PREMISE WIRING B145

Location: Montana
Posted: Apr 2, 2026
Due: Apr 10, 2026
Agency: DEPT OF DEFENSE
Type of Government: Federal
Category:
  • 59 - Electrical and Electronic Equipment Components
Solicitation No: FA462626Q0009
Publication URL: To access bid details, please log in.
Follow
PREMISE WIRING B145
Active
Contract Opportunity
Notice ID
FA462626Q0009
Related Notice
Department/Ind. Agency
DEPT OF DEFENSE
Sub-tier
DEPT OF THE AIR FORCE
Major Command
AIR FORCE GLOBAL STRIKE COMMAND
Office
FA4626 341 CONS LGC
Looking for contract opportunity help?

APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.

APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.

The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).

General Information View Changes
  • Contract Opportunity Type: Solicitation (Updated)
  • Updated Published Date: Apr 02, 2026 02:26 pm MDT
  • Original Published Date: Mar 20, 2026 01:48 pm MDT
  • Updated Date Offers Due: Apr 10, 2026 01:00 pm MDT
  • Original Date Offers Due: Apr 06, 2026 01:00 pm MDT
  • Inactive Policy: 15 days after date offers due
  • Updated Inactive Date: Apr 25, 2026
  • Original Inactive Date: Apr 21, 2026
  • Initiative:
    • None
Classification
  • Original Set Aside: Total Small Business Set-Aside (FAR 19.5)
  • Product Service Code: 5975 - ELECTRICAL HARDWARE AND SUPPLIES
  • NAICS Code:
    • 238210 - Electrical Contractors and Other Wiring Installation Contractors
  • Place of Performance:
    Malmstrom AFB , MT 59402
    USA
Description View Changes

Engineer, furnish, install, and test (EFI&T) a premises wiring upgrade to new plenum-rated Cat-6 and OM4 multimode (MM) fiber cabling for Building 145 (B145) at Malmstrom AFB, MT. The Cat-6 and OM4 MM fiber drop layouts are shown in Attachment A, Layout Drawings. The upgrade shall include installation and replacement of communications (comms) racks/cabinets, installation of new AC power with power distribution unit (PDU), and comms rack/cabinet grounding. The Contractor shall remove all existing outdated and abandoned-in-place (AIP) Cat-3/5 and MM fiber cabling, along with any residual materials, from the building and dispose of them accordingly.



Amendment 0001:



1. A site visit has been scheduled for April 7th 2026 at 10:00 MST. The site visit will begin at the contracting office front lobby located 7015 Goddard Dr., Bldg. 145. Malmstrom AFB, MT 59402.



2. To Extend the Solicitation from April 6th 2026 to April 10th 2026 1:00 PM MST



RFIs answered




  1. How many existing drops can be taken out of service while new cabling is being installed? This will have to be a phased plan with sections being done at a time.

    1. We have a pretty good idea on how we want it done, but we are open to working with the contractor to find the best solution.



  2. Please clarify the description “new/replacement”. Is an existing drop already in this location and we are removing the existing cabling or is this a totally new location? If some are new and some are replacement, what is the count of each? 90% will removing and replacing what is already there.

    1. There is a few area that require new drops to be cut in from existing cabling that is running out in the open.



  3. Section 4.7.3 mentions SIPRNet. We find no SIPRNet locations called out in the drawings. Will there be any SIPRNet locations?

    1. Figure ATT-2 (the last page) shows 8 SIPR drops and that they all will be redirected to CEL-2.



  4. Section 4.7.16 Generally, is the amount of cable known to exist about equal to the number of new cables to be installed or is there a large amount of previously abandoned cable to be removed? It is not equal as I know there is a room full of 66 blocks and cooper that will need to be pulled.

    1. It should state somewhere that all unused copper will be removed from the building.



  5. Is there existing backbone to the new rack locations? Is the contractor responsible for terminating, placing in patch panels, patch cords, etc.? There is no new rack location. It will be racking replacements and there is already a backbone there.

    1. Yes, for terminating to the patch panel. We will patch into the switch.





See Attached SOO for full details.




Attachments/Links
Contact Information
Contracting Office Address
  • ADMIN ONLY NO REQTN CP 406 731 3744 7015 GODDARD DR BLDG 145
  • MALMSTROM AFB , MT 59402-6863
  • USA
Primary Point of Contact
Secondary Point of Contact
History

Related Document

Mar 20, 2026[Solicitation (Original)] PREMISE WIRING B145
Mar 30, 2026[Solicitation (Updated)] PREMISE WIRING B145
Apr 8, 2026[Solicitation (Updated)] PREMISE WIRING B145
Apr 9, 2026[Solicitation (Updated)] PREMISE WIRING B145
Apr 19, 2026[Solicitation (Updated)] PREMISE WIRING B145
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL
* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.