MUO Geothermal Plant Expansions

Location: Ohio
Posted: Feb 18, 2026
Due: Mar 13, 2026
Agency: Ohio Facility Construction Commission
Type of Government: State & Local
Category:
  • B - Special Studies and Analyses - Not R&D
Solicitation No: MUN-260170
Publication URL: To access bid details, please log in.
Publish Date Due Date Number Owner Contractring Authority Project Name Primary Service Estimated Project Cost Q&A Short List Notes
2026/02/18 2026/03/13 MUN-260170 Miami University OFCC MUO Geothermal Plant Expansions A/E $30,000,000 N/A TBD

Attachment Preview

Request for Qualifications (Architect / Engineer)
State of Ohio Standard Forms and Documents
Administration of Project: Local Higher Education
Project Name MUO Geothermal Plant Expansions
Project Location Miami University
City / County Oxford / Butler County
Owner
Miami University
Delivery Method CM at Risk
No. of paper copies requested (stapled, not bound)
3
Response Deadline March 13, 2026 2:00 PM local time
Project Number
MUN-260170
Project Manager
Don Van Winkle
Contracting Authority Local Higher Education
Prevailing Wages State
No. of electronic copies requested (PDF)
1
Submit the requested number of Statements of Qualifications (Form F110-330) directly to Don Van Winkle at Physical
Facilities, 101 S Fisher Dr, Oxford, OH 45056 or at vanwind3@miamioh.edu. See Section J of this RFQ for additional
submittal instructions.
Submit all questions regarding this RFQ in writing to Don Van Winkle at vanwind3@miamioh.edu with the project number
included in the subject line (no phone calls please). Questions will be answered and posted to the Opportunities page on the
OFCC website at http://ofcc.ohio.gov on a regular basis until one week before the response deadline. The name of the party
submitting a question will not be included on the Q&A document.
Project Overview
A. Project Description
Miami University is soliciting qualifications for professional engineering services. Miami University has developed a Utility
Master Plan that has, at its core, the migration from Steam/Condensate infrastructure to a Heating Hot Water system, and
expanded use of geothermal systems. The next phase of the Utility Master Plan consists of increasing the number of
buildings served by our Geothermal Plants – both the Geothermal Energy Plant (GEP) located on Miami University’s
Western Campus, and the Northern Geothermal Plant (NCP).
District Hot Water and Chilled Water service from the GEP will be extended to Boyd Hall and Kumler Chapel. Additionally,
the HW and CHW service from the GEP will be extended to the Hoyt Hall site, where those systems will be connected to
existing buried valves, below the parking lot, to complete the loop and add redundancy and resiliency to the system.
District Hot Water service from the NCP will be extended to Psychology Building and Farmer School of Business.
Additionally, the HW and CHW service from the NCP will be extended from the utility tunnel at the corner of Hight St and
Patterson Ave to Cook Field, in anticipation of a future arena, and also across OH Rt 73 to a vault that will tie into the
utility tunnel in front of Bachelor Hall.
Along with extending piping distribution changes, each of the (4) buildings will require modifications to be able to utilize
the Low Temperature HW and CHW provided by the GEP, and Low Temperature HW from the NCP. These modifications
range from pulling out existing HW and CHW generating equipment and connecting the systems up to the district HW and
CHW loops, to installing completely new heating and cooling systems.
Additionally, within Psychology building, the process chillers serving aquatics research area are at end of life and will be
replaced as part of this project, as will the steam fired domestic hot water heaters, and a stand alone steam boiler will be
installed at the building to support existing steam use needs from autoclave and cage washing equipment.
Coordination of shutdown and startup of systems will be critical for a smooth transition, and to not disrupt the educational
calendar.
B. Scope of Services
This Request For Qualifications (RFQ) is for an Engineering Firm. The required engineering services include, but are not
limited to the following:
1. Programming
Verification of programming will be required for overall plan and a detailed programming on how each building will be
modified upon award of the Agreement, commence by developing the Program of Requirements.
2. Distribution Design
F110-02-2022-MAR
Publish Date: 2/18/2026
Page 1 of 5
Request for Qualifications (Architect / Engineer) continued
An assessment of how to best install CHW and HW piping through the tunnel system, while maintaining the existing
Steam/Condensate mains that serve other parts of campus, as well as best method for tying into the existing tunnels
with the new utilities shall be performed as part of this design. There is a combination of direct buried and tunnel
piping this area. Many of the existing steam and condensate lines have asbestos insulation and lines designated for
removal may need to be abated.
3. Building Level Conversions
Each of the buildings has their unique challenges to convert from steam over to heating hot water and chilled water.
Systems that need converted to district Low Temp HW or CHW are the following:
Boyd Hall:
Kumler Chapel:
Farmer School of Business:
Psychology Building:
Steam Reheat coils in attic AHUs, Perimeter finned tube, Standalone Chiller
Steam Radiators, Steam Heating Coil, DX Cooling Coil
HW Coils in AHUs, Perimeter finned tube
Domestic HW heaters, steam coils in air handlers, steam generation for cage
wash and autoclaves, replace process chiller.
The design for each of these building conversions will need to look at the existing pump systems. New pumps with VFDs
will need to be added where systems do not have adequate pumping capacity currently.
The selected A/E, as a portion of its required Scope of Services and prior to submitting its proposals, will discuss and
clarify with the Owner and/or the Contracting Authority, the cost breakdown of the Architect/Engineer Agreement detailed
cost components to address the Owner’s project requirements. Participate in the Encouraging Diversity, Growth& Equity
(EDGE) Program as required by statute and the Agreement.
As required by the Agreement, and as properly authorized, provide the following categories of services: Program
Verification, Schematic Design, Design Development, Construction Document Preparation, Bid and Award Support,
Conformed Documents, Construction Administration, Post-Construction, and Additional Services of all types.
Refer to the Ohio Facilities Construction Manual for additional information about the type and extent of services required
for each. A copy of the standard Agreement can be obtained at the OFCC website at https://ofcc.ohio.gov.
During the construction period, provide not less than 6 hours (excluding travel time) on-site construction administration
services each week, including (1) attendance at progress meetings, (2) a written field report of each site visit, (3) on-site
representation comprised of the A/E and its consultant staff involved in the primary design of the project, all having
relevant and appropriate types of construction administration experience.
For purposes of completing the Relevant Project Experience Matrix in Section F of the Statement of Qualifications (Form
F110-330), below is a list of relevant scope of work requirements for this RFQ:
1. Primary/Secondary Pumping
2. Distribution Piping (Heating Hot Water & Chilled Water)
3. MEP Systems related to the following:
Chilled Water
Heating Hot Water
4-Pipe Fan Coil Units
Plate and Frame Heat Exchangers
Steam
4. Bidding State Contract Work
5. BAS / Siemens Control experience
6. Architecture
7. 3D BIM Modeling
8. State of Ohio Contracting Experience
9. Construction Administration
10. Phasing / Implementation Planning
F110-02-2022-MAR
Publish Date: 2/18/2026
Page 2 of 5
Request for Qualifications (Architect / Engineer)
State of Ohio Standard Forms and Documents
C. Estimated Budget / Funding
State Funding:
$0
Other Funding:
$30,000,000
Construction Cost: $25,000,000
Total Project Cost: $30,000,000
D. Anticipated Schedule
Professional Services Start:
Construction Notice to Proceed:
Substantial Completion of all Work:
Professional Services Completed:
03 / 26
12 / 26
07 / 27
09 / 27
E. Estimated Basic Fee Range (see note below)
5% to 7%
F. EDGE Participation Goal
Percent of initial Total A/E Fee:
7.0%
NOTE: Basic Services include: (1) Program Verification, (2) Schematic Design, (3) Design Development, (4) Construction Documents,
(5) Bidding and Award OR GMP Proposal and Amendment (as applicable), (6) Construction Administration, and (7) Closeout services. The
Basic Fee includes all professional design services and consultant services necessary for proper completion of the Basic Services, including
validation of existing conditions (but not subsurface or hidden conditions) and preparation of cost estimates and design schedules for the
project. The Estimated Basic Fee Range is calculated as a percentage of the Estimated Budget for Construction Cost above, including
the Owner’s contingency. The Basic Fee excludes any Additional Services required for the project.
G. Basic Service Providers Required (see note below)
Lead A/E Discipline: Engineering
Secondary
Mechanical-Electrical-Plumbing Eng.
Disciplines:
Surveying
HVAC Engineering
Structural Engineering
Civil Engineering
H. Additional Service Providers Required
Concrete Material Testing
Hazardous Material Abatement
Asphalt Testing
Soil Compaction Testing
NOTE: The lead A/E shall be (1) an architect registered pursuant to ORC Chapter 4703, (2) a landscape architect registered pursuant to ORC
Chapter 4703, or a (3) professional engineer or (4) professional surveyor licensed pursuant to ORC Chapter 4733.
I. Evaluation Criteria for Selection
Demonstrated ability to meet Owner’s programmed project vision, scope, budget, and schedule on previous
projects.
Previous experience compatible with the proposed project (e.g., type, size).
Relevant past work of prospective firm’s proposed consultants.
Past performance of prospective firm and its proposed consultants.
Qualifications and experience of individuals directly involved with the project.
Proposer’s previous experience (numbers of projects, sizes of projects) when working with its proposed
consultants.
Specification writing credentials and experience.
Experience and capabilities of creating or using Critical Path Method (CPM) schedules and of using CPM
schedules as a project management resource.
Approach to and success of using partnering and Alternative Dispute Resolution.
Proximity of prospective firms to the project site.
Proposer’s apparent resources and capacity to meet the needs of this project.
The selected A/E and all its consultants must have the capability to use the Internet within their normal business
location(s) during normal business hours.
Interested A/E firms are required to address how they will implement Building Information Modeling (“BIM”) on the project,
experience and level of training of staff related to BIM, incorporation of team partners that have previous BIM experience,
and an understanding of collaborative BIM processes, including but not limited to the State of Ohio BIM Protocol available
at the OFCC website at https://ofcc.ohio.gov.
F110-02-2022-MAR
Publish Date: 2/18/2026
Page 3 of 5
Request for Qualifications (Architect / Engineer) continued
Interested A/E firms are required to submit the Commitment to Participate in the EDGE Business Assistance Program
form in its Statement of Qualifications (Form F110-330) submitted in response to the RFQ, to indicate its intent to contract
with and use EDGE-certified Business Enterprise(s), as a part of the A/E’s team. The Intent to Contract and to Perform
and / or waiver request letter and Demonstration of Good Faith Effort form(s) with complete documentation must be
attached to the A/E’s Technical Proposal. Both forms can be accessed via the OFCC website at https://ofcc.ohio.gov. The
Intent to Contract and to Perform form is again required at the Fee Proposal stage.
If the A/E firm intends to receive points for exceeding the EDGE Participation Goal, it must provide BOTH a
completed Commitment to Participate form AND a completed Statement of Intent to Contract and to Perform forms
signed by both parties with its Statement of Qualifications.
For all Statements of Qualifications, please identify the EDGE-certified Business Enterprises, by name, which will
participate in the delivery of the proposed professional services solicited in the RFQ.
Interested A/E firms must indicate on their Statement of Qualifications, the locations where their services will be
performed in the spaces provided or by attachment in accordance with the requirements of Executive Order 2019-12D
related to providing services only within the United States and the requirements of Executive Order 2022-02D prohibiting
purchases from or investment in any Russian institution or company. Failure to do so may cause their Statement of
Qualifications to be rejected.
J. Submittal Instructions
Firms are required to submit the current version of Statement of Qualifications (Form F110-330) available via the OFCC
website at https://ofcc.ohio.gov.
Electronic submittals should be combined into one PDF file named with the project number listed on the RFQ and your
firm’s name. Use the “print” feature of Adobe Acrobat or similar software for creating a PDF rather than using a scanner. If
possible, please reduce the file size of the PDF. In Acrobat, go to Advanced, then PDF Optimizer. Also, please label the
USB Drive and the sleeve with the project number and firm name if applicable.
Paper copies of the Statement of Qualifications, if requested, should be stapled only. Do not use special bindings or
coverings of any type. Cover letters and transmittals are not necessary.
Facsimile copies of the Statement of Qualifications will not be accepted.
Statements of Qualifications must be submitted electronically by email. Submittals are limited to one email with a
maximum file size of 25 MB.
Firms are requested to identify professional registrations, memberships and credentials including: LEED GA, LEED AP,
LEED AP+, CCCA, CCM, CCS, CDT, CPE, DBIA, and any other appropriate design and construction industry credentials.
Identify that information on the resume page for individual in Block 22, Section E of the F110-330 form.
F110-02-2022-MAR
Publish Date: 2/18/2026
Page 4 of 5
Architect / Engineer Selection Rating Form
State of Ohio Standard Forms and Documents
Project Name MUO Geothermal Plant Expansions
Project Number MUN-260170
Proposer Firm
City, State, Zip
Selection Criteria
1. Primary Firm Location, Workload and Size (Maximum 10 points)
a. Proximity of firm to project site
b. Amount of fees awarded by Contracting Authority in
previous 24 months
c. Number of licensed professionals
Less than 50 miles
50 miles to 100 miles
More than 100 miles
Less than $1,000,000
$1,000,000 to $10,000,000
More than $10,000,000
Less than 10 professionals
10 to 20 professionals
More than 20 professionals
2. Primary Firm Qualifications (Maximum 30 points)
a. Project management lead
b. Project design lead
c. Technical staff
d. Construction administration staff
Experience / ability of project manager to
manage scope / budget / schedule / quality
Experience / creativity of project designer to
achieve owner’s vision and requirements
Experience / ability of technical staff to create
fully coordinated construction documents
Experience / ability of field representative to
identify and solve issues during construction
3. Key Consultant Qualifications (Maximum 20 points)
a. Key discipline leads
Experience / ability of key consultants to
perform effectively and collaboratively
b. Proposed EDGE-certified Consultant participation*
One point for every 2 percent increase in
professional services over the EDGE
participation goal
4. Overall Team Qualifications (Maximum 10 points)
a. Previous team collaboration
b. LEED** Registered / Certified project experience
c. BIM project experience
d. Team organization
Less than 4 sample projects
4 to 6 sample projects
More than 6 sample projects
Registered LEED v4.0 or v4.1 projects
Certified LEED v4.0 or v4.1 projects
Training and knowledge
Direct project experience
Clarity of responsibility / communication
demonstrated by table of organization
5. Overall Team Experience (Maximum 30 points)
a. Previous team performance
b. Experience with similar projects / delivery methods
c. Budget and schedule management
d. Knowledge of Ohio Capital Improvements process
Past performance as indicated by
evaluations and letters of reference
Less than 4 projects
4 to 6 projects
More than 6 projects
Performance in completing projects within
original construction budget and schedule
Less than 4 projects
4 to 6 projects
More than 6 projects
Value
Score
5
2
0
2
1
0
1
2
3
Max
=3
0 - 10
0 - 10
0-5
0-5
Max
= 20
0 - 15
0-5
1
2
3
Max
=3
1
Max
2
=2
1
Max
3
=3
0-2
0 - 10
0-3
4-6
7 - 10
0-5
0-1
2-3
4-5
* Must be comprised of professional design services consulting firms and NOT the lead firm - For more
information on scoring this and other criteria refer to Document F199-01 - PS Selection Rating Rubric.
** Leadership in Energy & Environmental Design administered by Green Business Certification Inc.
Notes:
Evaluator:
Name
Subtotal
Signature
Date
F110-02-2022-MAR
Publish Date: 2/18/2026
Page 5 of 5
This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

Publish Date Due Date Number Owner Contractring Authority Project Name Primary Service Estimated

Ohio Facility Construction Commission

Bid Due: 7/01/2026

Public Survey- Licking County FB Post- Mitigation Plan Update Please help Licking County

Licking County

Bid Due: 7/01/2026

Publish Date Due Date Number Owner Contractring Authority Project Name Primary Service Estimated

Ohio Facility Construction Commission

Bid Due: 7/01/2026

AML Reclamation Cultural Resource Management Services (FY 2027) July 24, 2025 | ODNR

State of Ohio - Department of Natural Resources

Bid Due: 7/02/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.