Parking Photovoltaics (PV) Solar Project (PM 672)

Location: California
Posted: Nov 24, 2024
Due: Jan 8, 2025
Agency: State Government of California
Type of Government: State & Local
Category:
  • 61 - Electric Wire, and Power and Distribution Equipment
  • Y - Construction of Structures and Facilities
Solicitation No: 7033
Publication URL: To access bid details, please log in.

Parking Photovoltaics (PV) Solar Project (PM 672)Details

Event ID
7033

Format/Type:
Sell Event / RFx

Published Date
11/22/2024  3:49PM PST

Dept:
CSU, San Diego

Event Version
1

Event End Date:
01/08/2025  2:00PM PST

Description:

The State of California, acting through the Board of Trustees of The California State University, hereinafter called Trustees, on behalf of San Diego State University, hereinafter called University, is requesting Statements of Qualifications (SOQ) from interested and qualified Design-Builders (Respondents) to provide design, preconstruction and design-build construction services for the project referenced above (Project).

The delivery method for this Project is a modified form of the Trustees¿ Design-Build process, called Collaborative Design-Build. This is a two-phased project delivery process: Phase 1-Design and Preconstruction Services to define the Project, hereinafter referred to as Phase 1, and Phase 2-Design-Build Construction Services to complete the design and construct the Project, hereinafter referred to as Phase 2. There will be separate agreements for each phase. This modified process selects the Design-Builder on qualifications and proposed fees (a design competition is not utilized).

During Phase 1 the University will issue a design and preconstruction services agreement, under which the Design-Builder will: complete the programming; develop the schematic design; commit to a guaranteed maximum price (GMP) and schedule; start Design Development; confirm other criteria are appropriate; and obtain CSU Board of Trustees (BOT) approval. Upon receipt of both the BOT approval of the schematic design and the University¿s authorization to proceed, Design-Builder shall: continue with the design development; publish a set of the Design-Build Construction Documents; and establish and submit a GMP to the Trustees. Plans will be reviewed and permitted by the CSU Office of Fire Safety.

During Phase 2 the University will issue a GMP collaborative design-build agreement incorporating: the Design-Build Contract Documents; updated criteria; direct construction cost budget; GMP; contingency; remaining design fees; site management fees; payment and performance bond premiums; overhead and profit; and schedule as agreed upon in Phase 1.

The Trustees are not obligated to proceed with Phase 2 with the selected Design-Builder. The Design-Builder is not obligated to proceed with Phase 2 if it so determines that the budget is not adequate, or for other business reasons. Phase 1 work products and electronic files of the Design-Builder are the property of the Trustees. In the event the Trustees and Design-Builder do not continue into Phase 2, these documents will be used by the University in any manner, including use as bridging documents for subsequent contracts.

San Diego State University is also considering the following financial procurement option that could have an impact on the final contracting methods. This option is outlined below:
1. A pre-paid power purchase agreement (PPA), pre-paid lease, pre-paid service contract, or a similar arrangement to obtain the cost reduction benefit of the IRA tax incentives. In this option, the third-party owner would construct the project subject to the requirements and inspections required by the University. The University is also interested in investigating the option of the third-party owner providing a lender to fund the pre-paid power purchase agreement (PPA) pre-paid lease, pre-paid service contract, or similar agreement.

UNSPSC Codes
UNSPSC Classification
UNSPSC Classification Description
72153700 Special trade construction & maint srvcs - Parking facility construction equip install maint & repair
Contact InformationSusan Romero
Phone :

Email: sbromero@sdsu.edu sbromero@sdsu.edu
Pre Bid Conference (N/A)
Mandatory :
Non Mandatory
Date :

Time :

Location :

Comments :

Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

...("Project") and that the County has determined that all Design-Build Entities ("Design-Builders") must... ...

Contra Costa County

Bid Due: 7/02/2026

...Design-Builder will be obligated to collaborate with the SFPUC on defining and procuring ...

San Francisco Public Utilities Commission

Bid Due: 12/31/2099

...of Pasadena is seeking the services of a qualified design-build contractor ("Design-Builder" or ...

City of Pasadena

Bid Due: 6/18/2026

...of the Project. The selection process for the Design-Builder for this Project will ...

City and County of San Francisco

Bid Due: 6/22/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.