| Location: | Michigan |
|---|---|
| Posted: | Mar 11, 2026 |
| Due: | Mar 26, 2026 |
| Agency: | City of Kalamazoo |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
Closing date
March 26, 2026, 03:00 PM
91244-050.0-bid document (PDF, 65MB)
91244-050.0-distribution list (PDF, 62KB)
91244-050.0-drawings (PDF, 31MB)
91244-050.0-permits (PDF, 23MB)
91244-050.0-special provisions (PDF, 5MB)
91244-050.0-specifications (PDF, 4MB)
SCOPE OF WORK
IMPROVEMENTS TO THE WATER MAIN, SANITARY SEWER, STORM SEWER, AND STREET. INCLUDES THE INSTALLATION OF 16-INCH AND 24-INCH WATER MAIN; ABANDONMENT OF OLD WATER MAIN; RECONNECTING WATER MAIN ON SIDE STREETS; RECONNECTING WATER SERVICES INCLUDING POSSIBLE LEAD SERVICE REPLACEMENT; INSTALLATION OF 2-WAY SEWER CLEANOUTS; LIMITED SANITARY SEWER REPLACEMENT; STORM SEWER WORK TO ACCOMMODATE WATER MAIN; ADA SIDEWALK RAMPS; SPOT CURB & GUTTER, DRIVEWAY, AND SIDEWALK REPLACEMENT AS NEEDED; HMA PAVING; PAVEMENT MARKINGS.
Work shall start within 10 working days after receipt of notification by Contractor of Notice to Proceed, and final completion shall be March 28, 2027.

With GovernmentContracts, you can:
..., as well as replacement of the existing dual 18-inch cast iron and ...
Adrian city
Bid Due: 6/23/2026
...: Information Technology Services BID 201 Main Street/PO BOX 499 East Jordan, MI ...
City of East Jordan
Bid Due: 7/02/2026