| Location: | California |
|---|---|
| Posted: | Mar 9, 2026 |
| Due: | Mar 23, 2026 |
| Agency: | HOMELAND SECURITY, DEPARTMENT OF |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | 70Z08526Q0023425 |
| Publication URL: | To access bid details, please log in. |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
SCOPE OF WORK
U. S. COAST GUARD CUTTER GEORGE COBB
NAVSEA Doors and Scuttles.
SECTION 1 – GENERAL INFORMATION
1.1 Scope of Work
Provide seven doors (USCG DWG FL-1602-89) and two scuttles (NAVSEA DWG 803-1401890 and 803-1401892) in accordance with below description. Steel construction.
Doors (Total Qty. 7)
(1) x DOOR - 26" X 66" C.O ., WEAT, RH W/ HASP AND STAPLE, W/0 FIXED LIGHT, USCG DWG FL- 1602- 89
(1) x DOOR - 26" X 66" C.O ., WEAT, LH W/ HASP AND STAPLE, W/0 FIXED LIGHT, USCG DWG FL- 1602- 89
(1) x DOOR - 26" X 66" C.O ., WEAT, LH W/ HASP AND STAPLE, W/0 FIXED LIGHT, USCG DWG FL- 1602- 89
(1) x DOOR - 26" X 66" C.O., WEAT, RH W/ HASP AND STAPLE W/ 14" X 18" FIXED LIGHT, USCG DWG FL- 1602- 89
(1) x DOOR - 26" X 66" C.O., WEAT, LH W/ HASP AND STAPLE W/ 14" X 18" FIXED LIGHT, USCG DWG FL- 1602- 89
(1) x DOOR - 26" X 66" C.O., WEAT, LH W/ HASP AND STAPLE AND 9" DIA FIXED LIGHT, USCG DWG FL- 1602- 89
(1) x DOOR - 26" X 66" C.O., WEAT, RH W/ HASP AND STAPLE AND 9" DIA FIXED LIGHT, USCG DWG FL- 1602- 89
Scuttles (Total Qty. 2)
(1) x 18" DIA C.O., RSD, QA, WT, W/ INTERNAL TOGGLE PIN LOCK, COAMING 12" HEIGHT (NAVSEA DWG 803-1401890)
(1) x 21" DIA C.O., RSD, QA, WT. W/ HASP & STAPLE, COAMING 12" HEIGHT (NAVSEA DWG 803-1401892)
1.2 Contact for questions:
1.1.5.1 Any questions regarding scope of work must be directed to the Contracting Officer. All items shall be new manufacture and fully compliant with the referenced drawings and any specifications identified in the scope of work.
1.3 Required Delivery Date and Address
Required supplies shall be delivered to the below address within 12 months of contract award and tracking info must be supplied to the Government representative listed below within 48 hours of each individual supply being shipped.
ATTN: MKCS William Gentry
USCGC GEORGE COBB (WLM-564)
1001 South Seaside Avenue
San Pedro, CA 90731

With GovernmentContracts, you can:
...Equipment Rental (Light) Services - IFB 10218021Details Event ID 0000039004 Format/Type: Sell... of ...
State Government of California
Bid Due: 6/04/2026
..., tools, equipment, services, supervision, and incidentals necessary to repair and replace VTA's ...
Santa Clara Valley Transportation Authority
Bid Due: 6/09/2026
...Engineering Construction Construction Sub NAICS Industry 423610: Electrical Apparatus and Equipment... Construction Whole ...
City of Los Angeles
Bid Due: 6/17/2026
...a diverse fleet of light-, medium-, and heavy-duty vehicles and equipment operated by ...
Solano County
Bid Due: 6/19/2026