| Location: | Connecticut |
|---|---|
| Posted: | Sep 3, 2026 |
| Due: | Sep 30, 2026 |
| Agency: | State Government of Connecticut |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 27-23 |
| Publication URL: | To access bid details, please log in. |
Route 82 Water Main Lining
Project Description The work required under this contract includes but is not limited to the following: 1. Furnishing, installing, and maintaining all barricades, signing, and maintenance and protection of traffic measures as required to perform the work. 2. Furnish and install new insertion valves. 3. Furnish and install new water main lining, and appurtenances. 4. Excavate and support all excavations as required and in accordance with OSHA regulations. 5. All surface restoration, including the roadway pavement (temporary, permanent, and mill & overlay), curbs, sidewalks, pavement markings, and lawn re-establishment.
Karl Klein 100 Broadway NORWICH CT, 06360 United States Tel: 8608233706 Fax: kklein@cityofnorwich.org

With GovernmentContracts, you can:
...of the replacement and upgrade of the existing fire protection water main and ...
DEPT OF DEFENSE
Bid Due: 11/06/2026
...approximately 2,060-feet of inch ductile iron water main via open trench; hanging approximately ...
State Government of Connecticut
Bid Due: 11/06/2026
...Platt & Lincoln Wells Rehabilitation The City of Meriden's DPU-Water Department is seeking... ...
State Government of Connecticut
Bid Due: 11/20/2026
...Water Pollution Control Authority Environmental Studies The Old Saybrook CT Water Pollution... Jr. ...
State Government of Connecticut
Bid Due: 11/23/2026