CHARTER TOWNSHIP OF VAN BUREN
BID INSTRUCTIONS FOR
IRON BELLE TRAIL SECTION I
Sealed proposals will be received by the Van Buren Township at the office of the
Township Clerk, 46425 Tyler Road, Van Buren, Michigan 48111 until 2:00 p.m. local
time (EST), on May 19, 2026 for construction of this project. Proposals are to be
delivered to the Township Clerk’s Office in a sealed envelope marked on the
outside as described in the RFP.
Project Description:
The project consists of constructing a variable width concrete sidewalk and is
located along the south side of East Huron River Drive. The project begins at the
east end of Riggs Park along Huron River Drive and connects to the existing
pathway on the south side of Huron River Drive. The project includes the
development of approximately 2,000 square feet of 5’ wide concrete sidewalk
and 22,200 square feet of 7’ wide concrete sidewalk. The project is split into two
phases – Phase 1 and Phase 2. For the purpose of these bid documents, only
Phase 1 estimated quantities are included.
The drawings and specifications under which the work is to be performed are on
file and may be examined at the following locations:
Van Buren Township
46425 Tyler Road
Van Buren Twp., MI 48111
PEA Group
or
7927 Nemco Way, Suite 115
Brighton, MI 48116
Each proposal shall be accompanied by a certified check or acceptable bid
bond for a sum not less than five percent (5%) of the proposal amount. All
questions regarding clarification or interpretation of the documents shall be
directed to Jeffrey Smith, PLA, LEED AP, of PEA Group by the following means:
Office: (517) 546-8583, Fax: (248) 689-1044, and e-mail: jsmith@peagroup.com.
The right is reserved by Van Buren Township to accept any proposal, to reject
any proposal, and to waive irregularities in proposals. No bid may be withdrawn
after the above date and time for receiving bids for a period of one-hundred-
twenty (120) days.
Published: 4-30-26
Specifications & Contract
Documents
Iron Belle Trail Section I
Van Buren Township
Elizabeth Renaud
46425 Tyler Road
Van Buren Twp., MI 48111
P: 734-699-8900
PEA Group
Project No. 2024-1898
Jeff Smith, PLA, LEED AP
7927 Nemco Way, Suite 115
Brighton, MI 48116
P: 517-546-8583
INDEX
INVITATION FOR BIDS
INSTRUCTIONS TO BIDDERS (IB-1 - IB-7)
1. Scope of Work
2. Receipt of Opening of Bid Proposal
3. Project Timeline
4. Construction Conditions
5. Qualifications of Bidders
6. Name, Address & Legal Status of Bidder
7. Bid Deposit
8. Form of Proposal
9. Basis of Proposal
10. Explanation to Bidders by Addendum
11. Award and Execution of Contract
12. Guaranty Bonds
13. Insurance
14. Right to Accept, Reject, Waive Defects
15. Withdrawal of Bids
16. Taxes
17. Drawings & Contract Documents
18. Construction Permits, Road Permits, Miscellaneous Permits
NOTICE TO BIDDERS
BID FORM
BID FORM SUPPLEMENTAL
THE CONTRACT (C-1 - C-7)
Article I - The Work
Article II - The Time
Article III - Liquidated Damages
Article IV - Owner's Right to Complete
Article V - Assignment of Contract
Article VI - The Contract Base Bid
Article VII - Anticipated Conditions and Work By Others
Article VIII - Miscellaneous
Article IX - Bonds
Article X - Independent Contractor Relationship
Article XI – Liability and Insurance
Article XII – General Provisions
Article XIII – Instructions for Executing Agreement
Van Buren Township
Iron Belle Trail Section I
Project No. 2024-1898
PAGE NO.
INV-1
IB-1
IB-1-2
IB-2
IB-3
IB-3
IB-3
IB-4
IB-4
IB-4
IB-5
IB-5
IB-5-6
IB-6
IB-6
IB-6
IB-6
IB-7
IB-7
NB-1
BF-1-6
BFS- 1-4
C-1
C-1
C-2
C-2
C-3
C-3-4
C-4
C-4
C-4
C-4-5
C-5
C-5-6
C-7
Index
IND -1
April 2026
PERFORMANCE BOND
LABOR, MATERIAL & EQUIPMENT RENTAL BOND
MAINTENANCE & GUARANTY BOND
GENERAL CONDITIONS (GC-1 – GC-19)
1. Definition of Terms
2. Contract Documents
3. Contract Drawings and Specifications
4. Engineer’s Status During Construction
5. Limitations on Engineer’s Responsibilities
6. Contractor’s Responsibility
7. Permits and Regulations
8. Subcontracts
9. Information by the Contractor
10. General Requirements for Materials and Workmanship
11. Testing and Samples
12. Lines and Grades
13. Protection of Work and Property
14. Responsibility for Adjoining Structures and Trees
15. Maintenance of Service
16. Storage of Materials
17. Relation to Other Contractors
18. Contractor’s Supervision and Organization
19. Facilities for Inspection
20. Shop Drawings
21. Errors, Corrections and Changes in Drawings and Specifications
22. Changes in the Work
23. Basis for Determining Cost of Changes in the Work
24. Patents
25. “Or Equal Clause”
26. Cleaning Up
27. Use of Completed Portions of the Work
28. Payments Withheld
29. Contractor’s Right to Stop Work
30. Fair Employment Practices Act
31. Authority
32. Starting Work
33. Sanitary Regulations
34. Sunday, Holiday and Night Work
35. Progress of Work
36. Time of Completion
37. Delays and Extension of Time
38. Liquidated Damages
39. Time is Essence of Contract
Van Buren Township
Iron Belle Trail Section I
Project No. 2024-1898
PB-1
LMB-1-2
MGB-1-2
GC-1
GC-1
GC-1-2
GC-2
GC-2-3
GC-3
GC-3-4
GC-4
GC-4
GC-4-5
GC-5
GC-5
GC-6
GC-6
GC-6-7
GC-7
GC-7
GC-8
GC-8
GC-9
GC-9
GC-9-10
GC-10-11
GC-11
GC-11
GC-12
GC-12
GC-12
GC-13
GC-13
GC-13
GC-13
GC-13
GC-13
GC-13-14
GC-14
GC-14
GC-15
GC-15
Index
IND -2
April 2026
GENERAL CONDITIONS (Continued)
40. Estimated Quantities
41. Forfeiture of Contract
42. No Waiver of Contract
43. Payment Not to Be Stopped
44. Guarantee
45. Estimates and Payments
46. Waivers of Liens
47. Insurance
CONTRACTOR’S DECLARATION
CONTRACTOR’S AFFIDAVIT
SPECIAL PROVISIONS
AUDIO VIDEO FILE SPECIAL
CONTRACTOR STAKING
UTILITY COORDINATION
TEMPORARY TRAFFIC CONTROL FOR CONSTUCTION ZONE
OPERATION
CLEARING
CULVERT CLEANOUT
DITCH CLEANOUT
SUBGRADE UNDERCUTTING, SPECIAL
MAINTENANCE GRAVEL, SPECIAL
SIGNS, PERMANENT, COMPLETE
HYDRANT ADJUST
WATER STRUCTURE COVER ADJUST
SUPPLEMENTAL SPECIFICATIONS
BOUDLER RETAINING WALLS
SUPPLEMENTAL SPECIFICATIONS FOR WAYNE COUNTY PERMITS
Van Buren Township
Iron Belle Trail Section I
Project No. 2024-1898
GC-15
GC-15
GC-16
GC-16
GC-16
GC-16-17
GC-17-18
GC-18-19
CD-1
CA-1
SP-1
AV-1
CS-1
UC-1
TCZ-1
C-1
CC-1
DC-1
SU-1
MG-1
SP-1
HA-1
WSC-1
SS-1
BRW-1-3
WCP-1
Index
IND -3
April 2026
This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.