| Location: | Georgia |
|---|---|
| Posted: | Mar 21, 2025 |
| Due: | May 1, 2025 |
| Agency: | State Government of Georgia |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | PE-33552-NONST-2025-000000009 |
| Publication URL: | To access bid details, please log in. |
| Event ID | Event Title | Government Entity | Start Date (ET) | End Date (ET) |
| PE-33552-NONST-2025-000000009 | WATER INFRASTRUCTURE IMPROVEMENTS | Fort Valley Utility Commission |
Mar 21, 2025 @ 01:17 PM
|
May 01, 2025 @ 10:00 AM
|
Start Date: Mar 21, 2025 @ 01:17 PM ET
End Date:
May 01, 2025 @ 10:00 AM ET
Request for Proposal (RFP)RFP #32172.0001- Contract A-TankPeach County Water Infrastructure Improvements
Issue Date: March 21, 2025The Fort Valley Utility Commission (FVUC) is seeking Sealed proposals for the construction of new water supply wells, elevated water storage tank, water treatment plants, and water mains located along Fulwood Road and River Road in Peach County, GA. Sealed Proposals will be accepted at the Fort Valley Utility Commission, in the Meeting Room, 500 Anthoine Street, Fort Valley, Georgia 31030 until 10:00 AM, Thursday, May 1, 2025, at which time they will be opened publicly.For the Bid Submittal Instructions see RFP documents and Contract Documents Section 00 21 13 ¿Instruction for Bidders¿.
The scope of the project shall consist of the following generally described work: Peach County Water Infrastructure Improvements: Contract A: 750,000-gallon elevated water tank - Complete
The scope of work in Contract A includes construction of a new 750,000-gallon elevated water storage tank along GA Hwy 49/Peach Parkway in Peach County, GA., within the proposed Peach Parkway water treatment compound. The work in Contract A includes permitting, clearing, grassing, earthwork, grading, erosion control, gravel access driveway, a new 750,000-gallon elevated storage tank, painting, piping, fittings, valves, wiring, electrical components, SCADA, and all necessary material, labor, and appurtenances associated with a complete new elevated water storage tank as shown on the plans and in the specifications.
Plans and Specifications are to be obtained from Thomas & Hutton Engineering Co., 5553 Peachtree Road, Suite 175, Atlanta, GA 30341, (Issuing Office) upon payment of $200.00 (plus shipping charges as applicable). The payment is non-refundable. Contact Maggie Cofer via phone (678) 730-1894, or email: cofer.m@tandh.com to request plans and specificationPlans and Specifications are to be obtained from Thomas & Hutton Engineering Co., 5553 Peachtree RoaD
| Code | Description |
| 91775 | Maintenance and Repair, Other Infrastructure |
| 95115 | Infrastructure and Infrastructure Improvements |
| 96891 | Water Supply Analysis, Infrastructure Analysis, Water Quality Analysis, and Long Term Planning |
Tara Giles
tgiles@fvutil.com
478-825-7701 ext 250

With GovernmentContracts, you can:
...to fire hydrants, valves, manholes, storm structures, pavement replacement, earthwork, grassing, soil...
State Government of Georgia
Bid Due: 6/25/2026
.... * Earthwork 1,500 CY * Curb & Gutter 1,654 LF * Concrete ...
Gwinnett County
Bid Due: 6/25/2026
..., sidewalk, and curb & gutter. * Earthwork 300 CY * Curb & ...
Gwinnett County
Bid Due: 6/25/2026
...labor, materials, earthwork, construction operations, details, supervision, and coordination of all...
State Government of Georgia
Bid Due: 6/18/2026