Shadow Mountain Water System Project (Water Main and Booster Pump Station)

Location: Washington
Posted: Sep 3, 2026
Due: Sep 28, 2026
Agency: County of Cowlitz
Type of Government: State & Local
Category:
  • 43 - Pumps and Compressors
  • Z - Maintenance, Repair or Alteration of Real Property
Publication URL: To access bid details, please log in.
Bid Title: Shadow Mountain Water System Project (Water Main and Booster Pump Station)
Category: Public Works
Status: Open
Description:

Construction of the water mains will include approximately 62 linear feet (lf) of 12” diameter water main, 1,050 lf feet of 8-inch-diameter water main and approximately 670 lf of 4-inch-diameter future reservoir fill line. Installation, connection, mechanical improvements, electrical and controls for County provided booster pump station.  There will be domestic service connections and fire hydrants.  The 4” mains will be installed from the existing reservoir, located just to the north of the high school, along a proposed easement just east of the existing property line and then within the existing roadway and utilities easement and terminate at Halo Rim Drive. The 8” water mains will be installed along existing development roadway and utilities easements.

Publication Date/Time:
9/3/2026 12:00 pm
Closing Date/Time:
9/28/2026 1:30 pm
Submittal Information:
www.bxwa.com (Please note that it may take 24-48 hours for this site to be updated)
Related Documents:

Attachment Preview

Cowlitz County
Department of Public Works
CONTRACT DOCUMENTS FOR
SHADOW MOUNTAIN WATER SYSTEM PROJECT
(Water main and Booster Pump Station)
NE ¼ SEC. 25 , T10N, R1W
& NW ¼ SEC 30, T10N, R1E
Project Number 95052
September 2026
COWLITZ COUNTY
Department of Public Works
1600-13th Avenue South
Kelso, Washington 98626
Phone (360) 577-3030
BOARD OF COUNTY COMMISSIONERS
STEVE RADER
District No. 1
STEVEN L. FERRELL
District No. 2
RICHARD R. DAHL
District No. 3
CONTRACT
Cowlitz County
Department of Public Works
CONTRACT DOCUMENTS FOR
SHADOW MOUNTAIN WATER SYSTEM PROJECT
(Water main and Booster Pump Station)
NE % SEC. 25, TION, RlW
& NW % SEC 30, T10N, R1E
Project Number 95052
September 2026
o! s
o-l
27444
3888S
Signed:8h4/2O26
Signed 8lL4/2026
Responsible for all portions of the Contract Documents
COWTITZ COUNTY
Department of Public Works
1600-13th Avenue South
Kelso, Washington 98626
Phone (360) 577-3030
CONTRACT
Approved by:
Susa n E genis, P
County Engineer
6 { JU
Date
TABLE OF CONTENTS
SHADOW MOUNTAIN WATER SYSTEM PROJECT
Call for Bids ............................................................................................................................................................... 1
Bidder’s Checklist ...................................................................................................................................................... 3
Proposal Form ........................................................................................................................................................... 4
Instruction to Bidders................................................................................................................................................ 5
Proposal .................................................................................................................................................................... 7
Non-Collusion Declaration ...................................................................................................................................... 10
Subcontractor List ................................................................................................................................................... 11
Bid Deposit Form Proposal Bond ............................................................................................................................ 12
E-Verify Declaration ................................................................................................................................................ 13
Compliance with Wage Payment Laws Declaration................................................................................................ 14
Agreement .............................................................................................................................................................. 15
Performance Bond .................................................................................................................................................. 19
Special Provisions.................................................................................................................................................... 20
Prevailing Minimum Hourly Wage Rates................................................................................................................. 67
Call Before You Dig.................................................................................................................................................. 68
Technical Specifications
DIVISION 1 GENERAL.............................................................................................................................................. 1-1
1.10 GENERAL....................................................................................................................................................... 1-1
1.10.16 Definitions......................................................................................................................................... 1-1
1.11.00 Summary of Work............................................................................................................................. 1-1
1.11.02 Reuse of Documents ......................................................................................................................... 1-2
1.11.03 Electronic Data ................................................................................................................................. 1-2
1.13 Permits and Licenses.............................................................................................................................. 1-3
1.14 Work Restrictions .................................................................................................................................. 1-3
1.14.19 Use of Site......................................................................................................................................... 1-3
1.20 PRICE AND PAYMENT PROCEDURES .................................................................................................................... 1-4
1.21.29 Quantity Allowances......................................................................................................................... 1-4
1.25.00 Substitution Procedures.................................................................................................................... 1-4
1.25.13.10 Substitutions Prior to Bid Opening............................................................................................... 1-5
1.25.13.15 Substitutions After Contract Execution........................................................................................ 1-5
1.30 ADMINISTRATIVE............................................................................................................................................. 1-5
1.31 Project Management and Coordination ................................................................................................ 1-5
1.31.01 Contractor’s Responsibility ............................................................................................................... 1-5
1.31.19 Progress Meetings ............................................................................................................................ 1-6
1.32.13 Scheduling of Work........................................................................................................................... 1-7
1.32.16 Construction Progress Schedule........................................................................................................ 1-7
1.32.29 Periodic Work Observation............................................................................................................... 1-7
1.33 Submittals.............................................................................................................................................. 1-8
1.33.23 Shop Drawings, Product Data, and Samples .................................................................................... 1-8
1.40 QUALITY REQUIREMENTS................................................................................................................................ 1-10
1.42.19 Reference Standards....................................................................................................................... 1-10
1.43.20 Warranty ........................................................................................................................................ 1-10
1.45.16 Field Quality Control Procedures .................................................................................................... 1-11
1.50 TEMPORARY FACILITIES AND CONTROLS............................................................................................................. 1-11
1.51 Temporary Utilities .............................................................................................................................. 1-11
CONTRACT
1.52.00 Construction Facilities..................................................................................................................... 1-12
1.52.20 Locks and Keys ................................................................................................................................ 1-12
1.54 Construction Aids................................................................................................................................. 1-12
1.55.26 Traffic Control................................................................................................................................. 1-13
1.60 PRODUCT REQUIREMENTS .............................................................................................................................. 1-13
1.61 Common Product Requirements.......................................................................................................... 1-13
1.61.31 Integrated (or Package) Products................................................................................................... 1-13
1.70 EXECUTION AND CLOSEOUT REQUIREMENTS....................................................................................................... 1-13
1.71 Examination and Preparation.............................................................................................................. 1-13
1.71.23.16 Construction Surveying.............................................................................................................. 1-13
1.74 Cleaning and Waste Management...................................................................................................... 1-14
1.74.13 Progress Cleaning ........................................................................................................................... 1-14
1.74.23 Final Cleaning ................................................................................................................................. 1-14
1.75 Starting and Adjusting......................................................................................................................... 1-14
1.75.16 Startup Procedures ......................................................................................................................... 1-14
1.75.16.10 Startup....................................................................................................................................... 1-14
1.75.16.12 Startup and Testing Coordination.............................................................................................. 1-15
1.75.16.20 Testing ....................................................................................................................................... 1-16
1.75.16.22 Scheduling of Owner Review for Testing ................................................................................... 1-16
1.75.16.32 Pump Testing ............................................................................................................................. 1-17
1.75.16.40 Electrical and Control Systems Testing ...................................................................................... 1-17
1.78 Closeout Submittals ............................................................................................................................. 1-18
1.78.23 Operation and Maintenance Data.................................................................................................. 1-18
1.78.39 Project Record Documents ............................................................................................................. 1-19
1.79 Demonstration and Training................................................................................................................ 1-20
1.79.10 Training........................................................................................................................................... 1-20
1.80 PERFORMANCE REQUIREMENTS ....................................................................................................................... 1-20
1.81 Facility Performance Requirements..................................................................................................... 1-20
1.81.40 Pressure Ratings ............................................................................................................................. 1-21
1.81.45 Location Designations .................................................................................................................... 1-21
1.81.50 Materials in Contact with Domestic Water .................................................................................... 1-22
DIVISION 2 SITEWORK ............................................................................................................................................ 2-1
2.00 GENERAL....................................................................................................................................................... 2-1
2.05 Common Work for Exterior Improvements............................................................................................ 2-1
2.07 Geotechnical Investigations................................................................................................................... 2-1
2.08 Special Inspections for Earth Work........................................................................................................ 2-1
2.10 SITE PREPARATION .......................................................................................................................................... 2-2
2.10.2 Clearing and Grubbing........................................................................................................................ 2-2
2.10.5 Temporary Access Roads .................................................................................................................... 2-3
2.11 Earthwork Materials.............................................................................................................................. 2-3
2.11.1 Common Work for Earthwork Materials ............................................................................................ 2-3
2.11.2 General Fill.......................................................................................................................................... 2-4
2.11.3 Structural Fill....................................................................................................................................... 2-4
2.11.6 Gravel Backfill for Drains .................................................................................................................... 2-5
2.11.7 Gravel Base Course ............................................................................................................................. 2-6
2.11.8 Gravel Top Course............................................................................................................................... 2-6
2.11.20 Geotextile Fabric............................................................................................................................... 2-6
2.20 EARTH MOVING.............................................................................................................................................. 2-7
CONTRACT
2.23 Excavation ............................................................................................................................................. 2-7
2.25 Temporary Erosion and Sedimentation Control..................................................................................... 2-8
2.25.2 Contractor Provided Certified Erosion and Sedimentation Control Lead............................................ 2-8
2.25.3 Temporary Erosion and Sedimentation Control.................................................................................. 2-8
2.25.5 Filter Fabric Fence............................................................................................................................... 2-9
2.30 SITE IMPROVEMENTS ..................................................................................................................................... 2-10
2.31 Fencing and Gates ............................................................................................................................... 2-10
2.31.1 Common Work for Fencing............................................................................................................... 2-10
2.31.2 Temporary Construction Security Fence ........................................................................................... 2-11
DIVISION 3 CONCRETE............................................................................................................................................ 3-1
3.00 GENERAL....................................................................................................................................................... 3-1
3.05 Common Work for Concrete .................................................................................................................. 3-1
3.10 FORMING AND ACCESSORIES ............................................................................................................................. 3-3
3.11 Formwork .............................................................................................................................................. 3-3
3.11.13 Structural Cast in Place Forming....................................................................................................... 3-3
3.15 Concrete Accessories ............................................................................................................................. 3-5
3.15.13 Non-Expanding Waterstops.............................................................................................................. 3-5
3.15.14 Expanding Waterstops ..................................................................................................................... 3-6
3.15.02 Premolded Joint Filler ....................................................................................................................... 3-7
3.15.03 Expansion Joints ............................................................................................................................... 3-7
3.15.05 Pipe Penetrations through Concrete................................................................................................. 3-7
3.20 REINFORCING ................................................................................................................................................. 3-8
3.21 Reinforcement Bars ............................................................................................................................... 3-8
3.21.11 Plain Steel Reinforcement Bars......................................................................................................... 3-8
3.22.13 Galvanized Welded Wire Fabric Reinforcement ............................................................................... 3-9
3.30 CAST-IN-PLACE CONCRETE ............................................................................................................................. 3-10
3.30.05 Common Work for Cast in Place Concrete...................................................................................... 3-10
3.31 Structural Concrete.............................................................................................................................. 3-13
3.31.30 Thrust Blocks, Driveways, Curb, Gutter, Sidewalks, Equipment Pads, and Fence Posts ................. 3-13
3.31.32 Hydraulic Concrete ......................................................................................................................... 3-14
3.31.34 Retaining Walls............................................................................................................................... 3-15
3.31.36 Concrete for Mass Structures ......................................................................................................... 3-15
3.40 PRE-CAST CONCRETE..................................................................................................................................... 3-15
3.48 Pre-Cast Concrete Specialties .............................................................................................................. 3-15
3.48.50 Utility Structures............................................................................................................................. 3-15
3.48.52 Precast Gravity or Thrust Blocks..................................................................................................... 3-16
3.60 GROUTING................................................................................................................................................... 3-17
3.62 Non-Shrink Grouting............................................................................................................................ 3-17
3.62.13 Non-Metallic Non-Shrink Grout ...................................................................................................... 3-17
3.64 Injection Grouting................................................................................................................................ 3-19
3.64.23 Epoxy Injection Grouting ................................................................................................................ 3-19
DIVISION 8 OPENINGS............................................................................................................................................ 8-1
8.00 GENERAL....................................................................................................................................................... 8-1
8.05 Common Work for Openings ................................................................................................................. 8-1
8.30 SPECIALTY DOORS ........................................................................................................................................... 8-1
8.31.20 Vault Hatches ................................................................................................................................... 8-1
DIVISION 9 FINISHES............................................................................................................................................... 9-1
CONTRACT
This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

Basic Information Solicitation Number MC-0321006_2.1.01 Title Seattle-Tacoma International Airport South Concourse Evolution (SCE),

Port of Seattle

Bid Due: 10/15/2026

Solicitation Information Title Enterprise Resource Planning (ERP) System Request for Proposal Reference Number

State Government of Washington

Bid Due: 10/16/2026

Basic Information Solicitation Number MC-0322824 Title Rental Car Facility (RCF) Quick Turn Around

Port of Seattle

Bid Due: 10/01/2026

Project ID: Title: Nisqually Rd SW (Nisqually River to I-5 Northbound Ramp). CRP

Pierce County

Bid Due: 9/30/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.