| Location: | Connecticut |
|---|---|
| Posted: | Jul 15, 2026 |
| Due: | Aug 3, 2026 |
| Agency: | State Government of Connecticut |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 37994 |
| Publication URL: | To access bid details, please log in. |
Silicone Dioxide
The Town of Killingly, Connecticut (“Town”) invites sealed proposals from qualified contractors to provide Silicon Dioxide Defoamer, Delivery, located at Killingly Water Pollution Control Facility (“KWPCF”). The goal of this contract is to ensure reliable operation, compliance with safety standards, and minimal downtime. The KWPCF typically consumes approximately 12 – 55-gallon barrels of Silicon Dioxide Defoamer annually, with deliveries generally received in quantities of 2 barrels (110 gallons) per shipment. Actual usage and delivery frequency may vary depending on operational conditions.
Town of Killingly / WPCF 31 Wauregan Rd Killingly CT, 06239 United States Tel: 8607795392 wpcf@killinglyct.gov

With GovernmentContracts, you can:
Window Replacement Services Addendum #1 Addendum #2
Town of Plainfield
Bid Due: 11/10/2026
TMP2026-2 Embankment Wall Replacement - Lowe Street This solicitation is being posted to
State Government of Connecticut
Bid Due: 11/17/2026
NUMBER TITLE STATUS BID TYPE NAME CONTACT INFORMATION AVAILABLE DATE CLARIFICATION DEADLINE DUE
Regional Water Authority
Bid Due: 11/12/2026
Description Opening Date/Time Closing Date/Time IFB #2026-116 Monitoring, Inspection, Testing, Maintenance and Repair
Hartford Housing Authority
Bid Due: 11/12/2026