| Location: | Florida |
|---|---|
| Posted: | Sep 2, 2024 |
| Due: | Oct 20, 2024 |
| Agency: | HOMELAND SECURITY, DEPARTMENT OF |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | 70Z080SSNINSULATION |
| Publication URL: | To access bid details, please log in. |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
ANIT-SWEAT INSULATION REMOVAL AND REPLACEMENT FOR CGC RESOLUTE.
5.2 Detailed Tasks:
5.2.1 The contractor shall remove and dispose of existing insulation in select areas.
5.2.2 Install approx. 680 feet of new insulation around select chill water and other lines ranging from ½” – 4” in diameter in accordance with the publications listed in section 7 of this document. Insulation should be rated to minimize heat transfer over a 60℉
5.2.3 Valves? Approx 20 CHW alone temperature differential with no condensation on the piping or exterior / interior of the insulation material.that may need replacing
5.2.4 Treat approx. 770 square feet of interior compartment vertical bulkheads to prevent all sweating in accordance with the publications in section 7. Bulkheads separating compartments with large temperature differences will be prioritized.
5.2.5 Replace and properly insulate approx. 20 linear feet of ducting that has corroded due to condensation.
5.2 Detailed Tasks:
5.2.1 The contractor shall remove and dispose of existing insulation in select areas.
5.2.2 Install approx. 680 feet of new insulation around select chill water and other lines ranging from ½” – 4” in diameter in accordance with the publications listed in section 7 of this document. Insulation should be rated to minimize heat transfer over a 60℉
5.2.3 Valves? Approx 20 CHW alone temperature differential with no condensation on the piping or exterior / interior of the insulation material.that may need replacing
5.2.4 Treat approx. 770 square feet of interior compartment vertical bulkheads to prevent all sweating in accordance with the publications in section 7. Bulkheads separating compartments with large temperature differences will be prioritized.
5.2.5 Replace and properly insulate approx. 20 linear feet of ducting that has corroded due to condensation.

With GovernmentContracts, you can:
...construction and drywall finishing. PRICING AND AWARD 1. Bids will be received on ...
Brevard County School Board
Bid Due: 6/30/2026
...construction and drywall finishing. PRICING AND AWARD 1. Bids will be received on ...
Polk County Public Schools Facilities and Operations
Bid Due: 6/30/2026
...construction and drywall finishing. PRICING AND AWARD 1. Bids will be received on ...
City of Ocala
Bid Due: 6/30/2026
...; Glazing; 09.01- Drywall; 21.01- Fire Protection; 22.01- Plumbing; 23.01- HVAC; 27.01...
State Government of Florida
Bid Due: 10/31/2026