| Location: | California |
|---|---|
| Posted: | Jun 22, 2026 |
| Due: | Jun 30, 2026 |
| Agency: | Sutter County |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | B2201 |
| Publication URL: | To access bid details, please log in. |
Project Description: The work to be performed under this contract includes the furnishing of all labor, materials, equipment, transportation and services necessary for the Live Oak Canal Bridge Replacement at Sanders and Larkin Roads. The work includes removal of existing bridge and roadway elements, excavation, traffic control, storm water pollution prevention measures, construction of a reinforced concrete box culvert and retaining wall, installation of aggregate base and hot mix asphalt, guardrail systems, drainage improvements, pavement delineation, reflective thermoplastic striping and markings, and all associated restoration work necessary to complete the project. The work limits are shown on the Project Plans and associated contract documents.

With GovernmentContracts, you can:
...of existing fencing fabric, excavation and grading, installation of approximately 60 linear feet ...
City of Foster City
Bid Due: 8/12/2026
.... Work includes wall demolition, grading and excavation, utility coordination, pavement removal...
Ventura County
Bid Due: 7/28/2026
...include (but are not limited to) roadway excavation, full depth structural section paving, ...
Marin County
Bid Due: 7/20/2026
..., and other ancillary and support facilities; site improvements, excavation, pavement replacement...
Orange County Water District
Bid Due: 8/18/2026