| Location: | Vermont |
|---|---|
| Posted: | Mar 12, 2026 |
| Due: | May 18, 2026 |
| Agency: | State Government of Vermont |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
|
Bid Type: Job Contract Locations: Windsor Keywords: Construction (Building), Concrete Bid Description: The Town of Bethel is accepting proposals to replace our existing salt shed with a 30’ x 30’ SteelMaster roof kit model R30-15, on a poured concrete foundation 30’-5.5” Long x 30’-2.5” Wide x 6” Thick slab, 10’ walls (2’ inground, 8’ out), #4 rebar throughout footer, walls and floor, with 2’ returns on end walls. Walls and footers to be keyed in. The concrete is to be sealed with a salt resistant sealer. The SteelMaster roof kit will be onsite and provided by the Town, all other materials shall be provided by the contractor.
|
||||||||||||||||||||||||||||

With GovernmentContracts, you can:
...Owner's Rep/Construction Manager Request Date: 7/16/2026 9:48:24 AM Open Date: 7/16/2026 Closing...: Consultant ...
State Government of Vermont
Bid Due: 8/10/2026
...Kennedy Drive Pond 7 Stormwater Improvements Construction Request Date: 7/22/2026 2:54:49 PM Open... ...
State Government of Vermont
Bid Due: 8/28/2026
...Lake Forest Condos Stormwater Improvement Project Construction Request Date: 7/15/2026 10:52:16 AM... Winooski ...
State Government of Vermont
Bid Due: 8/07/2026
...Keywords: Bridge Repair and Construction, Road Construction Bid Description: Replacement of Bridge No.../contract-admin/bids-requests/construction-contracting ...
State Government of Vermont
Bid Due: 8/21/2026