Replace the existing 370-ton cooling tower, condenser water pumps, and main control panel. Project includes one Alternate for modifications to the existing chilled water piping system to provide emergency taps for rental chiller in case of chiller failure. CHANGE OF BID DATE.

With GovernmentContracts, you can:
...Delivery Method: Design-Bid-Build Agency Project Coordinator: BLAKE BARBARE Email: BLAKE.BARBARE... of an engineering ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 8/17/2026
...School District One Anticipated Project Delivery Method: Design-Bid-Build Agency Project Coordinator... term Indefinite ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 8/07/2026
...of a conceptual design for the replacement new Miriam Brown Community Center. Full ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 8/06/2026
...: Design-Bid-Build Construction Cost Range: n/a Agency Project Coordinator: Jamie Caggiano Email... Be ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 7/30/2026