Repaint Man Doors & Frames RFQ

Location: Illinois
Posted: May 26, 2026
Due: Jul 24, 2026
Agency: City of Rock Island
Type of Government: State & Local
Category:
  • Z - Maintenance, Repair or Alteration of Real Property
Publication URL: To access bid details, please log in.
Bid Title: Repaint Man Doors & Frames RFQ
Category: Construction Projects
Status: Open
Description:

The objective of this project is to prep, prime, and repaint two (2) exterior/interior man doors and their associated frames at the station. Additionally, the contractor will supply and install protective metal hardware on both doors. Because these doors separate or protect the living quarters of the station, maintaining the integrity of the fire protection rating is paramount throughout the duration of this project. Please see full RFQ for additional details.

Publication Date/Time:
5/26/2026 12:00 am
Closing Date/Time:
7/24/2026 3:00 pm
Contact Person:
Bob Graff, Fire Chief
Related Documents:

Attachment Preview

REQUEST FOR QUOTE (RFQ)
City of Rock Island Fire Department — Fiscal Year 2027
Repaint Man Doors and Frames
1. Introduction & Project Overview
The City of Rock Island Fire Department is requesting quotes from qualified contractors for a
commercial rehabilitation/maintenance project.
Project Site Location: Station #3, 1601 30th Street
Operational Status: Bidders must take notice that the Rock Island Fire Department
operates active, working fire stations that are manned 24 hours a day, 7 days a week, 365
days a year.
Project Coordination: The Fire Department will make all reasonable attempts to
accommodate and facilitate project workflows as milestones are completed, ensuring a
collaborative balance between emergency operations and construction progression.
Funding & Compliance: This project may utilize public funding. Accordingly, all work
must comply with applicable local building and zoning codes, State of Illinois
regulations, and Federal standards where applicable.
Site Visit Requirement: Contractors interested in bidding may schedule an on-site
project review before submitting their quote. Please call or email to coordinate a
walkthrough.
2. Submission Details & Deadlines
All quotes must be submitted electronically via email. Late submissions will not be reviewed or
considered.
Submission Email: firemail@rigov.org
Submission Deadline (Date & Time): Friday, July 24, 2026, at 3:00 p.m.
Email Subject Line Format: QUOTE ENCLOSED: Man Door Repaint
3. Scope of Work & Timeline
The selected contractor will act as the General Contractor for the project and will be responsible
for managing any required subcontractors.
Detailed Scope: Station Man Door Repainting & Hardware Installation
3.1 Project Overview
The objective of this project is to prep, prime, and repaint two (2) exterior/interior man
doors and their associated frames at the station. Additionally, the contractor will supply
and install protective metal hardware on both doors. Because these doors separate or
protect the living quarters of the station, maintaining the integrity of the fire protection
rating is paramount throughout the duration of this project.
3.2 Schedule & Fire Safety Requirements:
Critical Fire Safety Mandate
The entries involved in this scope provide critical fire separation for the station’s
living quarters. The fire barrier must never be compromised. * No Open
Openings: Doors may not be removed and left open overnight or during periods
when the contractor is not actively working on-site.
Work Sequencing: If a door must be unhinged for prep/painting, a temporary
fire-rated barrier must be established, or the contractor must work on one door at
a time, ensuring it can be closed.
Hardware & Ratings: All paints, primers, and newly installed hardware must
not interfere with the doors' self-closing. Existing fire-rating labels on the hinge
edge of the doors and frames must not be painted over, scraped off, or obscured.
3.3 Detailed Scope of Work
Phase 1: Surface Preparation
Cleaning: Thoroughly clean doors and frames to remove dirt, grease, oils, and
contaminants using a heavy-duty cleaner.
De-glossing & Sanding: Scrape away any loose, peeling, or blistering paint.
Feather-sand smooth all rough edges. Lightly sand the entire surface of the doors
and frames to ensure proper adhesion of the new coating.
Masking: Mask off and protect all adjacent surfaces, floors, weather-stripping,
fire labels, push bars, locks, and closing hardware.
Phase 2: Paint Application & Color Matching
Color Matching: The contractor shall take a physical sample or utilize an
electronic color-matching tool on the existing door color. A sample swatch must
be approved by the Station Manager before a full application to ensure it matches
the existing color as closely as possible.
Priming: Apply one (1) full coat of high-quality, rust-inhibitive primer (if steel)
or a bonding primer suitable for the existing substrate and paint type.
Topcoats: Apply two (2) coats of premium industrial-grade, high-traffic
exterior/interior paint (semi-gloss or gloss finish as specified by the station) to the
doors and the frames.
Phase 3: Hardware Supply & Installation
The contractor will supply and install the following commercial-grade hardware on
both doors:
1. Push Plates: Two (2) metal push plates installed at push-bar/hand-strike level.
2. Kick Plates: Two (2) metal kick plates installed at the bottom base of the doors.
3. Door Knobs: Two (2) non-latching door knobs installed.
Specifications: Plates to be stainless steel or aluminum.
Installation: Plates must be securely fastened with flush, countersunk screws.
They must be installed perfectly level and must not impede the proper
operation, swinging, or latching of the door.
4. Cleanup & Waste Management
● Maintain a clean work area daily.
● Remove all masking tape, drop cloths, and debris upon completion.
● Properly dispose of all paint cans, rags, and hazardous materials according to local
environmental regulations.
● Provide the station with a minimum of one (1) quart of leftover paint per color for future
touch-ups, properly sealed and labeled.
5. Inspection & Acceptance
Final acceptance will be granted upon inspection by the Fire Chief. Criteria for acceptance
include:
● Uniform paint coverage free of runs, sags, drips, or brush marks.
● Accurate color matches the original scheme.
● Clean, unpainted fire labels and hardware.
● Smooth operation and successful self-closing/latching of both fire-rated doors.
● Secure, level installation of all metal plates.
6. Contractor Qualifications & Requirements
Bidders must meet and provide proof of the following qualifications to be considered for a
contract award:
Licensing & Registration: Active registration/good standing with the Illinois Secretary
of State and possession of all required local and state professional licenses.
Permits: Ability to secure all required municipal building permits (including providing
stamped drawings or additional plans if required for plan review).
Insurance: Proof of General Liability, Commercial Vehicle, and Workers' Compensation
Insurances, naming the City of Rock Island as an additional Certificate Holder.
Equipment: Ownership of, or documented access to, sufficient equipment to complete
the work safely and efficiently.
7. Prevailing Wage Rates & Labor Laws
This project is subject to strict labor standards and wage regulations.
Commercial Wage Policy: In accordance with Illinois Statutes and City of Rock Island
policy, all contractors and subcontractors must adhere to Federal Davis-Bacon prevailing
commercial wage rates (or applicable Illinois Department of Labor Prevailing Wage
rates, whichever is higher). Residential wage rates do not apply to this project.
Owner-Operators: Owner-operators are not exempt and must pay themselves prevailing
wage rates.
Documentation: Bidders must complete and attach a Project Wage Rate Sheet outlining
the job classification, hourly wage, and fringe benefits for every worker. Certified payroll
documentation will be required throughout the project.
Apprentices: Valid U.S. Department of Labor (DOL) apprentice certification is required
for all apprentices utilized on-site.
8. Quote Preparation Guidelines
To ensure a fair evaluation, your emailed quote packet must include:
1. Company Identifiers: Legal Company Name, Federal Tax ID Number (EIN), and
SAM.gov Entity ID Number (if applicable).
2. Contact Info: Authorized contact person's name, phone number, email address, date, and
formal signature.
3. Subcontractor List: Clear identification of any subcontractors intended for use on the
project.
9. Evaluation & Award Process
The City of Rock Island Fire Department will review all quotes for responsiveness. The lowest
monetary quote does not automatically guarantee a contract award. Evaluation criteria include,
but are not limited to:
● Total competitive pricing
● Professional experience, references, and previous work history
● Verification of state licenses, insurance certificates, and bonding
● Financial stability and operator experience
The City reserves the right, at its sole discretion, to reject any or all quotes or to determine which
contractor is most responsive to this invitation.
10. Contact & Clarifications
All administrative questions, technical clarifications, or site-visit scheduling requests must be
directed to the Fire Chief:
Contact Person: Fire Chief, City of Rock Island Fire Department
Address: 1313 5th Avenue, Rock Island, IL 61201
Phone: 309-732-2800
Email: firemail@rigov.org
This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

...Follow FY26 Fire Suppression Active Contract Opportunity Notice ID FA440726QBM01 Related Notice... Aside: ...

DEPT OF DEFENSE

Bid Due: 7/27/2026

...Bid Number: BID NO. 626-FD-057 Bid Title: ROCKFORD FIRE DEPARTMENT HEADQUARTERS RENOVATIONS... Category: ...

City of Rockford

Bid Due: 7/30/2026

...Emergency Notice-Fire Pump Repl J0170 Spfld Bid Opening Date 08/31/2026 17:00:00 Bid Holder ...

State Government of Illinois

Bid Due: 8/31/2026

...Emergency Notice-Fire Pump Repl J0170 Spfld Bid Opening Date 08/31/2026 17:00:00 Bid Holder ...

State Government of Illinois

Bid Due: 8/31/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.