Union Street & Furnace Brook Well Redevelopment
| Location: |
Massachusetts |
| Posted: |
Jul 25, 2025 |
| Due: |
Aug 13, 2025 |
| Agency: |
Commonwealth of Massachusetts |
| Type of Government: |
State & Local |
| Category: |
- 47 - Pipe, Tubing, Hose, Fittings
|
| Solicitation No: |
BD-24-1295-TMOM-TOM01-119290 |
| Publication URL: |
To access bid details, please log in. |
Bid Solicitation: BD-24-1295-TMOM-TOM01-119290
|
|
Header Information
|
|
Bid Number:
|
BD-24-1295-TMOM-TOM01-119290
|
Description:
|
Union Street & Furnace Brook Well Redevelopment
|
Bid Opening Date:
|
08/13/2025 02:00:00 PM
|
|
Purchaser:
|
Ken Ryan
|
Organization:
|
Town of Marshfield
|
|
Department:
|
TMOM - Town of Marshfield
|
Location:
|
TOM01 - Town of Marshfield
|
|
Fiscal Year:
|
24
|
Type Code:
|
NS - Non-Statewide Solicitation
|
Allow Electronic Quote:
|
Yes
|
|
Alternate Id:
|
2026-02
|
Required Date:
|
08/13/2025
|
Available Date
:
|
07/25/2025 12:00:00 PM
|
|
Info Contact:
|
|
Bid Type:
|
OPEN
|
Informal Bid Flag:
|
No
|
|
Purchase Method:
|
Open Market
|
|
Pre Bid Conference:
|
|
|
Bulletin Desc:
|
Redevelopment of Union Street No. 2 and Furnace Brook No. 3 Wells and Replacement of Well Pumping Units.The Union Street No. 2 Well pumping station equipment includes a 7-stage vertical turbine pump with 40 HP electric motor, discharge head, standby engine and right-angle-gear drive. The Furnace Brook No. 3 Well pumping station equipment includes a 12-stage vertical turbine pump with 40 HP electric motor, discharge head, standby engine and right-angle-gear drive.
|
|
|
Ship-to Address:
|
Jon Nash
870 Moraine Street
Marshfield, MA 02050
US
Email: jnash@townofmarshfield.org
Phone: (781) 834-5574
FAX: (781) 834-5527
|
Bill-to Address:
|
Jon Nash
870 Moraine Street
Marshfield, MA 02050
US
Email: jnash@townofmarshfield.org
Phone: (781) 834-5574
FAX: (781) 834-5527
|
Print Format:
|
Bid Print
|
File Attachments:
|
Invitation to Bid
|
Form Attachments:
|
|
|
Required Quote Attachments
|
|
|
|
Item # 1:
(
47-10
-
15
)
|
Redevelopment of Union Street No. 2 and Furnace Brook No. 3 Wells and Replacement of Well Pumping Units. The Union Street No. 2 Well pumping station equipment includes a 7-stage vertical turbine pump with 40 HP electric motor, discharge head, standby engine and right-angle-gear drive. The Furnace Brook No. 3 Well pumping station equipment includes a 12-stage vertical turbine pump with 40 HP electric motor, discharge head, standby engine and right-angle-gear drive. The work includes, but is not necessarily limited to disconnect and remove the existing pumping units, including electric motor, baseplate, right-angle gear drive, vertical turbine pump, column and shafts, redevelop the gravel-packed wells, furnish new pumps, columns, shafts and associated bearings and couplings, remove existing well level monitoring equipment and furnish new well level transducer/transmitter for each well (the transducers/transmitters will be installed by others); clean and paint the existing baseplates and discharge heads, furnish and install a new 6 inch x 6 inch ductile iron tee in the discharge piping at Furnace Brook No. 3; install the new pumps, reusing the existing baseplates and discharge heads.
|
|
U N S P S C Code:
|
47-10-15
Water treatment and supply equipment
|
|
Qty
|
Unit Cost
|
UOM
|
Total Discount Amt.
|
Total Cost
|
1.0
|
|
EA - Each
|
|
|
Manufacturer:
|
|
Brand:
|
|
Model:
|
|
Make:
|
|
Packaging:
|
|
|
|
|
|
|
|
|
|
|
|
|
Daily notification on new contract opportunities
With GovernmentContracts, you can:
- Find more opportunities and win more business
- Receive daily alerts for all new bid opportunities
- Get contract opportunities matched to your business
ONE WEEK FREE TRIAL
* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.