| Location: | Florida |
|---|---|
| Posted: | Jul 1, 2025 |
| Due: | Jul 31, 2025 |
| Agency: | City of St. Petersburg |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
Project ID:
Title: Shore Acres Water Main Replacement – Phase 3 (Project No. 24127-130)
Addenda: 0
Release Date: 7/1/2025
Due Date: 7/31/2025
The City of St. Petersburg is seeking responses from qualified Contractors for the replacement of approximately 1,800 Linear Feet (LF) of 8-inch Water Main (WM) and 430 LF of 2-inch WM. The project also includes the appropriate testing and disinfection of the proposed WM, connection to the existing WMs at each end of the project and to existing services, associated valves, fittings, fire hydrant assemblies and appurtenances required to replace the existing 8” and 2” water mains, surface and roadway restoration, including milling and repaving as shown in the plans. The WM is to be installed using a combination of Horizontal Directional Drilling (HDD) and Open Cut (OC) methods as shown in the plans and specified herein.

With GovernmentContracts, you can:
...Drilling of approximately 7,400 LF of 12" DR-11 HDPE and open-cut placement of ...
Polk County Public Schools Facilities and Operations
Bid Due: 6/23/2026
...Drilling of approximately 7,400 LF of 12" DR-11 HDPE and open-cut placement of ...
City of DeLand
Bid Due: 6/23/2026
...were few restrictions on drilling of drainage wells until 1966; since that time, ...
City of Orlando
Bid Due: 6/11/2026
..., monitoring well drilling, sampling, reports, studies, recommendations, design, inspection services...
City of Hollywood
Bid Due: 7/22/2026