| Location: | Hawaii |
|---|---|
| Posted: | Mar 16, 2026 |
| Due: | Apr 14, 2026 |
| Agency: | General Contractors Association |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
Project Description: This project involves a one-for-one replacement of two (2) existing air handling units in Wentworth Hall and three (3) existing air handling units in Marine Science Building, and removal and reinstallation of existing water heater and hot water storage tank in Marine Science Building. Additionally, ductwork and chilled water piping insulation throughout Wentworth Hall will be replaced. This work shall generally include selective demolition, structural steels, siding, firestopping, sealants, gypsum wallboard, acoustic ceiling tile, painting, louver, fire alarm system hardwired, general mechanical requirements, mechanical sound, vibration, and seismic control, mechanical insulation, chilled water piping, plumbing, air handling equipment, ductwork and accessories, direct digital control system, hvac testing/adjusting/balancing, electrical general requirements, wiring systems and interior lighting.
| Download |
|
Plans
Specifications
|
Addendums/Amendments
B2026000043 - Addendum No. 1.pdf
|

With GovernmentContracts, you can:
..., Hawaii. Water within the walls of a fuel storage tank can lead ...
DEPT OF DEFENSE
Bid Due: 6/12/2026
...on Kauai, Hawaii. Water within the walls of a fuel storage tank can ...
DEPT OF DEFENSE
Bid Due: 6/12/2026
..., Compensation, and Liability Act (CERCLA), Resource Conservation and Recovery Act (RCRA), Underground ...
DEPT OF DEFENSE
Bid Due: 6/22/2026
...for power and communications. Utilities: Necessary utility infrastructure hookups including water, sanitary... as ...
DEPT OF DEFENSE
Bid Due: 7/06/2026