| Location: | New Mexico |
|---|---|
| Posted: | Sep 30, 2026 |
| Due: | Oct 6, 2026 |
| Agency: | City of Santa Fe |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
Project ID:
Title: Primary Clarifier #1 Rehabilitation Project
Addenda: 3
Release Date: 8/27/2026
Due Date: 10/6/2026
The primary clarifiers were installed in 1998 and have reached the end of their useful life. The coating on the metal equipment has failed resulting is extensive corrosion of the carbon steel. The mechanical system is beyond repair, so this equipment must be removed and replaced. This project proposes to replace the mechanical equipment, replacement of the electrical control panel, and concrete/grout repairs, to restore proper operation and extend the units life as per the attached plans and specifications.

With GovernmentContracts, you can:
...Project ID: Title: Turnkey-Engineering, Procurement and Construction (EPC) for New Carbon Coal..., Procurement ...
City of Gallup
Bid Due: 11/05/2026
...Project ID: Title: Turnkey-Engineering, Procurement and Construction (EPC) for New Carbon Coal..., Procurement ...
City of Gallup
Bid Due: 11/06/2026
.... Problems Solved DAC changes how the sorbent gives up its captured carbon. ...
ENERGY, DEPARTMENT OF
Bid Due: 11/17/2026
...in a membrane system that can help users recover hydrogen, separate carbon dioxide ...
ENERGY, DEPARTMENT OF
Bid Due: 12/04/2026