| Location: | Connecticut |
|---|---|
| Posted: | Apr 21, 2025 |
| Due: | May 19, 2025 |
| Agency: | State Government of Connecticut |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 29692 |
| Publication URL: | To access bid details, please log in. |
The Construction Project is to provide for the construction of an off-road multi-use trail from Maple Drive northerly, crossing Purdy Hill Road, and continuing to the parking lot at the end of the Wolfe Park driveway for an approximate distance of 4,535 linear feet including, but not limited to installation of a 10 foot-wide stone dust trail, retaining walls, wood and PVC fencing, steel bollards, bicycle stand, rectangular rapid flashing beacons (RRFBs), sidewalk, drainage improvements, landscaping, benches, and pavement markings. RFP# 2025-05 and supporting Engineering Plans may be obtained at https://monroect.gov/p/rfp-2025-05-housatonic-valley-rail-trail-section-ii-and-iii
James DiMeo, P.E. 7 Fan Hill Rd Monroe CT, 06468 United States Tel: 2034522814 jdimeo@monroect.gov

With GovernmentContracts, you can:
...Invitation to Bid for Construction Services Structural/Seismic Review at 395 West Main St. ...
State Government of Connecticut
Bid Due: 7/27/2026
...Type Number Description Due By Opening Status 260045 Construction Management and Inspection...
Town of West Hartford
Bid Due: 6/30/2026
...Invitation to Bid for Construction Services Troop H Maintenance Facility Repairs 100R Washington... ...
State Government of Connecticut
Bid Due: 7/07/2026
...Invitation to Bid for Construction Services HCC New Roof Installation 287 West Street ...
State Government of Connecticut
Bid Due: 6/24/2026