New 115RE Left Hand No. 7 Turnout

Location: Washington
Posted: Sep 24, 2026
Due: Oct 1, 2026
Agency: City of Tacoma
Type of Government: State & Local
Category:
  • 16 - Aircraft Components and Accessories
  • 61 - Electric Wire, and Power and Distribution Equipment
Solicitation No: TR26-0194N
Publication URL: To access bid details, please log in.
Specification Number Type Due Date Time Due - Pacific Title and Solicitation Documents Date Issued
TR26-0194N RFB 10/01/2026 11 AM New 115RE Left Hand No. 7 Turnout
Specification
Register for the Bid Holders List
Addendum 1 - 09/24/2026
09/02/2026

Attachment Preview

TACOMA RAIL
REQUEST FOR BIDS
NEW 115RE LEFT HAND NO. 7 TURNOUT
SPECIFICATION NO. TR26-0194N

By Email: sendbid@tacoma.gov Maximum email size including attachments: 35 MB. Multiple emails may be sent for each submittal. Note: Email may pass through multiple servers before arriving at its destination. Please allow sufficient time for email delivery of submittals. Timely electronic delivery is at the risk of the supplier. In Person: Tacoma Public Utilities Administration Building North, Main Floor, Lobby Security Desk 3628 South 35th Street Tacoma, WA 98409 Monday - Friday 8:00 am to 4:30 pm

City of Tacoma
Tacoma Public Utilities / Tacoma Rail
REQUEST FOR BIDS TR26-0194N
New 115RE Left Hand No. 7 Turnout
Submittal Deadline: 11:00 a.m., Pacific Time, Friday, September 25, 2026
Submittals must be received by the City's Procurement and Payables Division by 11:00 a.m. Pacific Time.
For electronic submittals, the City of Tacoma will designate the time of receipt recorded by our email server, as
the official time of receipt. This clock will be used as the official time of receipt of all parts of electronic bid
submittals. Include the specification number in the subject line of your email. Your submittal must be sent as
an attachment, links to your electronic submittal will not be accepted.
For in person submittals, the City of Tacoma will designate the time of receipt recorded by the timestamp
located at the lobby security desk, as the official time of receipt. Include the specification number on the
outside of the sealed envelope. Late submittals will be returned unopened and rejected as non-responsive.
Submittal Delivery: Sealed submittals will be received as follows:
By Email: In Person:
sendbid@tacoma.gov Tacoma Public Utilities Administration Building North,
Maximum email size including attachments: 35 MB. Main Floor, Lobby Security Desk
Multiple emails may be sent for each submittal. 3628 South 35th Street
Tacoma, WA 98409
Note: Email may pass through multiple servers before arriving Monday - Friday 8:00 am to 4:30 pm
at its destination. Please allow sufficient time for email delivery
of submittals. Timely electronic delivery is at the risk of the
supplier.
Bid Opening: Submittals must be received by the City's Procurement and Payables Division prior to 11:00
a.m. Pacific Time. Sealed submittals in response to a RFB will be opened Tuesday's at 11:15 a.m. by a
purchasing representative and read aloud during a public bid opening held at the Tacoma Public Utilities
Administrative Building North, 3628 S. 35th Street, Tacoma, WA 98409, conference room M-1, located on the
main floor. They will also be held virtually Tuesday's at 11:15 a.m. Attend a Zoom meeting via this link or call 1
(253) 215 8782, using meeting ID # 884 0268 0573, passcode # 070737.
Submittals in response to an RFP, RFQ or RFI will be recorded as received, but not read at bid opening. As
soon as possible, after 1:00 PM, on the day of submittal deadline, preliminary results will be posted to
www.TacomaPurchasing.org.
If you believe your submittal was sent timely and was not read at bid opening, please contact
sendbid@tacoma.gov immediately.
Solicitation Documents: An electronic copy of the complete solicitation documents may be viewed and
obtained by accessing the City of Tacoma Purchasing website at www.TacomaPurchasing.org.
* Register for the Bid Holders List to receive notices of addenda, questions and answers and related updates.
* Click here to see a list of vendors registered for this solicitation.
Pre-Proposal Meeting: A pre-proposal meeting will not be held.
Project Scope: New 115RE Left Hand Number 7 Turnout
Estimate: $65,000.00
Paid Sick Leave: The City of Tacoma requires all employers to provide paid sick leave in accordance with
State of Washington law.
Form No. SPEC-040C Revised: 06/03/2024

Americans with Disabilities Act (ADA Information: The City of Tacoma, in accordance with Section 504 of
the Rehabilitation Act (Section 504) and the Americans with Disabilities Act (ADA), commits to
nondiscrimination on the basis of disability, in all of its programs and activities. Specification materials can be
made available in an alternate format by emailing the contact listed below in the Additional Information section.
Title VI Information:
"The City of Tacoma" in accordance with provisions of Title VI of the Civil Rights Act of 1964, (78 Stat. 252, 42
U.S.C. sections 2000d to 2000d-4) and the Regulations, hereby notifies all bidders that it will affirmatively
ensure that in any contract entered into pursuant to this advertisement, disadvantaged business enterprises
will be afforded full and fair opportunity to submit bids in response to this invitation and will not be discriminated
against on the grounds of race, color, national origin in consideration of award.
Additional Information: Requests for information regarding the specifications may be obtained by contacting
Rebecca Lewis by email to RLewis4@tacoma.gov.
Protest Policy: City of Tacoma protest policy, located at www.tacomapurchasing.org, specifies procedures for
protests submitted prior to and after submittal deadline.
Meeting sites are accessible to persons with disabilities. Reasonable accommodations for persons with
disabilities can be arranged with 48 hours advance notice by calling 253-502-8468.
Form No. SPEC-040C Revised: 06/03/2024

TABLE OF CONTENTS
SUBMITTAL CHECK LIST ........................................................................................................... 4
MINIMUM REQUIREMENTS ........................................................................................................ 6
1. STANDARD TERMS AND CONDITIONS / GENERAL PROVISIONS ................................. 6
2. INSURANCE REQUIREMENTS ........................................................................................... 6
3. DESCRIPTION OF WORK .................................................................................................... 6
4. CALENDAR OF EVENTS ...................................................................................................... 7
5. INQUIRIES ............................................................................................................................ 7
6. PRE-BID MEETING ............................................................................................................... 7
7. DISCLAIMER ......................................................................................................................... 7
8. RESPONSIVENESS ............................................................................................................. 8
9. AWARD ................................................................................................................................. 8
10. DELIVERY ............................................................................................................................. 8
11. WARRANTY .......................................................................................................................... 9
12. INSPECTION ......................................................................................................................... 9
13. APPROVED ITEM EQUIVALENT ......................................................................................... 9
14. COMPLIANCE WITH SPECIFICATIONS .............................................................................. 9
15. MATERIALS AND WORKMANSHIP ..................................................................................... 9
16. ENVIRONMENTALLY PREFERABLE PROCUREMENT ................................................... 10
APPENDIX A .............................................................................................................................. 11
APPENDIX B .............................................................................................................................. 12
Request for Bids Specification No. TR26-0194N
Template Revised: 08/01/2025

The following items make up your complete electronic submittal package (include all the items below):
Signature Page (Appendix A) To be filled in and executed by a duly authorized officer or representative of the bidding entity. If the bidder is a subsidiary or doing business on behalf of another entity, so state, and provide the firm name under which business is hereby transacted.
Price Proposal Form (Appendix A) The unit prices bid must be shown in the space provided. Check your computations for omissions and errors.
After award, the following documents will be executed:
Purchase Order

SUBMITTAL CHECK LIST
This checklist identifies items to be included with your submittal. Any submittal received without
these required items may be deemed non-responsive and not be considered for award. Submittals
must be received by the City of Tacoma Purchasing Division by the date and time specified in the
Request for Bids page.
The following items make up your complete electronic submittal
package (include all the items below):
Signature Page (Appendix A)
To be filled in and executed by a duly authorized officer or representative of the bidding entity.
If the bidder is a subsidiary or doing business on behalf of another entity, so state, and provide
the firm name under which business is hereby transacted.
Price Proposal Form (Appendix A)
The unit prices bid must be shown in the space provided. Check your computations for
omissions and errors.
After award, the following documents will be executed:
Purchase Order
A. SUPPLEMENTAL RESPONSIBILITY CRITERIA - CITY OF TACOMA:
In order to be considered a responsible bidder, the prospective bidder shall have all of the following
qualifications set forth in Tacoma Municipal Code 1.06.262:
1. Adequate financial resources or the ability to secure such resources;
2. The necessary experience, stability, organization and technical qualifications to perform the
proposed contract;
3. The ability to comply with the required performance schedule, taking into consideration all
existing business commitments;
4. A satisfactory record of performance, integrity, judgment and skills; and
5. Be otherwise qualified and eligible to receive an award under applicable laws and
regulations.
a. Bidder Responsibility. Bidders shall not be in violation of 39.04.350 RCW Bidder
Responsibility Criteria - Supplemental Criteria.
In addition to the mandatory bidder responsibility criteria listed immediately above, the City may, in
addition to price, consider any or all of the following criteria contained in Tacoma Municipal Code
Chapter 1.06.262 in determining bidder responsibility:
1. The ability, capacity, experience, stability, technical qualifications and skill of the
respondent to perform the contract;
2. Whether the respondent can perform the contract within the time specified, without delay or
interference;
Request for Bids Specification No. TR26-0194N
Template Revised: 08/01/2025

3. Integrity, reputation, character, judgment, experience, and efficiency of the respondents,
including past compliance with the City's Ethics Code;
4. Quality of performance of previous contracts;
5. Previous and existing compliance with laws and ordinances relating to contracts or
services;
6. Sufficiency of the respondent's financial resources;
7. Quality, availability, and adaptability of the supplies, purchased services or public works to
the particular use required;
8. Ability of the respondent to provide future maintenance and service on a timely basis;
9. Payment terms and prompt pay discounts;
10.The number and scope of conditions attached to the submittal;
11.Compliance with all applicable City requirements, including but not limited to the City's
Ethics Code and its Small Business Enterprise and Local Employment and Apprenticeship
programs;
12.Other qualification criteria set forth in the specification or advertisement that the appropriate
department or division head determines to be in the best interests of the City.
The City may require bidders to furnish information, sworn or certified to be true, to demonstrate
compliance with the City responsibility criteria set forth above. If the city manager or director of
utilities is not satisfied with the sufficiency of the information provided, or if the prospective
respondent does not substantially meet all responsibility requirements, any submittal from such
respondent must be disregarded.
B. ADDITIONAL SUPPLEMENTAL CRITERIA
(See Minimum Requirements section)
C. MODIFICATIONS TO SUPPLEMENTAL CRITERIA
Potential bidders may request modifications to the City's supplemental criteria by submitting a
written request to the Purchasing Division via email to bids@tacoma.gov no later than 5:00
p.m. Pacific Time, three days prior to the submittal deadline. Please include the Specification No.
and Title when submitting such requests. Requests must include justification for why certain criteria
should be modified. Requests received after this date and time will not be considered.
The City will respond to a timely submitted request prior to the bid opening date. Changes to the
supplemental criteria, if warranted, will be issued by addendum to the solicitation documents and
posted to the City's website for the attention of all prospective bidders.
D. DETERMINATION OF BIDDER RESPONSIBILITY
If the City determines the bidder does not meet the criteria above and is therefore not a
responsible bidder, the City shall notify the bidder in writing with the reasons for its determination. If
the bidder disagrees, the bidder may appeal the determination in a manner consistent with the
City's Protest Policy. Appeals are coordinated by the Purchasing Division heard by the
Procurement and Payables Division manager for contracts less than or equal to
$500,000 and by Contracts and Awards Board for contracts greater than $500,000.
Request for Bids Specification No. TR26-0194N
Template Revised: 08/01/2025

MINIMUM REQUIREMENTS
List any minimum requirements for respondents. See Supplemental Requirements in Notice to
Bidders above.
1. STANDARD TERMS AND CONDITIONS / GENERAL PROVISIONS
City of Tacoma Standard Terms and Conditions apply.
City of Tacoma General Provisions apply.
2. INSURANCE REQUIREMENTS
Successful proposer will provide proof of and maintain the insurance coverage in the amounts and
in the manner specified in the City of Tacoma Insurance Requirements contained in this
solicitation. (See Appendix)
3. DESCRIPTION OF WORK
The City of Tacoma (City) / Tacoma Public Utilities (TPU) is soliciting bids to establish one contract
with qualified vendors to fulfill the City's needs to provide complete new domestic LEFT HAND
115RE, insulated number 7 turnout as shown on plan RAIL-02 (right hand for reference purpose).
Contract will be awarded to the lowest responsive and responsible bidder(s) based on price,
product quality and availability. Please provide lead time and freight cost.
A. All rail, switch points (excluding tip), frogs, and guard rails shall be DOMESTIC, all other
OTM may be foreign or domestic.
Switch shall have Manganese Tips and Head Hardened 16' 6" Double Reinforced Knife Point
switch points with Transit style clips and fixed heel blocks. Switch shall include all Turnout rails,
Stock rails, and Closure rails. Must be 115RE Head Hardened Rail and include all associated
screw spike plates, screw spikes and elastic fasteners (Pandrol Style) and 5' 0" U69 Raised
Adjustable Switch Point Guard Rail Assembly (ahead of switch) or approved equivalent. Joint bars
(6 hole) and bolts shall be included. Switch rods shall be equipped with lock washers and cotter
pins.
Switches shall come equipped with GB style switch point rollers designed for 16' 6" switch points
and plates. Ensure compatibility with specific slide plates and switch point bolt patterns for proper
operation.
All mixed hardwood switch ties, in accordance with AREMA guidelines, shall be included.
Insulated Turnouts shall include all necessary insulated 6-hole joint bars.
Frogs shall be in accordance with Tacoma Rail Standard plan and be a No. 7 Rail Bound
Manganese Steel Frog for 115RE HH Rail with screw spike plates, screw spikes and elastic
fasteners. Frog shall be drilled for three (3) bolts to match the specified rail. Guard Rails shall be in
accordance with 2014 AREMA Portfolio plan No. 504-03 (13 feet; with HH Rail) and fastened with
screw spike plates and elastic fasteners.
Switch stand shall be a new Racor Model 22-E with low banner and 45" tri-handle "Backsaver",
and adjustable connecting rod (42-inches) and bolts with lock washers and cotter pins. The bolt
Request for Bids Specification No. TR26-0194N
Template Revised: 08/01/2025

Question Deadline: 9/15/2026
City response to Questions: 9/17/2026
Submittal Due Date: 9/25/2026
Anticipated Award Date, on or about: 10/2/2026

hole in the switch stand, connecting rod and switch rods will all be the same matching diameter
with matching size bolts. Mismatch of bolts and bolt holes will be cause for rejection. All switch
bolts shall be designed for cotter pins.
B. Please use No. 7 Right Hand plan attached to this specification for reference of LEFT HAND
No. 7 turnout.
4. CALENDAR OF EVENTS
This is a tentative schedule only and may be altered at the sole discretion of the City.
The anticipated schedule of events concerning this RFB is as follows:
Question Deadline: 9/15/2026
City response to Questions: 9/17/2026
Submittal Due Date: 9/25/2026
Anticipated Award Date, on or about: 10/2/2026
5. INQUIRIES
5.1 Questions can be submitted to Rebecca Lewis, Buyer, via email to RLewis4@tacoma.gov.
Subject line to read:
TR26-0194N - New 115RE Left Hand No 7 Turnout - VENDOR NAME
5.2 Questions are due by 3 pm on the date included in the Calendar of Events section.
5.3 Questions marked confidential will not be answered or included.
5.4 The City reserves the discretion to group similar questions to provide a single answer or not
to respond when the requested information is confidential.
5.5 The answers are not typically considered an addendum.
5.6 The City will not be responsible for unsuccessful submittal of questions.
5.7 Written answers to questions will be posted alongside these specifications at
www.tacomapurchasing.org.
6. PRE-BID MEETING
No pre-bid meeting will be held; however, questions and request for clarifications of the
specifications may be submitted as stated in the inquiries section.
7. DISCLAIMER
The City is not liable for any costs incurred by the Respondent for the preparation of materials, or a
proposal submitted in response to this RFB, for conducting any presentations to the City, or any
Request for Bids Specification No. TR26-0194N
Template Revised: 08/01/2025

other activities related to responding to this RFB, or to any subsequent requirements of the
contract negotiation process.
8. RESPONSIVENESS
Bid submittals must provide ninety (90) days for acceptance by City from the due date for receipt of
submittals. All submittals will be reviewed by the City to determine compliance with the
requirements and instructions specified in this RFB. The Respondent is specifically notified that
failure to comply with any part of this RFB may result in rejection of the submittal as non-
responsive. The City reserves the right, in its sole discretion, to waive irregularities deemed
immaterial. The City also reserves the right to not award a contract or to issue subsequent RFB's.
9. AWARD
Awardee shall be required to comply with 2 CFR part 25 and obtain a unique entity identifier
and/or be registered in the federal System for Award Management as appropriate.
Award will be made to the lowest responsive, responsible bidder. All bidders shall provide unit or
lump sum pricing for each line item. Each line item will be added up for a subtotal price. The
subtotal price will be compared amongst each bidder, including any payment discount terms
offered twenty (20) days or more. The City may also take into consideration all other criteria for
determining award, including evaluation factors set forth in Municipal Code Section 1.06.262.
All other elements or factors, whether or not specifically provided for in this specification, which
would affect the final cost to and the benefits to be derived by the City will be considered in
determining the award of the contract. The final award decision will be based on the best interests
of the City.
The City reserves the right to let the contract to the lowest responsible bidder whose bid will be the
most advantageous to the City, price and any other factors considered. In evaluating the
proposals, the City may also consider any or all of the following:
1. Compliance with specification.
2. Proposal prices, listed separately if requested, as well as a lump sum total
3. Time of completion/delivery.
4. Warranty terms.
5. Bidder's responsibility based on, but not limited to:
a) Ability, capacity, organization, technical qualifications and skill to perform the
contract or provide the services required.
b) References, judgment, experience, efficiency and stability.
c) Whether the contract can be performed within the time specified.
d) Quality of performance of previous contracts or services
10. DELIVERY
10.1 Delivery shall be to the City of Tacoma, Tacoma Rail, 2601 SR509 N. Frontage Rd, Tacoma,
WA, 98421.
Each vendor will be required to submit a delivery timeline they can commit to. Purchase
order delivery dates will reflect this timeline. In the event a purchase order deliver date is
Request for Bids Specification No. TR26-0194N
Template Revised: 08/01/2025

not met, the City reserves the right to purchase these products elsewhere if they are in a
time constraint. If constant late deliveries occur, the City may terminate the contract.
10.2 Hours of operation shall be Monday through Friday, 7:00 a.m. to 1:30 p.m., excluding legal
holidays, as referred to in the Standard Terms and Conditions or as otherwise approved by
the City.
11. WARRANTY
Parts: Manufacturer's warranty or minimum one-year warranty whichever is greater.
Contractor agrees to allow City to make minor warranty repairs where that is most cost effective
and, if requested, contractor will credit City for cost of parts, but not labor.
Vendor will warrant goods according to the manufacturer's warranty guidelines. The start of the
warranty commences once the goods are delivered and accepted by the City.
12. INSPECTION
All goods are subject to final inspection and acceptance by the City. If any inspection fails, the
vendor shall be required to make arrangements to exchange the goods at their own expense and
replace it in a timely manner acceptable to the City.
Material failing to meet the requirements of this contract will be held at Vendor's risk and may be
returned to Vendor. If so returned, the cost of transportation, unpacking, inspection, repackaging,
reshipping, or other like expenses are the responsibility of the Vendor.
13. APPROVED ITEM EQUIVALENT
A specific manufacturer for almost all line items has been listed in the Technical Specifications
because this is the current manufacturer accepted. For those line items, which do not list a specific
manufacturer, bidders shall provide the technical specifications for the manufacturer they are
offering. The City may request, after the bid due date, a sample of that product for review and
approval by the City. The City reserves all rights to be the sole judge as to whether any other
manufacturer can meet or exceed the current specifications they use. Unless an item is indicated
"No Substitute", approved equivalents shall be submitted by the date listed in the Calendar of
Events section. Equivalents will be approved by Addendum to the solicitation.
14. COMPLIANCE WITH SPECIFICATIONS
All products shall be new and unused. Any product that does not comply with any part of these
technical specifications shall be rejected and the vendor shall, at its own expense, including
shipping, replace the item.
15. MATERIALS AND WORKMANSHIP
The successful bidder shall be required to furnish all materials necessary to perform contractual
requirements. Materials and workmanship for this contract shall conform to all codes, regulations
and requirements for such specifications contained herein and the normal uses for which intended.
Request for Bids Specification No. TR26-0194N
Template Revised: 08/01/2025

This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

Project: BID - SSC - Auto HVAC Replacement - South Seattle College Ref.

State Government of Washington

Bid Due: 11/19/2026

Bid Number: JCSO-04 Bid Title: Jail Food Services Category: Sheriff Dept Status: Open

Jefferson County

Bid Due: 11/23/2026

Follow REQUEST FOR INFORMATION (RFI) - No.10826-RD [Mid-energy electron beam (eBeam) systems -

ENERGY, DEPARTMENT OF

Bid Due: 11/18/2026

Follow NAVIGATION LOCK TAINTER VALVE (TV) REPAIR, TV1 Active Contract Opportunity Notice ID

DEPT OF DEFENSE

Bid Due: 11/30/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.