Request For Proposals - Renovations To Al Rollins Park

Location: Georgia
Posted: Feb 12, 2026
Due: Feb 24, 2026
Agency: City of Dalton
Type of Government: State & Local
Category:
  • Z - Maintenance, Repair or Alteration of Real Property
Publication URL: To access bid details, please log in.
Bid/RFP Status:
Open - accepting bids and proposals
Bid/RFP Due Date:
Tuesday, February 24, 2026 - 2:00pm
Back to Bids/RFPs

THE CITY OF DALTON (the “City”), pursuant to the provisions of O.C.G.A. § 36-91-1, et. seq., herein seeks competitive Proposals from contractors for the construction of: “Renovations to Al Rollins Park”, located at 521 Threadmill Rd, Dalton, GA 30720 (the “Project”).

In general, the project includes re-grading of the existing baseball fields, installation and upkeep of soil and erosion control measures, irrigation, new sod, new in-field material, fencing, new pre-cast restroom building and all other materials & labor required for a complete project. The requirements for construction of the Project, and the duties and responsibilities of the contractor whose Proposal is accepted (“Successful Contractor”), are set forth in the Contract Documents which include the Instructions to Proposers; the Contract for Construction and Incorporated General Conditions (the “Contract”); any supplementary and other conditions; the drawings; the specifications; and any addenda issued by the Architect.

Any contractor submitting a Proposals must register with the City’s Vender Registry and download complete set of the Contract Documents. Vender Registry is posted here: https://www.daltonga.gov/finance/page/vendor-packets . Open Solicitations are posted here: https://www.daltonga.gov/rfps . The Contractor is solely responsible for obtaining any addenda or further correspondence from the procurement website for this solicitation.

All documents are available for inspection by the public at the Architect’s office at 855 Abutment Road Suite 4 Dalton, GA 30721. The Contract Documents require, among other things, the furnishing of all materials, labor, and equipment for construction of the Project. The City reserves the right to make available other relevant documents or information concerning the Project.

Any Contractor who intends to submit a Proposal is required to attend a Pre-Proposal Meeting, which will be held on the 27th day of January 2026, at 2:00 p.m. at the project site. Any contractor arriving more than 5 minutes late will not be permitted to attend.

A Proposal must strictly comply with all requirements set forth in the Instructions to Proposers. A Proposal must contain the completed Proposal Form which sets forth the Contractor’s proposed lump sum contract price for full and complete construction of the Project in conformity with all requirements of the Contract Documents. A Proposal must also include the Contractor’s responses to all questions, and a fully executed Bid Bond in the amount of five percent (5%) of the proposed lump sum contract price (exclusive of any alternates and unit prices) in the form required by the Instructions to Proposers and a completed E-Verify form

Any contractor who intends to submit a Proposal is required to visit the Project Site and familiarize itself with the local conditions under which the required work is to be performed and include in its lump sum cost all necessary expenses required to perform and complete the Project.

In evaluating Proposals, the City may seek additional information from any contractor concerning such contractor’s Proposal or its qualifications to construct the Project.

The City intends to award the construction contract to the responsible and responsive contractor whose Proposal is determined in writing to be the most advantageous to the City, take into consideration the following evaluation factors which are listed below:

A. General Background / Firm History (5 Points)

B. Financial Status and Bonding (5 Points)

C. Proposed Project Personnel (15 Points)

D. Company Experience (30 Points)

E. Legal Proceedings (5 Points)

F. The Contractor’s proposed lump sum fee (35 Points).

G. The completeness and accuracy of proposal. (5 Points)

Sealed proposals will be received by the City of Dalton Finance Department located at 300 W. Waugh Street, Dalton, Georgia 30720 until: 2:00 p.m. on the 24th day of February 2026. All proposals must be sealed and plainly marked “Renovations to Al Rollins Park”. A total of 2 proposals in bound notebooks are required. Please tab each section/form individually. Any Proposal received after said time will not be accepted. At the discretion of the City and in conformity with the applicable laws of the State of Georgia, the City may afford contractors an opportunity for subsequent discussion, negotiation, and revision of Proposals. The City reserves the right to reject any or all Proposals and to waive any technicalities or formalities.

Any proposal must include an executed E-Verify Affidavit, Exhibit I. Proposals not including executed E-verify affidavit will be automatically rejected.

Each Contractor is responsible for ensuring its Proposal complies with Georgia law, including but not limited to all state and local laws, rules, regulations, ordinances, and policies. Each Proposal must include an affidavit meeting all requirements of O.C.G.A. § 13-10-91, verifying compliance with applicable Federal work authorization program. The form for such affidavit is attached as an exhibit to the Instructions to Proposers.

Contractors understand and agree that the Proposal it submits to the City for consideration shall remain open for acceptance by the City and same shall be honored by the contractor, for a period of sixty (60) days from the date set forth hereinabove for the receipt of Proposals.

Contractor must have minimum Worker’s Compensation and General Liability Insurance in full force and effect and submit evidence of such insurance policy to the satisfaction of the City. The City will not consider any Proposal that is not accompanied by satisfactory evidence that the contractor holds any and all necessary or required Federal, State, or local licenses and/or permits. The City’s acceptance of any such evidence of the applicable insurance policy or licenses or permits does not alter or change a contractor’s responsibility to comply with such specifications. Pursuant to O.C.G.A. § 13-10-91, all contractors and sub-contractors performing work within the State of Georgia in accordance with or related to a contract with a public employer must register and participate in a federal work authorization program. The contractor shall provide certification of such registration and participation in a Federal work authorization program to the City. Each contractor shall submit with its Proposal a copy of its current Business License and/or Occupational Tax Certificate issued in the state in which the Contractor resides. If a contractor cannot provide such license, it will be required to obtain one from the City of Dalton / Whitfield County if it is awarded the construction contract for the Project.

See attached RFP document below for complete information.

Supporting Documents

Attachment Preview

INCORPORATED
855 Abutment Road
Suite Four
Dalton, GA 30721
706.529.5895
Renovations to:
AL ROLLINS PARK
521 THREADMILL RD, DALTON GA 30720
THE CITY OF DALTON, GA
E
O
EG I
R
ST
G
ERE
I
No. 22553
PROFESSIONAL
ESTEONNG I NWEEHROB
GSWCC LEVEL II - 0000008686
JOB NO.: 24-006
DATE ISSUED: 12/01/25
THIS MANUAL IS THE EXCLUSIVE PROPERTY OF KRH ARCHITECTS, INC. AND HAS BEEN PREPARED AS AN
INSTRUMENT OF SERVICE FOR THE CITY OF DALTON. THE USE OR REPRODUCTION IN ANY FORM OF THESE
CONTRACT DOCUMENTS WITHOUT WRITTEN APPROVAL OF THE ARCHITECT IS STRICTLY PROHIBITED.
C 2025 - KRH ARCHITECTS, INC.
TABLE OF CONTENTS
RENOVATIONS TO AL ROLLINS PARK
Division 0 Bid Requirements
00010
00030
00060
00080
00090
00110
00120
00130
0010
00150
Request for Proposals ............................................................2
Contractor’s Qualification and Instructions...........................7
Request for Best and Final Offers (At Owner’s Option) .......1
Proposal Form - Exhibit “H.................................................6
The Contract for Construction ...............................................40
Payment Bond ........................................................................2
Performance Bond .................................................................3
Bid Bond – Exhibit “J..........................................................2
E-Verify Form Exhibit “I” .....................................................2
Preliminary Construction Schedule .......................................1
Division 1 General Requirements
01020
01250
01290
01310
01320
01322
01330
01400
01420
01500
01700
01731
01770
Allowances .............................................................................5
Contract Modification Procedures .........................................2
Payment Procedures ...............................................................6
Project Management and Coordination. ................................7
Construction Progress Documentation ..................................4
Photographic Documentation.................................................3
Submittal Procedures .............................................................6
Quality Requirements ............................................................8
References ..............................................................................2
Temporary Facilities and Controls.........................................8
Execution Requirements ........................................................6
Cutting and Patching..............................................................4
Closeout Procedures...............................................................8
Division 2 Sitework
02000
02100
02110
02200
02230
02510
02700
02713
02730
02831
02900
02900
Erosion Control ......................................................................4
As-Built Survey .....................................................................2
Site Clearing and Demolition.................................................5
Earthwork ...............................................................................12
Asphaltic Concrete Pavement ................................................15
Portland Cement Concrete Paving .........................................6
Storm Sewer...........................................................................10
Water System .........................................................................10
Sanitary Sewerage..................................................................8
Fencing ...................................................................................4
Lawns, Grassing and Landscaping ........................................10
Planting Irrigation ..................................................................15
24-006
TABLE OF CONTENTS
1
TABLE OF CONTENTS
RENOVATIONS TO AL ROLLINS PARK
Division 3 Concrete
Division 4 Masonry
Division 5 Metals
Division 6 Wood and Plastics
Division 7 Thermal and Moisture Protection
Division 8 Doors and Windows
Division 9 Finishes
Division 10 Specialties
Division 11 Equipment
Division 12 Furnishings
Division 13 Special Construction
13340
Sectional Precast Concrete Building......................................8
Division 14 Conveying Systems
Division 15 Mechanical
Division 16 Electrical
24-006
TABLE OF CONTENTS
2
SECTION 00010 - REQUEST FOR PROPOSALS
THE CITY OF DALTON (the “City”), pursuant to the provisions of O.C.G.A. § 36-91-1, et. seq., herein
seeks competitive Proposals from contractors for the construction of: “Renovations to Al Rollins Park”,
located at 521 Threadmill Rd, Dalton, GA 30720 (the “Project”).
In general, the project includes re-grading of the existing baseball fields, installation and upkeep of soil
and erosion control measures, irrigation, new sod, new in-field material, fencing, new pre-cast restroom
building and all other materials & labor required for a complete project. The requirements for
construction of the Project, and the duties and responsibilities of the contractor whose Proposal is
accepted (“Successful Contractor”), are set forth in the Contract Documents which include the
Instructions to Proposers; the Contract for Construction and Incorporated General Conditions (the
“Contract”); any supplementary and other conditions; the drawings; the specifications; and any addenda
issued by the Architect.
Any contractor submitting a Proposals must register with the City’s Vender Registry and download
complete set of the Contract Documents.
Vender Registry is posted here: https://www.daltonga.gov/finance/page/vendor-packets .
Open Solicitations are posted here: https://www.daltonga.gov/rfps .
The Contractor is solely responsible for obtaining any addenda or further correspondence from the
procurement website for this solicitation.
All documents are available for inspection by the public at the Architect’s office at 855 Abutment Road
Suite 4 Dalton, GA 30721. The Contract Documents require, among other things, the furnishing of all
materials, labor, and equipment for construction of the Project. The City reserves the right to make
available other relevant documents or information concerning the Project.
Any Contractor who intends to submit a Proposal is required to attend a Pre-Proposal Meeting,
which will be held on the 27th day of January 2026, at 2:00 p.m. at the project site. Any contractor
arriving more than 5 minutes late will not be permitted to attend.
A Proposal must strictly comply with all requirements set forth in the Instructions to Proposers. A
Proposal must contain the completed Proposal Form which sets forth the Contractor’s proposed lump sum
contract price for full and complete construction of the Project in conformity with all requirements of the
Contract Documents. A Proposal must also include the Contractor’s responses to all questions, and a
fully executed Bid Bond in the amount of five percent (5%) of the proposed lump sum contract price
(exclusive of any alternates and unit prices) in the form required by the Instructions to Proposers and a
completed E-Verify form.
Any contractor who intends to submit a Proposal is required to visit the Project Site and familiarize itself
with the local conditions under which the required work is to be performed and include in its lump sum
cost all necessary expenses required to perform and complete the Project.
In evaluating Proposals, the City may seek additional information from any contractor concerning such
contractor’s Proposal or its qualifications to construct the Project.
The City intends to award the construction contract to the responsible and responsive contractor whose
Proposal is determined in writing to be the most advantageous to the City, take into consideration the
following evaluation factors which are listed below:
12/1/2025
24-006
00010-1
A. General Background / Firm History (5 Points)
B. Financial Status and Bonding (5 Points)
C. Proposed Project Personnel (15 Points)
D. Company Experience (30 Points)
E. Legal Proceedings (5 Points)
F. The Contractor’s proposed lump sum fee (35 Points).
G. The completeness and accuracy of proposal. (5 Points)
Sealed proposals will be received by the City of Dalton Finance Department located at 300 W.
Waugh Street, Dalton, Georgia 30720 until: 2:00 p.m. on the 11th day of February 2026. All
proposals must be sealed and plainly marked “Renovations to Al Rollins Park”. A total of 2 proposals in
bound notebooks are required. Please tab each section/form individually. Any Proposal received after said
time will not be accepted. At the discretion of the City and in conformity with the applicable laws of the
State of Georgia, the City may afford contractors an opportunity for subsequent discussion, negotiation,
and revision of Proposals. The City reserves the right to reject any or all Proposals and to waive any
technicalities or formalities.
Any proposal must include an executed E-Verity Affidavit, Exhibit I. Proposals not including executed E-
verify affidavit will be automatically rejected.
Each Contractor is responsible for ensuring its Proposal complies with Georgia law, including but not
limited to all state and local laws, rules, regulations, ordinances, and policies. Each Proposal must
include an affidavit meeting all requirements of O.C.G.A. § 13-10-91, verifying compliance with
applicable Federal work authorization program. The form for such affidavit is attached as an exhibit to the
Instructions to Proposers.
Contractors understand and agree that the Proposal it submits to the City for consideration shall remain
open for acceptance by the City and same shall be honored by the contractor, for a period of sixty (60)
days from the date set forth hereinabove for the receipt of Proposals.
Contractor must have minimum Worker’s Compensation and General Liability Insurance in full force and
effect and submit evidence of such insurance policy to the satisfaction of the City. The City will not
consider any Proposal that is not accompanied by satisfactory evidence that the contractor holds any and
all necessary or required Federal, State, or local licenses and/or permits. The City’s acceptance of any
such evidence of the applicable insurance policy or licenses or permits does not alter or change a
contractor’s responsibility to comply with such specifications. Pursuant to O.C.G.A. § 13-10-91, all
contractors and sub-contractors performing work within the State of Georgia in accordance with or related
to a contract with a public employer must register and participate in a federal work authorization program.
The contractor shall provide certification of such registration and participation in a Federal work
authorization program to the City. Each contractor shall submit with its Proposal a copy of its current
Business License and/or Occupational Tax Certificate issued in the state in which the Contractor resides.
If a contractor cannot provide such license, it will be required to obtain one from the City of Dalton /
Whitfield County if it is awarded the construction contract for the Project.
End Request for Proposals
12/1/2025
24-006
00010-2
This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

...of black vinyl coated chain link fence, sod, bleachers, Custom overhead tie back ...

State Government of Georgia

Bid Due: 6/11/2026

...Sod, Grass 02262 Irrigation System Parts, Agricultural BuyerContact: Jana Flanigan purchasing@paulding.k12.ga.us 7704438000...

State Government of Georgia

Bid Due: 6/17/2026

...Anhydrous Ammonia 74565 Patching Mix, Asphalt Concrete 75033 Concrete, Repair, Rapid Setting 79050 ...

State Government of Georgia

Bid Due: 6/16/2026

...been disturbed from previous repairs will be regraded and have sod applied to ...

DEPT OF DEFENSE

Bid Due: 7/07/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.