Addendum #2 BDC07-25/26 Office of Resilience & Coastal Protection-SE Region Quayside Dock Shoreline

Location: Florida
Posted: Nov 9, 2025
Due: Nov 19, 2025
Agency: State Government of Florida
Type of Government: State & Local
Category:
  • H - Quality Control, Testing, and Inspection Services
  • Z - Maintenance, Repair or Alteration of Real Property
Solicitation No: ITB-14296
Publication URL: To access bid details, please log in.
Invitation to Bid Addendum #2 BDC07-25/26 Office of Resilience & Coastal Protection-SE Region Quayside Dock Shoreline Department of Environmental Protection (DEP)
Advertisement Status: OPEN
Last Edit Date/Time: 11/07/2025, 10:56 PM
Advertisement Number: ITB-14296
Agency Advertisement Number: BDC07-25/26
Version Number: 1
Published Date/Time: 11/07/2025 10:56 PM
Start Date/Time: 11/07/2025 10:56 PM
End Date/Time:  11/19/2025 05:30 AM
Commodity Codes
Code Description
72141200 Marine construction services
72141204 Dock construction service
72141211 Pier construction service
72152300 Carpentry services

November 7, 2025

NOTICE TO APPLICANTS

ADDENDUM NO. TWO (2)

DEP- Office of Resilience & Coastal Protection - SE Region – Quayside Dock Shoreline Stabilization

DEP BID NO. BDC07-25/26

TO BIDDERS AND PLAN HOLDERS ON THE ABOVE REFERENCED PROJECT: PLEASE NOTE CONTENTS HEREIN AND INCLUDE, SIGNED, WITH YOUR BID SUBMISSION.

NOTICE

It will be required that this addendum be signed in acknowledgment of receipt and that it be included with your Bid when same is submitted to Alisha Sadler, Contracts Specialist, Bureau of Design and Construction, 3800 Commonwealth Blvd., MS #520, Tallahassee, Florida, 32399-3000. Failure to do so may be grounds for rejection of the Bid.

_______________________________________

Signature of Contractor and Date

The following statements supersede & supplement the corresponding items in the specifications & drawings:

  1. Question:  Fixed Dock and Gangway Connection
    No section detail is provided for the joint between the fixed dock and the gangway.
    By code, an inclined gangway must maintain continuous handrails within the level area, which requires the gangway to be narrower—allowing at least 6 in per side (1 ft total) for clearance between railings to avoid collision or hand entrapment.
    ?? Please clarify how the handrail connection will be handled and whether the width of either element will be adjusted to provide the required 1 ft difference.

Answer: Gangway is a submittal item in the project plans. Contractor to submit shop drawings for approval

  1. Question:   Floating Dock Stability
    The gangway transfers approximately 650–800 lb to the floating dock. Because this load is offset about 1 ft from the edge, it will create a torsional moment that tends to tilt the float and overstress the pile guides.
    ?? Please clarify how this unbalanced loading condition will be prevented, and whether the gangway landing will be centered on the float.

Answer: Floating dock and gangway are submittal items in the project plans. If a compensation float is required for the gangway or floating dock submitted by the Contractor, item is to be included in the submittal.

  1. Question:   Transition Plate and Access Area
    A transition plate (typically 4–5 ft long) is required and must include guardrails.
    With only a 5 ft wide float and an off-center gangway, the remaining flat walk surface is less than 1 ft wide, which is not code-compliant nor safe.
    ?? Please clarify the intended transition-plate length and landing configuration ensuring safe, ADA-compliant access.

Answer: Floating dock and gangway are submittal items in the project plans. If a compensation float is required for the gangway or floating dock submitted by the Contractor, item is to be included in the submittal.

In all other respects, the contract documents of which this is an Addendum, and attachments relative thereto, shall remain in full force and effect.

Please direct all questions to:
Name: Alisha Sadler
Phone: (850) 245-3127
Address: 3900 Commonwealth Blvd. MS#520 Tallahassee, FL 32399-3000
Email: Alisha.Sadler@FloridaDEP.gov
Click here to view the original advertisement
Description Date/Time
Addendum #2: Office of Resilience & Coastal Protection - SE Region -Quayside Dock Shoreline Nov 7, 2025, 10:55:56 PM
For questions on a specific advertisement, contact the agency advertisement owner. Advertisements include the contact information for the agency advertisement. The agency advertisement owner is the point of contact for vendors with specific questions.
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

...Advertisement Detail Department of Transportation Agency Decisions Purchase of Portable Wheel Load...

State Government of Florida

Bid Due: 10/11/2090

...Controller Assemblies - Type 5 (16 Load Bay) - Base Mounted Three (3) ...

State Government of Florida

Bid Due: 10/11/2050

...EDT Project Description: The City of Tallahassee requires battery load testing for the ...

City of Tallahassee

Bid Due: 6/16/2026

...Project Description: The City of Tallahassee requires battery load testing for the electric...

City of Tallahassee

Bid Due: 6/16/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.