Morada Acres Water System Rehabilitation Project
The work is located within the Morada Acres Maintenance District in Stockton, CA.
The work, in general, consists of installing approximately 2,400 feet of new water main piping, including gate valves, fire hydrants, appurtenances, a hydropneumatic tank, water service laterals, and new water meters and boxes within the Morada Acres Maintenance District. Base Estimate Range between $1,000,000 and $1,230,000 |
10/23/2025 08:31 PM UTC |

With GovernmentContracts, you can:
...of pipes, concrete walls, valves, slide/sluice gates, electrical systems, metal and concrete tanks...
City of Pacifica
Bid Due: 6/30/2026
...of diffusers to mix the flow in the mixed liquor channels, gates and ...
San Francisco Public Utilities Commission
Bid Due: 7/23/2026
...to, the installation and/or repair of pipes, concrete walls, valves, slide/sluice gates, electrical...