Request for Bid
Demolition of Jarvis St. Elevated Tank Site
Foundation and Site Improvements
for the
GREENVILLE UTILITIES COMMISSION
of the
City of Greenville, N.C.
P.O. Box 1847
Greenville, North Carolina 27835
Issue Date: June 4, 2026
Bid Package Shall Be Received By:
2:00 PM on July 2, 2026
REQUEST FOR BID
Bids will be received in the Office of the Procurement Manager, Greenville Utilities
Commission, 401 S. Greene Street, Greenville, North Carolina 27834 until 2:00pm (EDT)
on July 2, 2026, for Demolition of Jarvis St. Elevated Tank Site and Site Improvements.
Greenville Utilities Commission reserves the right to reject any or all bids.
Late bids will not be considered.
SECTION I
GENERAL INSTRUCTIONS FOR INFORMAL QUOTES
GREENVILLE UTILITIES COMMISSION
REQUEST FOR BID
1.0 NOTICE TO BIDDERS
Quotations, subject to the conditions made a part hereof, will be received in the Office
of the Procurement Manager, Greenville Utilities Commission, 401 S. Greene Street,
Greenville, North Carolina 27834 until 2:00 pm (EDT) on July 2, 2026.
2.0 STANDARD FORMS REQUIRED
Each bidder must submit a proposal on the enclosed request for quotation form. The
quotation must be signed by an authorized official of the firm.
3.0 DEPOSIT
A deposit is NOT required for this quotation.
4.0 NC SALES TAX
Do not include NC sales taxes in the quoted figure; however, Greenville Utilities
Commission (GUC) does pay sales tax. Sales tax should be added to the invoice
as a separate item.
5.0 FEDERAL EXCISE TAX
GUC is exempt from Federal Excise Tax and will issue a Federal Exemption
Certificate upon request to the successful bidder.
6.0 EXCEPTIONS TO BE CLEARLY STATED
If quote is not in strict accordance with Section II, “Specifications,” bidder must list or
note all exceptions on the Request for Quotation Form, otherwise, it is fully
understood that the successful bidder will furnish equipment and/or materials exactly
as specified. GUC reserves the right to accept or reject quotes and to determine the
lowest responsible, responsive bid from the standpoint of quality, performance, and
price.
7.0 EVALUATION AND AWARD OF QUOTATIONS
GUC reserves the right to reject any and all quotations, to waive any and all
informalities, and to disregard all nonconforming or conditional quotes or counter
proposals. In evaluating quotes, GUC shall consider whether the quotes comply with
the prescribed requirements, plus all alternates or options requested. GUC reserves
the right to include or exclude any option or alternative in GUC’s opinion is in GUC’s
best interests. If a quote is to be awarded, it will be awarded to the lowest responsible,
responsive bidder whose evaluation by GUC indicates that the award will be in GUC’s
best interests.
8.0 PROMPT PAYMENT DISCOUNTS
Bidders are urged to compute all discounts into the price offered. If a prompt
payment discount is offered, it may be considered in the award of the contract.
9.0 NUMERICAL ERRORS
In the case of a discrepancy between a unit price and the extension (the unit price
multiplied by the number of units), the unit price governs. In the case where
numerical quotes are stated both in numbers and in words, the words govern.
10.0 QUANTITIES
NA.
11.0 CONTRACT PERIOD
60 Days.
12.0 BID WITHDRAWAL
A bidder must notify GUC in writing of its request to withdraw a bid within seventy-
two (72) hours after the bid opening, not including Saturdays, Sundays, or holidays.
In order to justify withdrawal, the bidder must demonstrate that a substantial error
exists and that the bid was submitted in good faith.
13.0 MINORITY BUSINESS PARTICIPATION PROGRAM
GUC has adopted an Affirmative Action and Minority and Women Business
Enterprise Plan (M/WBE) Program. Firms submitting a proposal are attesting that
they also have taken affirmative action to ensure equality of opportunity in all
aspects of employment, and to utilize M/WBE suppliers of materials and labor when
available.
14.0 CONTACT INFORMATION:
Questions regarding this bid request should be directed to Cleve Haddock, Lifetime
CLGPO, Procurement Manager at (252) 551-1533, haddocgc@guc.com. All
questions must be received via e-mail by or before 10:00 am (EDT) June 23,
2026.
15.0 TERMS AND CONDITIONS
The attached Terms and Conditions of Greenville Utilities Commission (GUC)
are considered part of the bid proposal.