| Location: | California |
|---|---|
| Posted: | Sep 15, 2025 |
| Due: | Oct 27, 2025 |
| Agency: | County of San Mateo |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
Project ID:
Title: NOTICE INVITING STATEMENT OF QUALIFICATIONS FOR CONSTRUCTION
Addenda: 0
Release Date: 9/15/2025
Due Date: 10/27/2025
Sam Lin, Director
County of San Mateo Project Development Unit
500 County Center 5th Floor
Redwood City, CA 94063
Email: slin@smcgov.org
The Project includes the construction of a new single-story Fire Station, located at 350 Butano Cutoff Road, in Pescadero, California. The new 12,300 square foot facility features an Apparatus Bay, a service wing, a residential wing which includes dormitories, living spaces and offices. The building will be all-electric and utilize ERVs and operable windows for natural ventilation. The Apparatus Bay will be semi-conditioned with overhead radiant heating. Domestic water will be supplied by the newly constructed CSA-11 extension. Sanitary systems will use a local septic system with leech field. The storm water will utilize biofiltration.
The site will feature fire safe landscaping and no irrigation. The site will include a backup generator, onsite fueling station and a water storage tank for fire suppression. Existing PG&E power lines will be undergrounded at the driveways of the building and two new poles will be installed on either side of the driveway aprons.
The building construction will include a mat foundation supported by deep soil mixing (DSM). The roof will be cross laminated timber (CLT) supported by cold form metal studs. The Apparatus Bay roof will be CLT supported by prefabricated trusses. The DSM piers, fire water tank and trusses will be delegated design to be procured and managed by the General Contractor.
The existing Fire Station 59 barracks, located at 1200 Pescadero Creek Road, is to be demolished as part of this work. That site will be regraded to promote positive drainage away from the remaining Apparatus Bay, driveway and remaining outbuildings. See Exhibit A – Design Development Drawings (selected sheets).
The Project will be delivered using Design-bid-build Best Value. The selected General Contractor must be capable of staffing the Project adequately to manage the early Delegated Design ground improvements in accordance with the criteria established by the Geotechnical Engineer of Record, as well as, coordination of the required ground improvement regulatory approvals, implementation of the CEQA mitigation measures, and administration of the construction process. The successful General Contractor will be expected to work collaboratively with the Owner and Owner’s consultant(s) and Architect Perkins&Will throughout the Delegated Design ground improvements and construction process.

With GovernmentContracts, you can:
...Project: RFP 6251 - TEMPORARY STAFFING SERVICES Ref. #: RFP 6251 - TEMPORARY ...
Ventura County
Bid Due: 6/17/2026
...Solicitation Number: RRCC-RFSQ-19-003 Title: As-Needed Temporary Staffing Services Department... as-needed technical staffing as ...
Los Angeles County
Bid Due: 3/02/2027
...Project: RFP 6251 - TEMPORARY STAFFING SERVICES Ref. #: RFP 6251 - TEMPORARY ...
Ventura County
Bid Due: 6/10/2026
...Type Title Deadline Status RFP (RFP No. 25-26/29) As-Needed Temporary Staffing Services (RFP ...
Port of Oakland
Bid Due: 6/11/2026