VILLAGE OF GURNEE
NOTICE TO BIDDERS
Municipality:
Road District
County
Project No.
VILLAGE OF GURNEE
LAKE
8467
TIME AND PLACE OF OPENING OF BIDS:
Sealed proposals for the improvement described below will be received at the office of the Village of Gurnee,
Engineering Division, 325 N. O’Plaine Road, Gurnee, Illinois 60031, until 10:00 A.M., April 27, 2026. Proposals will
be opened and read publicly at that time.
DESCRIPTION OF WORK:
“Fuller Road Reconstruction”
Project # 8467
LOCATIONS:
• Fuller Road from Grand Avenue to Stearns School Road
PROPOSED IMPROVEMENT:
Scope of work includes full reconstruction of Fuller Road, sidewalk installation, ADA improvements, water main
replacement, drainage system improvements, minor pavement striping, and ditch grading
BIDDERS INSTRUCTIONS:
1. The General Contractor will need provide a $2,000,000 Drainage prequalification certificate from Illinois
Department of Transportation (IDOT) in order to receive the bid documents and plans. Please submit
prequalification certificates to engineering@village.gurnee.il.us.
Construction bidding documents (drawings, specification, and addenda) will be distributed via the
Village of Gurnee’s FTP site LiquidFile, for no additional cost after prequalification is received.
2. The Contractor must abide by the articles included in the Prevailing Wage Act (820 ILCS 130).
3. The awarding authority reserves the right to waive technicalities and to reject any or all proposals as
provided in Check Sheet LRS 6 of the “Supplemental Specifications and Recurring Special Provisions,”
prepared by the Department of Transportation. The contractor is not required to provide a guarantee in
accordance with Sheet LRS 6.
By Order Of The:
Village of Gurnee
(Awarding Authority)
Andy Harris
Village Clerk