| Location: | Michigan |
|---|---|
| Posted: | Mar 11, 2026 |
| Due: | Mar 26, 2026 |
| Agency: | City of Kalamazoo |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
Closing date
March 26, 2026, 03:00 PM
91244-050.0-bid document (PDF, 65MB)
91244-050.0-distribution list (PDF, 62KB)
91244-050.0-drawings (PDF, 31MB)
91244-050.0-permits (PDF, 23MB)
91244-050.0-special provisions (PDF, 5MB)
91244-050.0-specifications (PDF, 4MB)
SCOPE OF WORK
IMPROVEMENTS TO THE WATER MAIN, SANITARY SEWER, STORM SEWER, AND STREET. INCLUDES THE INSTALLATION OF 16-INCH AND 24-INCH WATER MAIN; ABANDONMENT OF OLD WATER MAIN; RECONNECTING WATER MAIN ON SIDE STREETS; RECONNECTING WATER SERVICES INCLUDING POSSIBLE LEAD SERVICE REPLACEMENT; INSTALLATION OF 2-WAY SEWER CLEANOUTS; LIMITED SANITARY SEWER REPLACEMENT; STORM SEWER WORK TO ACCOMMODATE WATER MAIN; ADA SIDEWALK RAMPS; SPOT CURB & GUTTER, DRIVEWAY, AND SIDEWALK REPLACEMENT AS NEEDED; HMA PAVING; PAVEMENT MARKINGS.
Work shall start within 10 working days after receipt of notification by Contractor of Notice to Proceed, and final completion shall be March 28, 2027.

With GovernmentContracts, you can:
...Sewer Lining Project RFP 26-52 Megan Seay Open PUBLIC IMPROVEMENT REQUEST FOR PROPOSAL ...
City of Ann Arbor
Bid Due: 12/02/2026
...Project: Rehabilitation of the 7-Mile Sewer System Ref. #: REQ-0011642 Type: RFB Status: ...
Great Lakes Water Authority
Bid Due: 1/15/2027
...Storm Sewer Cleaning and CCTV Investigation Map Set of work locations Storm Sewer ...
City of St. Clair Shores
Bid Due: 11/24/2026
...Sanitary Sewer Jetting RFP (Due December 8, 2026 at 10:00AM) The Charter Township ...
Township of Brighton
Bid Due: 12/08/2026