| Location: | Pennsylvania |
|---|---|
| Posted: | Aug 5, 2026 |
| Due: | Sep 9, 2026 |
| Agency: | PennBid |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | Bucks County Water and Sewer Authority, Pa |
| Publication URL: | To access bid details, please log in. |
Project Description: The project generally involves the installation of a washer compactor system at the headworks of the BCWSA Bristol Wastewater Treatment Plant, located on Maple Beach Road In Bristol Borough, Bucks County, Pennsylvania. The Work consists of the installation of a new washer compactor and all associated mechanical and electrical systems. Work shall include all necessary structural components; process piping; concrete work; valves; instrumentation and controls; electrical wiring, conduit, and equipment; and all related appurtenances required for a complete and operational installation.

With GovernmentContracts, you can:
...ELECTRICAL UPGRAD Description: The Department of Environmental Protection (DEP), Bureau of Air Quality... ...
State Government of Pennsylvania
Bid Due: 10/19/2026
...and distribution equipment, standby electrical power generation equipment, electrical conduits and wiring... periodic ...
PennBid
Bid Due: 10/05/2026
...and distribution equipment, standby electrical power generation equipment, electrical conduits and wiring... periodic ...
PennBid
Bid Due: 10/14/2026