| Location: | Iowa |
|---|---|
| Posted: | Mar 3, 2025 |
| Due: | Mar 24, 2025 |
| Agency: | City of Davenport |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 25-66 |
| Publication URL: | To access bid details, please log in. |
Bid Information
| Type | Invitation to Bid |
| Status | Issued |
| Number | 25-66 (W. 70th St Sidewalk Improvements| Ridgeview Park to Division St Project) |
| Issue Date & Time | 3/3/2025 04:00:01 PM (CT) |
| Close Date & Time | 3/24/2025 09:30:00 AM (CT) |
| Question Cut Off Date | 3/13/2025 11:30:00 AM (CT) |
| Notes |
The City of Davenport is accepting bids for the construction of an ADA crossing of Division Street located at the existing signalized crossing of Division Street north of west 70th Street, as well as constructing sidewalk from the crossing to connect with the existing sidewalk system within Ridgeview Park. With this project an ADA crossing of the west leg of 70th Street to the south is also to be constructed.
The proposed improvements include, but are not limited to, the furnishing of all labor for the construction of 4” PCC sidewalk, 6” PCC turning spaces, 8” PCC ADA Ramps, associated stone subbase material, adjusting all existing utility surface features to finish grade, topsoil and sod, and erosion control.
Bids must be submitted through the City of Davenport e-bidding system (https://davenport.ionwave.net); no emails, faxes, paper copies or any other submission method will be accepted. Within the system, each tab of the Invitation to Bid must be reviewed and responded to accordingly. |
| Name | Mary Sakalosky |
| Address |
226 WEST FOURTH STREET
DAVENPORT, IA 52801 USA |
| Phone | |
| Fax | |
| mary.sakalosky@davenportiowa.com |
| Document name | Format | ||
|
|||
|
Bid Invitation
|
Acrobat / PDF | BINVAVL | 8193272 |
| File Name | Description | File Size | ||
|
||||
|
SP_PRJ521220SW_Ridgeview20to%20Division.docx
|
Specifications & Special Provisions | 1.73 MB | 311355 | 6502372 |
|
25-02-04_PRJ5215_Ex_A.pdf
|
Plans | 4.69 MB | 311355 | 6501206 |
|
2025 Construction Community Reminders - SUDAS.pdf
|
SUDAS | 2025 Required Improvements | 175 KB | 311355 | 6458855 |
|
Insurance Requirements - Medium Hazard.pdf
|
Contractor Insurance Requirements - Medium Hazard | 497 KB | 311355 | 5231273 |
|
Instruction to Bidders.pdf
|
Instruction to Bidders | 79 KB | 311355 | 667973 |
|
Bidder Status Form - To be completed by all bidders..pdf
|
Bidders Status Form must be filled out and attached under the "Response Attachments" tab. | 155 KB | 311355 | 655127 |
|
DBE Subcontract contact forms 10.30.2020.doc
|
DBE Subcontract Contact Form | 59 KB | 311355 | 3603310 |
|
General_Contract_Conditions_12.14.20.pdf
|
General Contract Conditions. 12.14.20 | 262 KB | 311355 | 3692771 |

With GovernmentContracts, you can:
...-509-1373 Construction manager: Claire Vorthmann cev@iastate.edu 515-686-0957 Design Professional... West Des Moines Iowa ...
Iowa State University
Bid Due: 10/13/2026
...Construction manager: Claire Vorthmann cev@iastate.edu 515-686-0957 Design Professional: Alyssa Iverson...@mbionline.com McGraw-Hill Construction Dodge ...
Iowa State University
Bid Due: 10/29/2026
...Cho namho-cho@uiowa.edu Estimated Construction Cost: $159,503.00 Pre Bid Date: 9/29/26 Pre Bid... Location: ...
University of Iowa Facilities Management
Bid Due: 10/14/2026
...estimated construction cost range for this project is $150,000 to $250,000. Completion Dates...: ...
State Government of Iowa
Bid Due: 10/27/2026