| Location: | Hawaii |
|---|---|
| Posted: | Mar 16, 2026 |
| Due: | Mar 20, 2026 |
| Agency: | General Contractors Association |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
Project Description: Work generally consists of replacement of the existing natural grass field and dirt track with a new synthetic turf field and all-weather track which includes grading, excavation, installation of asphalt concrete pavement and synthetic track surface, crushed rock base, synthetic turf, subdrains, fencing, concrete sidewalk, electrical conduits, tree pruning, and other related work.
| Download |
|
Plans
Specifications
|
Addendums/Amendments
Addend No. 6 Plans Aiea HS Q71108-23.pdf
|

With GovernmentContracts, you can:
...SCHOOL SAFETY IMPROVEMENTS INCLUDING FENCING FOR COVERED GYM [BID DATE CHANGED FROM 6/3/2026] ...
General Contractors Association
Bid Due: 6/08/2026
...) Invasive Species Fencing; (26) Educational Outreach; and (27) Fire Management Plan; (28) ...
DEPT OF DEFENSE
Bid Due: 8/28/2026