e used f Creek Crossing Protection – Alpine Park
Not to b Capital Project No. 2687
Bid Doc. No. 26-426
Four Rivers Sanitation Authority
Rockford, Illinois
Bidding Requirements and Contract Forms
s and
e General Provisions and Technical Specifications
s for
o Sanitary Sewer Construction
rp for
Creek Crossing Protection –inAglppinue Park Capital Project No. 2687
idd Board of Trustees
r b Richard Pollack
Ben Bernsten
fo Richard Mowris
Ginger Haas
d Brad Long
. . . . . . . . . . . . . . . . . . President
. . . . . . . . . . . . . . . . . . Vice President
. . . . . . . . . . . . . . . . . . Clerk/Treasurer
. . . . . . . . . . . . . . . . . . Trustee
. . . . . . . . . . . . . . . . . . Trustee
use Official
e Christopher T. Baer, PE . . . . . . . . . . . . . . . . . . Executive Director
Not to b Matthew L. Campbell, PE . . . . . . . . . . . . . . . . . . Director of Engineering
Bid Doc. No. 26-426
Table of Contents
I. Bidding Requirements
Article 1 Notice to Bidders
oses Article 2
Instructions to Bidders
1 General
2 Legal Requirements
3 General Instructions
Not to be used for bidding purp Article 3
Detailed Specifications
1 General
2 Notification, Access, and Special Considerations
3 Permit Requirements
4 Abandon and Fill Existing Sanitary Sewers
5 Aggregate Ditch Checks
6 Bypass Pumping
7 Concrete Encasement for Sanitary Sewers
8 Construction Layout
9 Dewatering
10 Erosion Control Blanket
11 Filter Fabric
12 Manholes, Type A
13 Perimeter Erosion Barrier
14 Precast Reinforced Concrete Flared End Section
15 Remove Existing Flared End Section
16 Remove Existing Storm Manhole
17 Riprap Slurry
18 Rock Excavation For Sanitary Sewer
19 Sanitary Manholes
20 Sanitary Manholes to Be Removed and Replaced
21 Sanitary Sewer Main Line Repair
22 Sanitary Sewer
23 Seeding and Fertilizing
24 Stabilized Construction Entrance
25 Stone Riprap for Sanitary Sewer Stream Crossing
26 Storm Sewer Removal
27 Storm Sewers
28 Tree Planting
29 Tree Removal
Bid Doc. No. 26-426
Creek Crossings – Alpine Park
Capital Project No. 2687
II. Contract Forms
Proposal
Fair Employment Practices Affidavit of Compliance
Affidavit of Compliance: Responsible Bidder Ordinance
Bid Bond
Agreement
s Labor & Material Payment Bond
e Performance Bond
os III. General Provisions and Technical Specifications for Sanitary Sewer
Not to be used for bidding purp Construction (separate document incorporated by reference)
Bid Doc. No. 26-426
Table of Contents / Page 2 of 2
Not to bBeidudsinegSdeRfcoetiqorunbirIiedmdeinntsg purposes
Bid Doc. No. 26-426
This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.