions
and Supplementary Conditions. Additional terms used in these Instructions to Bidders have the
meanings indicated below:
A. Issuing Office-The office from which the Bidding Documents are to be issued, and which
registers plan holders.
ARTICLE 2-BIDDING DOCUMENTS
2.01 Bidder shall obtain a complete set of Bidding Requirements and proposed Contract Documents
(together, the Bidding Documents). See the Agreement for a list of the Contract Documents. It is
Bidder's responsibility to determine that it is using a complete set of documents in the preparation
of a Bid. Bidder assumes sole responsibility for errors or misinterpretations resulting from the use
of incomplete documents, by Bidder itself or by its prospective Subcontractors and Suppliers.
2.02 Bidding Documents are made available for the sole purpose of obtaining Bids for completion of
the Project and permission to download or distribution of the Bidding Documents does not confer
a license or grant permission or authorization for any other use. Authorization to download
documents, or other distribution, includes the right for plan holders to print documents solely for
their use, and the use of their prospective Subcontractors and Suppliers, provided the plan holder
pays all costs associated with printing or reproduction. Printed documents may not be re-sold
under any circumstances.
2.03 Owner has established a Bidding Documents Website as indicated in the Advertisement or
invitation to bid. Owner recommends that Bidder register as a plan holder with the Issuing Office
at such website, and obtain a complete set of the Bidding Documents from such website. Bidders
may rely that sets of Bidding Documents obtained from the Bidding Documents Website are
complete, unless an omission is blatant. Registered plan holders will receive Addenda issued by
Owner.
2.04 Electronic Documents
A. When the Bidding Requirements indicate that electronic (digital) copies of the Bidding
Documents are available, such documents will be made available to the Bidders as Electronic
Documents in the manner specified.
1. Bidding Documents will be provided in Adobe PDF (Portable Document Format) (.pdf).
It is the intent of the Engineer and Owner that such Electronic Documents are to be
exactly representative of the paper copies of the documents. However, because the
Owner and Engineer cannot totally control the transmission and receipt of Electronic
Documents nor the Contractor's means of reproduction of such documents, the Owner
and Engineer cannot and do not guarantee that Electronic Documents and
reproductions prepared from those versions are identical in every manner to the paper
copies.
B. Unless otherwise stated in the Bidding Documents, the Bidder may use and rely upon
complete sets of Electronic Documents of the Bidding Documents, described in
Paragraph 2.06.A above. However, Bidder assumes all risks associated with differences
arising from transmission/receipt of Electronic Documents versions of Bidding Documents
EJCDC(R) C-200, Instructions to Bidders for Construction Contract.
Copyright(C) 2018 National Society of Professional Engineers, American Council of Engineering Companies,
and American Society of Civil Engineers. All rights reserved.
Page 1 of 12
and reproductions prepared from those versions and, further, assumes all risks, costs, and
responsibility associated with use of the Electronic Documents versions to derive information
that is not explicitly contained in printed paper versions of the documents, and for Bidder's
reliance upon such derived information.
C. After the Contract is awarded, the Owner will provide or direct the Engineer to provide for
the use of the Contractor documents that were developed by Engineer as part of the Project
design process, as Electronic Documents in native file formats.
1. Electronic Documents that are available in native file format include:
a. Karner Farms Dog Park Drawings Set
b. Complete set of Bidding Specifications
2. Release of such documents will be solely for the convenience of the Contractor. No such
document is a Contract Document.
3. Unless the Contract Documents explicitly identify that such information will be available
to the Successful Bidder (Contractor), nothing herein will create an obligation on the
part of the Owner or Engineer to provide or create such information, and the Contractor
is not entitled to rely on the availability of such information in the preparation of its Bid
or pricing of the Work. In all cases, the Contractor shall take appropriate measures to
verify that any electronic/digital information provided in Electronic Documents is
appropriate and adequate for the Contractor's specific purposes.
4. In no case will the Contractor be entitled to additional compensation or time for
completion due to any differences between the actual Contract Documents and any
related document in native file format.
ARTICLE 3-QUALIFICATIONS OF BIDDERS
3.01 To demonstrate Bidder's qualifications to perform the Work, after submitting its Bid and within
10 days of Owner's request, Bidder must submit the following information:
A. Written evidence establishing its qualifications such as financial data, previous experience,
and present commitments.
B. A written statement that Bidder is authorized to do business in the state where the Project
is located, or a written certification that Bidder will obtain such authority prior to the
Effective Date of the Contract.
C. Bidder's state or other contractor license number, if applicable.
D. Subcontractor and Supplier qualification information.
E. Other required information regarding qualifications.
EJCDC(R) C-200, Instructions to Bidders for Construction Contract.
Copyright(C) 2018 National Society of Professional Engineers, American Council of Engineering Companies,
and American Society of Civil Engineers. All rights reserved.
Page 2 of 12
3.02 A Bidder's failure to submit required qualification information within the times indicated may
disqualify Bidder from receiving an award of the Contract.
3.03 No requirement in this Article 3 to submit information will prejudice the right of Owner to seek
additional pertinent information regarding Bidder's qualifications.
ARTICLE 4-PRE-BID CONFERENCE
4.01 A pre-bid conference will be held at the time and location indicated in the Advertisement for Bids.
Representatives of Owner and Engineer will be present to discuss the Project. Bidders are
encouraged to attend and participate in the conference.
4.02 Information presented at the pre-Bid conference does not alter the Contract Documents. Owner
will issue Addenda to make any changes to the Contract Documents that result from discussions
at the pre-Bid conference. Information presented, and statements made at the pre-bid
conference will not be binding or legally effective unless incorporated in an Addendum.
ARTICLE 5-SITE AND OTHER AREAS; EXISTING SITE CONDITIONS; EXAMINATION OF SITE; OWNER'S
SAFETY PROGRAM; OTHER WORK AT THE SITE
5.01 Site and Other Areas
A. The Site is identified in the Bidding Documents. By definition, the Site includes rights-of-way,
easements, and other lands furnished by Owner for the use of the Contractor. Any additional
lands required for temporary construction facilities, construction equipment, or storage of
materials and equipment, and any access needed for such additional lands, are to be
obtained and paid for by Contractor.
5.02 Existing Site Conditions
A. Subsurface and Physical Conditions; Hazardous Environmental Conditions
1. The Supplementary Conditions identify the following regarding existing conditions at or
adjacent to the Site:
a. Those reports of explorations and tests of subsurface conditions at or adjacent to
the Site that contain Technical Data.
b. Those drawings known to Owner of existing physical conditions at or adjacent to
the Site, including those drawings depicting existing surface or subsurface
structures at or adjacent to the Site (except Underground Facilities), that contain
Technical Data.
c. Reports and drawings known to Owner relating to Hazardous Environmental
Conditions that have been identified at or adjacent to the Site.
d. Technical Data contained in such reports and drawings.
2. Owner will make copies of reports and drawings referenced above available to any
Bidder on request. These reports and drawings are not part of the Contract Documents,
but the Technical Data contained therein upon whose accuracy Bidder is entitled to rely,
as provided in the General Conditions, has been identified and established in the
Supplementary Conditions. Bidder is responsible for any interpretation or conclusion
EJCDC(R) C-200, Instructions to Bidders for Construction Contract.
Copyright(C) 2018 National Society of Professional Engineers, American Council of Engineering Companies,
and American Society of Civil Engineers. All rights reserved.
Page 3 of 12
Bidder draws from any Technical Data or any other data, interpretations, opinions, or
information contained in such reports or shown or indicated in such drawings.
3. If the Supplementary Conditions do not identify Technical Data, the default definition of
Technical Data set forth in Article 1 of the General Conditions will apply.
B. Underground Facilities: Underground Facilities are shown or indicated on the Drawings,
pursuant to Paragraph 5.05 of the General Conditions, and not in the drawings referred to in
Paragraph 5.02.A of these Instructions to Bidders. Information and data regarding the
presence or location of Underground Facilities are not intended to be categorized, identified,
or defined as Technical Data.
5.03 Other Site-related Documents
A. No other site-related documents are available.
5.04 Site Visit and Testing by Bidders
A. Bidder is encouraged to visit the Site and conduct a thorough visual examination of the Site
and adjacent areas. During the visit the Bidder must not disturb any ongoing operations at
the Site.
B. A Site visit is the responsibility of the Bidder. The site is located within the ROW on public
property and can be accessed at any time. Bidder is to not disturb or affect local traffic in the
area. Maps to the Site will be made available upon request.
C. Bidders visiting the Site are required to arrange their own transportation to the Site.
D. Bidder is not required to conduct any subsurface testing, or exhaustive investigations of Site
conditions.
E. On request, and to the extent Owner has control over the Site, and schedule permitting, the
Owner may provide Bidder general access to the Site to conduct such additional
examinations, investigations, explorations, tests, and studies as Bidder deems necessary for
preparing and submitting a successful Bid based upon the discretion of the Township
Environmental Department and a Township wetland permit approval. Owner will not have
any obligation to grant such access if doing so is not practical because of existing operations,
security or safety concerns, or restraints on Owner's authority regarding the Site. Bidder is
responsible for establishing access needed to reach specific selected test sites.
F. Bidder must comply with all applicable Laws and Regulations regarding excavation and
location of utilities, obtain all permits, and comply with all terms and conditions established
by Owner or by property owners or other entities controlling the Site with respect to
schedule, access, existing operations, security, liability insurance, and applicable safety
programs.
G. Bidder must fill all holes and clean up and restore the Site to its former condition upon
completion of such explorations, investigations, tests, and studies.
5.05 Owner's Safety Program
A. Site visits and work at the Site may be governed by an Owner safety program. If an Owner
safety program exists, it will be noted in the Supplementary Conditions.
EJCDC(R) C-200, Instructions to Bidders for Construction Contract.
Copyright(C) 2018 National Society of Professional Engineers, American Council of Engineering Companies,
and American Society of Civil Engineers. All rights reserved.
Page 4 of 12

With GovernmentContracts, you can:
Project: Rehabilitation of Ash Handling System Ref. #: REQ - 0011633 Type: RFP
Great Lakes Water Authority
Bid Due: 11/24/2026
Project: POINT OF SALE SYSTEM Ref. #: WM2624 Department: HWC Type: RFP Status:
City Colleges of Chicago
Bid Due: 11/19/2026
NOTICE OF REQUEST FOR BIDS Bid Number 2026-11-19-SXS Marquette County Sheriff's Office DUE
Marquette County
Bid Due: 11/19/2026
BID # BID DOCUMENTS OPEN BID DATE & TIME BID DESCRIPTION Buyer 8918
Washtenaw County
Bid Due: 11/24/2026