| Location: | North Carolina |
|---|---|
| Posted: | Aug 5, 2026 |
| Due: | Aug 12, 2026 |
| Agency: | City of Charlotte |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 269-2027-011 |
| Publication URL: | To access bid details, please log in. |
Project Description: This project will be installing a 12 foot wide shared-use path along WT Harris Blvd from JW Clay Blvd to N Tryon St. Improvements will include the new concrete walkway, new pedestrian ramps, pedestrian traffic signals, new pedestrian lighting, and storm drainage measures. This project will improve pedestrian and cyclist mobility and safety in the area, as well as connect to the new JW Clay Streetscape Improvements project.

With GovernmentContracts, you can:
...DD00529 BP4.R045.3 POC GRADING, PAVING, DRAINAGE AND STRUCTURE 970023_970023014....tif_08011940_plans.pdf Doc. Type: Letting Support ...
Division of Highways
Bid Due: 9/08/2026
...DD00529 BP4.R045.3 POC GRADING, PAVING, DRAINAGE AND STRUCTURE BR0150_Final Plans- Signed.pdf Doc.... Type: ...
Division of Highways
Bid Due: 9/08/2026
...ITB - Sessoms Street Drainage Improvements Reference number: COF1517023 Closing date October 01..., ...
City of Fayetteville
Bid Due: 10/01/2026
...DF00569 POC Grading, Drainage & Signals - NC 82-217 & US 421 - ...
Division of Highways
Bid Due: 9/02/2026