| Location: | Colorado |
|---|---|
| Posted: | Apr 27, 2026 |
| Due: | May 1, 2026 |
| Agency: | DEPT OF DEFENSE |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | FA251726Q0024 |
| Publication URL: | To access bid details, please log in. |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
Project is to refurbish air handling unit (AHU) at Building 1171. To accomplish this several AHU components will need to
be repaired/replaced. Work schedule shall be clearly delineated in a Gantt chart schedule with the dates submitted to the
Government for review and approval. Existing Unit: Trane, s/n U3A26715. Contractor shall remove and replace all fan
bearings as well as fan shaft. There should be no vibration, and a static air pressure test shall be conducted to ensure
manufacturer's specification cubic feet per minute are being produced at supply air trunk. Contractor shall startup system to
ensure existing AHU with Variable Frequency Drive. Contractor shall test the airflow to verify flows match original design.
Contractor shall make sure that the loop remains free of air bubbles when filling the coil with water. Contractor shall test and
balance the airflow to match original design airflow to conditioned areas. Replace fan shaft with original manufacturer size
shaft and install new supports to mitigate vibration of the shaft.
AMENDMENT 1 (14 APR 26):
Amendment made to correct an admin error in the Evaluation Factors attachment.
Original: Subfactor 1.1 mentioned a "Mobile Surveillance System" by mistake.
Edit: Removed "Mobile Surveillance System" to avoid confusion on what requirement this is for.
AMENDMENT 2 (27 APR 26):
To address Request For Information, and to extend the solicitation to allow time for Offerors to address the RFI answer into their quote provided.
RFI: "I was mistaken in regard to the serial# being incorrect vs. the solicitation. The issue is that the serial# does not exist with Trane anymore so the shaft size (length) is unavailable, however Trane has confirmed it being 1 of 2 different shafts. Trane is searching for the information to try and pinpoint the correct shaft. My sub will send me both quotes in hopes they will have the information by the deadline."
Answer: "We rely on our Colorado Springs account manager, Danny Marsh at 719-482-6397 and danny.marsh@tranetechnologies.com, for parts and equipment information. He didn't receive any questions from contractors, so he/she is getting info from elsewhere. I can't tell the contractor which shaft should be provided as part of their proposal."
Solicitation Extended - New Date Offers Due set to Friday 1 May at 12 PM MST.
| Apr 8, 2026 | [Solicitation (Original)] Peterson SFB Air Handling Unit Repair |
| Apr 9, 2026 | [Solicitation (Updated)] Peterson SFB Air Handling Unit Repair |
| Apr 14, 2026 | [Solicitation (Updated)] Peterson SFB Air Handling Unit Repair |

With GovernmentContracts, you can:
...) to the backflow prevention (BFP) equipment and the raw water supply from ...
Steamboat Springs
Bid Due: 6/18/2026
...SUPPLIES NAICS Code: 339113 - Surgical Appliance and Supplies Manufacturing Place of Performance: ...
DEPT OF DEFENSE
Bid Due: 6/10/2026
...for fire supplies and equipment in the National Fire Equipment System (NFES) Catalog ...
AGRICULTURE, DEPARTMENT OF
Bid Due: 6/05/2026
...) to the backflow prevention (BFP) equipment and the raw water supply from ...
Steamboat Springs