| Location: | Texas |
|---|---|
| Posted: | May 28, 2026 |
| Due: | Jul 10, 2026 |
| Agency: | City of Dallas |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | CIZ-DWU 26 019 |
| Publication URL: | To access bid details, please log in. |
Project Description: The project consists of the construction of a new residuals bypass pipeline, mechanical upgrades to the Sludge Pump Station, installation of variable frequency drives, a new electrical building with a motor control center (MCC), HVAC improvements, and replacement of the site transformer. Additional improvements include new flowmeter controls, irrigation and landscaping enhancements, and security upgrades at the North Berry Road gate. Modifications to the existing clearwells are also included as additive alternates. Volumes 1, 2, & 3 Specifications, Drawings, and Bid Proposal Spreadsheet will be uploaded Friday May 29, 2026.

With GovernmentContracts, you can:
...Project ID: Title: Cedar Creek Section 4 Pipeline Replacement and Cedar Creek Lake ...
Tarrant Regional Water District
Bid Due: 9/23/2026
..., inspect and test the construction items required for the installation of a ...
City of Waco
Bid Due: 10/29/2026
.... Dewatering and drying of existing wet wells. Inspect existing pump base elbows. ...
City of League City
Bid Due: 9/23/2026
...Project ID: Title: Clearfork Signage Installation Addenda: 0 Release Date: 9/3/2026 Due Date: ...
Tarrant Regional Water District
Bid Due: 9/23/2026