| Location: | Vermont |
|---|---|
| Posted: | May 1, 2026 |
| Due: | May 7, 2026 |
| Agency: | Town of Middlebury |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
| PAVING SCHEDULE | Compacted Depth | Estimated Area (SF) | Work Scope |
|---|---|---|---|
| Mary Hogan Parking Lot | 2.25 Inches | 31,500 | 3/4 Inch Shim and 1 1/2 Inch Top |
| Rec Park Sidewalk | 4-inches | 6,050 | 2-inches of top, 2 - inches of top |
| Mary Hogan Drive | 4-inches | 4,700 | 2-1/2 Inches of Base and 1-1/2 Inches of Top |
| DPW North Side of Shop | 4-inches | 11,000 | 2 -1/2 Inches of Base and 1-1/2 Inches of Top |
| Lower Plains Road | 2.25 Inches | 68,875 | 3/4 Inch Shim and 1 1/2 Inch Top |
| Seminary Street | 2.25 Inches | 49,607 | 3/4 Inch Shim and 1 1/2 Inch Top |
| South Street | 1.25 Inches | 71,800 | 1-1/4 Inch Top |
| Willow Drive | 2.25 Inches | 11,500 | 3/4 Inch Shim and 1 1/2 Inch Top |
April 30, 2026
ADDENDUM NO. 2
TO THE CONTRACT DOCUMENTS FOR
Town of Middlebury
2026 Municipal Paving Project
Your attention is directed to the following changes in, additions to, or deletions from the Contract
Documents for the Town of Middlebury 2026 Municipal Paving Project. This complete
Addendum, including attachments, shall be included within the Contract Documents and shall
take precedence in the case of any discrepancies.
BIDDER must acknowledge receipt of all ADDENDA on the BID or may be considered non-
responsive. This Addendum consists of one (1) page.
1. Special Conditions: REMOVE Special Condition 13 - Areas of Work and Required Paving
Thicknesses and REPLACE Special Condition 13 - Areas of Work and Required Paving
Thicknesses in its entirety as follows:
"13. Areas of Work and Required Paving Thickness - The following is a list of the areas of
work and expectations for paving types and thicknesses.
PAVING SCHEDULE Compacted Depth Estimated Area (SF) Work Scope
Mary Hogan Parking Lot 2.25 Inches 31,500 3/4 Inch Shim and 1 1/2 Inch Top
Rec Park Sidewalk 4-inches 6,050 2-inches of top, 2 - inches of top
Mary Hogan Drive 4-inches 4,700 2-1/2 Inches of Base and 1-1/2 Inches of Top
DPW North Side of Shop 4-inches 11,000 2 -1/2 Inches of Base and 1-1/2 Inches of Top
Lower Plains Road 2.25 Inches 68,875 3/4 Inch Shim and 1 1/2 Inch Top
Seminary Street 2.25 Inches 49,607 3/4 Inch Shim and 1 1/2 Inch Top
South Street 1.25 Inches 71,800 1-1/4 Inch Top
Willow Drive 2.25 Inches 11,500 3/4 Inch Shim and 1 1/2 Inch Top
Questions During Bid Phase
QUESTION: If you pave curb to curb the square footage for south street is incorrect?
ANSWER: Thank you. Refer to revised table. This number was used in
calculating the total TONS of asphalt and no change needed to bid
schedule.
Town of Middlebury - 2026 Municipal Paving Project April 30, 2026
Addendum No. 2 to the Contract Documents Page 1 of 1
Otter Creek Engineering, Inc.

With GovernmentContracts, you can:
Roadway Line Striping and Markings Request Date: 7/24/2026 2:23:32 PM Open Date: Closing
State Government of Vermont
Bid Due: 8/19/2026
Bid Title: Roadway Line Stripings and Markings Category: RFPs, RFQs and Bids Status:
City of Winooski
Bid Due: 8/19/2026
SOS Next Generation Licensing Platform O&M Support Request Date: 7/27/2026 11:48:48 AM Open
State Government of Vermont
Bid Due: 8/28/2026
TITLE QUESTIONS DUE ANSWERS POSTED DUE DATE NO POSTING AFTER SOS Next Generation
State of Vermont
Bid Due: 8/28/2026