Project Description: This work involves the removal of the existing culvert and fabrication and installation of a new precast concrete box culvert with precast wingwalls. The project also includes approach roadway work following the existing alignment and re-establishment of the superelevation, erosion and sediment controls, pavement markings, scour protection and guide rail. Vehicular and pedestrian traffic will be detoured to construct this project.

With GovernmentContracts, you can:
...on the plans. Work also includes the following: excavation, turf matting/erosion control blanket... ...
PennBid
Bid Due: 8/03/2026
...erosion control, demolition, grading, soil compaction, trash/material removal, and local permitting...
PennBid
Bid Due: 8/13/2026
...RESOURCES SILVICULTURE SECTION EROSION SEDIMENT CONTROL The Erosion and Sediment Control Plan... of ...
State Government of Pennsylvania
Bid Due: 8/07/2026
...work included soil erosion and sediment control measures, pavement, rock stabilization methods...
PennBid
Bid Due: 8/24/2026