| Location: | Oklahoma |
|---|---|
| Posted: | Apr 17, 2025 |
| Due: | May 13, 2025 |
| Agency: | TRANSPORTATION, DEPARTMENT OF |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | 6982AF25B000005 |
| Publication URL: | To access bid details, please log in. |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
PROJECT NUMBER: OK ERFO NP CHIC 2024-1(1)
PROJECT NAME: Veterans Lake Trail Bridge
PROJECT DESCRIPTION:
The project is located along Veterans Lake Trail within the Chickasaw (CHIC) National Recreation Area (NRA) in Murray County, Oklahoma. The proposed improvement is to replace a pedestrian trail bridge that was removed by a tornado April 2024. The existing bridge has been found in Veterans Lake and will need to be removed as well. The existing abutments are intact; however, some of the anchor bolts are bent and the south abutment is cracked.
SCOPE OF THE WORK:
Constructing the new bridge includes repairing the existing abutments that would be reused to support the replacement bridge, repairing the minor masonry structure, and installing an approximately 130-foot-long and 6-foot-wide prefabricated pedestrian bridge. The replacement bridge would be a prefabricated steel truss bridge with a timber deck, similar in appearance to the original structure. Construction staging would occur at the existing parking lot at the north end of the dam and access provided via the existing trail.
Removal of the existing bridge from Veterans Lake would likely involve floating the structure to the parking lots on the east side of the lake and lifting it via crane. The bridge would then be appropriately disposed of. Two parking lots would be utilized as staging areas and provide access for the bridge removal process.
It is anticipated this project will be under construction in the Summer of 2025. The project has an estimated completion date of June 2026.
Due to weather, no onsite work is to occur from early March to early May.
| Mar 27, 2025 | [Presolicitation (Original)] OK ERFO NP CHIC 2024-1(1) Veterans Lake Trail Bridge |
| Apr 11, 2025 | [Solicitation (Updated)] OK ERFO NP CHIC 2024-1(1) Veterans Lake Trail Bridge |
| Apr 18, 2025 | [Solicitation (Updated)] OK ERFO NP CHIC 2024-1(1) Veterans Lake Trail Bridge |
| Apr 22, 2025 | [Solicitation (Updated)] OK ERFO NP CHIC 2024-1(1) Veterans Lake Trail Bridge |
| May 5, 2025 | [Solicitation (Updated)] OK ERFO NP CHIC 2024-1(1) Veterans Lake Trail Bridge |
| May 9, 2025 | [Solicitation (Updated)] OK ERFO NP CHIC 2024-1(1) Veterans Lake Trail Bridge |
| May 14, 2025 | [Solicitation (Updated)] OK ERFO NP CHIC 2024-1(1) Veterans Lake Trail Bridge |

With GovernmentContracts, you can:
Solicitation No. Solicitation Contact Opening Date/Time Status Award OS-1829900-JDT Bond Underwriter Services Joe
Oklahoma State University
Bid Due: 11/12/2048
Follow REPAIR TAXIWAY A, Phase 1 and Phase 2 (Option) both Unfunded Active
DEPT OF DEFENSE
Bid Due: 6/23/2026
Follow TINKER AFB MAC BOA WWYK250013 - Renovate to Open Storage B1115 Active
DEPT OF DEFENSE
Bid Due: 6/17/2026
Procurement #164562 Title Call for Art- Wilma P. Mankiller Capitol Park Statue Status
Cherokee Nation
Bid Due: 7/02/2026