| Location: | Utah |
|---|---|
| Posted: | Sep 15, 2025 |
| Due: | Sep 30, 2025 |
| Agency: | State Government of Utah |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 2025-002 |
| Publication URL: | To access bid details, please log in. |
Project Description: The principal items of work are approximately as follows: Remove the existing pressurized irrigation line in Canyon Crest road and replace-in-place with approximately 1,770 feet of 24” DR-18 C-900 PVC pressurized irrigation water pipe, including residential irrigation connections and appurtenant items.

With GovernmentContracts, you can:
...includes the replacement of 4" asbestos cement pipe (abandoned in place) with 4" ...
AGRICULTURE, DEPARTMENT OF
Bid Due: 11/21/2027
...drain pipes, saw-cut and removal of asphalt, installation of storm drain catch basin, ...
State Government of Utah
Bid Due: 11/19/2026
...of Performance: UT 84078 USA Description This project includes the replacement of 4" ...
AGRICULTURE, DEPARTMENT OF
Bid Due: 11/21/2026
...of Performance: UT 84078 USA Description This project includes the replacement of 4" ...
AGRICULTURE, DEPARTMENT OF
Bid Due: 12/01/2026