| Location: | Illinois |
|---|---|
| Posted: | Aug 12, 2026 |
| Due: | Aug 25, 2026 |
| Agency: | DEPT OF DEFENSE |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | W91SMC26QA016 |
| Publication URL: | To access bid details, please log in. |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
*Edit 8/12/26 - added Slides and Minutes from Pre-Quote Conference and Site Visit.*
The 183d Wing (183WG) at the Abraham Lincoln Capital Airport, Air National Guard Base, Springfield, IL, has a requirement for a firm-fixed-price construction contract to upgrade the Uninterrupted Power Supply (UPS) system in Building 8.
SITE VISIT - 11 AUG 2026 @ 1300.
The contractor shall provide all personnel, equipment, supplies, transportation, tools, materials, supervision, and non-personal services necessary to remove the existing 10 kW UPS system and install a new scalable 20 kW UPS system.
Key scope items include:
Period of Performance: 120 days or less after issuance of Notice to Proceed (NTP).
See Solicitation for additional information.
| Jul 27, 2026 | [Solicitation (Original)] CES Expansion UPS Upgrade |

With GovernmentContracts, you can:
...Welding (NG SEW): Channel Strut, NEMA 4 SINGLE DOOR ENCLOSURE, Circuit Breaker Load ...
DEPT OF DEFENSE
Bid Due: 7/07/2027
...Breaker Load Center, Flexible Conduit, Electrical Cable Attachments/Links Contact Information...
DEPT OF DEFENSE
Bid Due: 7/22/2027
...the ability to serve existing and future loads. The General contractor shall furnish ...
ENERGY, DEPARTMENT OF
Bid Due: 11/17/2026